    Hi Pete and Shawn—

    There were no zero-waste activities this past week. I hope to catch Morgan at the Solar Farm Open House this afternoon and touch base on the glove recycling program.

    Best regards,
    Marya Ryan

  2. Provost describes iCAP in space inventory letter

    Provost Andreas Cangellaris included this statement about the iCAP in the April 2019 letter (attached) to colleges and instructional units about the Space Inventory:

    "I also want to take this opportunity to recap several campus initiatives regarding space stewardship. As you may be aware, the University of Illinois at Urbana-Champaign established the Illinois Climate Action Plan (iCAP) in May 2010 and updated the document in 2015. The document outlines strategies, initiatives, and targets toward meeting the stated goal of carbon neutrality by 2050. The targets and strategies detailed in the plan represent a series of commitments the University is making in order to achieve its sustainability goals, including the Net Zero Space Growth Policy as found in the CAM. I encourage you to review our commitments as outlined in the climate action plan and the Net Zero Space Growth Policy"

  3. CEE student works with Dr. Schmidt and F&S

    Junren Wang, an undergraduate student in Civil and Environmental Engineering, working under the guidance of Dr. Art Schmidt, researched the impacts of existing green infrastructure on campus property and the relationship to potential cost reductions from City Stormwater Utility Fees.  She provided the following update and attached files.

    Dear All:

    This is an update for the GI project:

    ECE Permeable Pavement(U08032): All the necessary calculations have been completed. We may get 0.22% credit for this parcel.

    Design Center Detention(U16015):All the necessary calculations have been completed. We may get 0.307% credit for this parcel.

    FPC Detention(U17018): All the necessary calculations have been completed. We cannot get credits from this infrastructure. But we may get $250/10yr incentives.

    IGB Detention: More information need for the pump as mentioned last time. But it seems that we cannot get credit from this infrastucture.

    Waiting for your suggestion this Thursday!

    Thanks,

    Junren

  4. Weekly Updates for Zero Waste

    Associated Project(s): 

    Hi Pete and Shawn--

    Zero waste activity this week was a brief email to Sara Portillo of Kimberly-Clark to stay in touch about the glove recycling program. She was hoping we could address lab participation with the PWR SWATeam sooner than the fall. It's not clear that there will be anything specific to present to the team before then.

    Best regards,

    Marya Ryan

  5. Weekly Updates for Zero Waste

    Associated Project(s): 

    Hi Pete and Shawn—

    Zero waste activities this week were a few emails about getting glove recycling on the PWR SWATeam agenda. The current plan is to bring the topic to the team in the fall, when the Green Labs Committee becomes active.

    Best regards,

    Marya Ryan

  6. Week 10 Update

    Associated Project(s): 

    Good Afternoon All,

    This week’s meeting was productive and we were able to set up the excel spreadsheets needed to record data on the chiller plants, Abbott, and potable water. Over the past week I researched and created a checklist and table for conducting a water audit. The checklist will be shared here after some final corrections are made to it. I was able to determine what was needed and where stamped flow volumes are marked on each fixture. If there is no stamp on faucets there is a simple tool called a flow rate bag that will be purchased so auditors can determine the flow manually. As for urinals and lavatories the model and serial number will be recorded to search the model manually and figure out the flow rate. There is no hand tool to determine these flow rates.

    The spreadsheets will be given to Mike Marquissee so his team can collect the data we need faster. Once the data is collected some analysis of it will be done to help us determine efficiencies and water consumption of the different facilities. Also it will help us figure out if we have line losses in our systems.

    The next steps to be done this week is to get these excel spreadsheets to Mike and give him some time to gather all of the data we need. Analyze the raw data and compare the values to industry and national standards. This will allow us to figure out where we stand in our water consumption. Finish editing the water audit checklist and add snap shots of where the stamps can be located so it will be easier for auditors to know where to look. The water audit program we are creating right now will mainly be used for bathrooms and kitchens in university buildings. Research laboratories and student laboratories will be done by another team and program in the works.

    Thank You,
    Austin Jung

  7. Weekly Updates for Zero Waste

    Hi Pete and Shawn--

    This week's zero waste activities were

    • Email to put David Akins of the School of Art and Design in touch with Morgan to move forward with relocating the EPS densifier to Art and Design. She will coordinate with him, Joe Pickowitz, and BK Sharma to set up a time for Mr. Akins to see the densifier.
    • Emailed Julija Sakutyte of the PWR SWATeam to get me, Morgan, and Sara Portillo of Kimberly-Clark on an upcoming PWR SWATeam agenda to discuss the glove recycling program. Currently, it looks like it could be May before everyone's schedules align.

