  1. Cost estimates requested for first 5 locations

    Associated Project(s): 

    Transportation staff submitted work order requests to have cost estimates for time and materials for the first five locations to be upgraded from donut hole bike parking to U-rack bike parking.  The remaining nine locations need to have CAD drawings produced and apprroved before costs can be estimated.  

  2. Campus Bike Parking Overhaul Phase 1_Funding Award and Acceptance

  3. Campus-wide Bike Parking Funding Agreement

    Bike parking is essential for supporting green commuters as well as raising awareness and supporting biking on campus. In 2009, the SSC funded $10,600 for standard bike parking at three popular locations on campus, Freer Hall, the Undergraduate Library, and the Agricultural Engineering Sciences Building. Later in 2012, SSC provided $225,000 in order to replace old donut-hole bike parking with U-loop parking at the Armory, the Main Library, the Foreign Language Building, and other high-traffic areas on campus.

  4. Roger Adams Laboratory (portion)

    Associated Project(s): 

    Sixty-four lighting fixtures in a portion of the Roger Adams Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 10,092 hours. The Simple Payback for changing the fixtures in the Roger Adams Laboratory is 2.01 years.

  5. Bevier Hall

    Associated Project(s): 

    A total of 1,982 lighting fixtures in Bevier Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 338,894 hours. The Simple Payback for changing the fixtures inBevier Hall is 1.26 years.

  6. Noyes Laboratory

    Associated Project(s): 

    A total of 1,574 lighting fixtures in the Noyes Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 276,264 hours. The Simple Payback for changing the fixtures in the Noyes Laboratory is 0.94 years.

  7. Davenport Hall

    Associated Project(s): 

    A total of 2,030 lighting fixtures in Davenport Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 363,141 hours. The Simple Payback for changing the fixtures in Davenport Hall is 1.36 years.

  8. Freer Hall

    Associated Project(s): 

    A total of 629 lighting fixtures in Freer Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 100,595 hours. The Simple Payback for changing the fixtures in Freer Hall is 2.49 years.

  9. Natural History Building

    Associated Project(s): 

    A total of 2,153 lighting fixtures in the Natural History Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 345,994 hours. The Simple Payback for changing the fixtures in the Natural History Building is 2.37 years.

  10. Main Library (6th Stack)

    Associated Project(s): 

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  11. Foreign Language Building

    Associated Project(s): 

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  12. Krannert Center for the Performing Arts

    Associated Project(s): 

    A total of 1,090 lighting fixtures in the Krannert Center for the Performing Arts were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 171,871 hours. The Simple Payback for changing the fixtures in the Krannert Center is 2.26  years.

  13. Bike Parking Funding Agreement

    The goal of this project is to fund installation of bicycle parking facilities at the Undergraduate Library, the Ag. Sciences Engineering Building and Freer Hall. Cycling is a sustainable form of transportation, highly used by the student body, and inadequately supported on campus. Thus the students sustainability committee is in favor of funding the full requested amount of $10,600.  

  14. Everitt Electrical Building

    Associated Project(s): 

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  15. Agriculture Engineering Sciences Building

    Associated Project(s): 

    A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.

  16. Henry Administration Building

    Associated Project(s): 

    A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.

  17. Armory

    Associated Project(s): 

    A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.

  18. Mumford Hall

    Associated Project(s): 

    A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.

  19. Plant Sciences Laboratory

    Associated Project(s): 

    A total of 1,009 lighting fixtures in the Plant Science Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 159,182 hours. The Simple Payback for changing the fixtures in the Plant Sciences Laboratory is 3.25 years.