  1. Wohlers Hall

    As part of the ICECF 2009 Lighting Retrofit, 1,071 T-12 fixtures in the Wohlers Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 168,358 hours. The simple payback for this project is 0.83 years.

  2. Interim Report of sustainable operations task force

    The Sustainable Campus Operations Committee (SCOC) was charged with developing the operational plans for a sustainable campus. The approach taken by the committee is aligned with campus strategic planning. The implications of the campus strategic plan and the sustainable campus plan are intimately connected, and they should be discussed in ways where their linkages are visible and understood.  Decision-making for sustainability needs integration with decision-making at all levels of university administration. In this spirit, the format of this interim report provides an overview of the preliminary goals, strategies and metrics for sustainable campus operations.

  3. Illinois Farm Sustainability Calculator

    Associated Project(s): 

    Is your farm sustainable?  How can you make your farm sustainable?  The Illinois Farm Sustainability Calculator can help you figure out these things out.  And it's pretty easy to use.  See the list of tabs on the bottom of your screen?  Navigate through them by using the grey buttons at the top of the sheets or by hitting ctrl+page down (cmd+page down on macs)  In each sheet, fill each white box with data from your farm.  Be sure to make a selection in all of the white drop-down boxes too.  If you don't know something, leave the default number or the default selection in place.  If your farm does not have ten separate fields, leave the extra field sheets unchanged.  Same goes for any extra ruminant, swine, and poultry sheets.

  4. Foreign Language Building

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  5. Dairy Cattle Composting Facility study

    Associated Project(s): 

    Previous composting study “U08067 Dairy Cattle Composting Facility” reviewed options for full scale complete composting of animal, food, agriculture, and landscape waste.  Study was cancelled before completion because ACES ran into budget issues and the whole Dairy program was slated for potential reduction or elimination.

  6. Solar Decathlon 2009 Funding Agreement

    This proposal seeks to provide funding for student education centered around the University of Illinois’s participation in the 2011 US Department of Energy Solar Decathlon Competition. Each student team participating in this prestigious, international competition is required to build an entirely solar-powered 800 sq. foot house with innovative design features. This grant will provide funds for the development of new courses and enhancement of existing courses, provisioning of course materials and software, and the sponsorship of guest lecturers and consultants ($25,000), the employment of graduate students in coordinating roles for education and volunteer engagement activities ($15,000), and student travel associated with the competition ($10,000). The last UI entry in the Solar Decathlon competition engaged hundreds of students and was the highest-placed US finisher in the Competition; furthermore this participation will require the team to raise $700,000 at a time of severe campus budget constraints. Thus, the Student Sustainability Committee is in favor of funding this proposal in the amount of $50,000.

  7. Shut the Sash Model Program Funding Agreement

    Lowering the sashes on laboratory chemical fume hoods (CFHs) can result in significant energy cost savings by reducing the volume of room air that has to be heated or cooled. This project will evaluate the resources, components, and best practices required to develop a model shut the sash program and implement it campus-wide for variable air volume (VAV) CFHs. If successful, the project could generate over $250,200 in annual cost savings. Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $4,400.

  8. Occupancy Sensors (Automatic Lighting Controls) Funding Agreement

    The goal of this project is to install lighting sensors in classrooms in several University instructional buildings (e.g. the Armory, the Foreign Language Building and Loomis). The sensors will switch off the lights in these areas, after 30 minutes of inactivity, which will reduce lighting consumption by ~30%. Additionally, having these retrofits take place at the same time as additional lighting upgrades will reduce overall installation costs. Given the reduction in lighting and electricity usage, the high visibility to students of the target areas and student interest in this technology, the Student Sustainability Committee is in favor of funding the full requested amount of $50,000.

  9. MechSE Sustainability Senior Design Funding Agreement

    Students in the Department of Mechanical Science and Engineering have been working on projects to improve the sustainability of our campus. The Department has requested support to carry out to projects (designing a sump pump water collection and use system, and assisting with the retro-commissioning of Siebel Center), which will are high-impact projects and will involve students. Thus, the Student Sustainability Committee is in favor of funding them to the amount of $6,000 ($4,000 for the water project, and $2,000 for the retro-commissioning project – with the expectation that Computer Science will underwrite the remainder).

  10. Everitt Electrical Building

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  11. Henry Administration Building

    A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.

  12. Armory

    A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.

  13. Mumford Hall

    A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.