    Best regards,

    Marya Ryan

  8. Week 7-9 Update

    Associated Project(s): 

    Good afternoon all,

    This week’s meeting was short but was necessary to update Morgan on the progress made over the past three weeks and to determine the next steps to be taken. To catch everyone up I have attached all of my findings for information on the chilled water loops. A quick summary of what I discovered is that the vet med chiller plant is on a separate loop because of how far it is from other campus buildings. In its loop it has 5 different buildings it provides chilled water to. The other 6 chiller plants are all connected in the main chilled water loop. The loop consists of about 115 different campus buildings and they can be seen in the document. The buildings found in this loop were found by sorting the utilities billing information by chilled water vendor. The five chiller plants on the main loop also have the capability to isolate themselves from the main loop and provide certain buildings with chilled water. This list can also be found in the document.

    I then read through the BIF’s plumbing materials list to see if it had any information on low flow fixtures. I found out that for some of the listed items like the lavatories in the description says “max flow 0.5 GPM in compliance with energy policy act of 1992 and ASME/ANSI standard A112.18.1M.” We do not know if it has all the listed fixtures and will have to continue looking into other building plumbing lists.

    Besides researching I also created a rough water audit plan for campus buildings. This will be a very intensive process as most water audits need to test every water fixture to get the actual flow rates of them. The first part of the audit will be reviewing data on each building to see the history of water consumption. Next the billing and metered water will be compared to see if there is a loss of water. After the data collection and comparison is complete auditors will walk through the building to see if there are any visible leaks and test each water fixtures actual flow rate. The flow rate will be recorded and used to compare each building against each other to see which will but retro fitted first based on most water consumption.

    For this upcoming week I will be researching and creating more questions to ask about the chiller plants and low flow water fixtures. We will try to plan meetings or phone calls with other knowledgeable people to see if they have information that can help our progress and clarify any questions we have. I will also be creating a checklist that can be given to interns or workers on how to perform the walk through part of the water audit and finding vendors that can sell us the tools needed to determine flow rates of different water fixture.

    Thank You,
    Austin Jung

  9. Weekly Updates for Zero Waste

    Associated Project(s): 

    Hi Pete and Shawn—

    Zero waste activities this past week were that I heard back from the School of Art and Design, which may be interested in acquiring the EPS densifier. I have an email out to Morgan, Pete, and Joe Pickowitz to identify the right person for Art and Design to work with on a possible transfer.

    I also reviewed further PWR-SWATeam comments on the waste-reduction goals for iCAP Objective 6.1.

    Best regards,

    Marya Ryan

  10. Second Nature Payment to UIUC

    Second Nature paid UIUC for the sale of vintage 2017 carbon credits to Bonneville Environmental Foundation (BEF) as part of UIUC's participation in the Carbon Credit and Purchasing Program.

    Second Nature transferred 2,865 vintage Carbon Credits (VCUs) to BP Target Neutral (BPTN) on behalf of UIUC.

    For this sale, UIUC receives $6.25 per credit. The total amount paid to UIUC for this sale is $17,906.25

     

    An email of confirmation of this payment is attached below.

     

  11. Week 6 Update

    Associated Project(s): 

    Good afternoon all,

    This week’s meeting went well and we were able to discover more information on the low-flow water fixtures installed in some of the university buildings. I was also able to update the excel sheet, to the correct display for when we get data. At the beginning of the meeting, I was able to catch the group up on the information I read in the Master Utilities Plan and Combined Heat and Power (CHP) convention. The CHP convention had very general information on CHP generation and some specifics in areas we are not interested in. There was not much information on how water consumption is monitored or improving.

    The Master Utilities Plan was very informative on how Abbot Power Plant and the Chiller plants work. It gave good background information and the condition they are in. It also provided suggestions on how to bring them back up to operational standards.

    During the meeting, we called Mark Warner, and asked him for more information on the low-flow water fixture installations. We were not able to gain an active list of updated buildings, but were able to learn some other information. We learned that Guy Grant was in charge of the program, and we will contact him in the following weeks. We also found out there were some complaints about the low-flow fixtures which led to the removal of some of these fixtures. For example, some of the sinks are not providing enough hot water. Another contact we will be reaching is the Refrigeration Foreman to learn more about the chiller plants.

    For the following meeting, I will continue my research on chiller plants and generate a list of questions about the projects to ask Kent Reifsteck, the Director of Utilities at F&S. I will also be using data on chilled water billing for each university building to figure out which buildings are in the chilled water loop. The low-flow water fixture project has been updated to involve which buildings have had them removed.

    Thanks,

    Austin Jung