  1. Feasibility Study approved by SSC and CCRC

    Associated Project(s): 

    SSC confirmed funding of $15,000 for composting feasibility study 5/9/11.  Study approved 5/12/11 by Chancellor’s Capital Review Committee (CCRC) with Fall 2011 completion target.  Proposal requested from Retainer A/E Foth Engineering, which was also the A/E on the previous composting project before it was cancelled.

  2. Composting project discussions continue

    Associated Project(s): 

    Meeting with SSC and F&S to confirm details of composting feasibility study scope.  Kevin, Matt, and Morgan worked on completing the project request form.  Kevin, Carl, and Tracy worked on detailing the transportation charges budget.  Kevin also met with Dawn Aubrey about the food waste supply.

  3. Gregory Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 426 T-12 fixtures in Gregory Hall were replaced with the more energy-effiecient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,862 hours. The simple payback for this project is -4.1 years. There are 777 T-12 fixtures in Gregory Hall remaining to be switched.

  4. David Kinley Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 858 T-12 fixtures in the David Kinley Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 84,223 hours. The simple payback for this project is -5.36 years. There are 54 fixtures that remain to be done in David Kinley Hall.

  5. Morrill Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 195 T-12 fixtures in Morrill Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 25,781 hours. The simple payback for this project is -4.45 years. There are 2,594 T-12 fixtures in Morrill Hall that remain to be switched.

  6. Lincoln Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,728 T-12 fixtures in Lincoln Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 99,886 hours. The simple payback for this project is -8.03 years.

  7. Vet Med Basic Sciences Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 4,248 T-12 fixtures in the Vet Med Basic Sciences Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 796,429 hours. The simple payback for this project is 0.11 years.

  8. Vet Med Large Animal Clinic

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,990 T-12 fixtures in the Vet Med Large Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 320,117 hours. The simple payback for this project is 0.23 years.

  9. Vet Med Small Animal Clinic

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,928 T-12 fixtures in the Vet Med Small Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 67,145 hours. The simple payback for this project is 0.83 years.

  10. Vet Med Chiller Plant

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 115 T-12 fixtures in the Vet Med Chiller Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 28,742 hours. The simple payback for this project is -0.2 years.

  11. Abbott Power Plant (partial)

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 177 T-12 fixtures in the Abbott Power Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 27,909 hours. The simple payback for this project is 0.74 years.

  12. Quick payback projects

    Associated Project(s): 

    At some point in the past, perhaps FY 09, Terry Ruprecht and the Provost’s office worked out an agreement to provide a funding source for “quick payback projects.” This meant that the payback was expected to be quick, typically in the 1-3 year range. This was a onetime funding source.  A variety of projects (10-15) have been brought forward and funded at a value of approximately 1 million dollars. These projects have included lighting retrofits, fume hood removals, chiller control upgrades, adding variable frequency drives (VFDs) to HVAC equipment,  temperature control  upgrades, and hot water control valve replacements. 

  13. Digital Computer Laboratory

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 2,793 T-12 fixtures in the Digital Computer Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 422,793 hours. The simple payback for this project is 0.23 years.

  14. Coordinated Sciences Laboratory

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,903 T-12 fixtures in the Coordinated Sciences Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 295,922 hours. The simple payback for this project is 0.78 years.