Projects Updates for place: Harding Band Building

  1. Meeting with F&S officials

    Associated Project(s): 

    Met with the university Facilities and Services officials and LED staff on Wednesday, September 21, 2016, to discuss the progress of LED Campus projects so far. The main focus of the meeting was Exit signs in the buildings. Meeting was hosted by Mogan Johnston, and attended by Ken Buenting, Brian Finet, Steven Bainbridge, and Patty Douglas.

  2. ECBS Objective 4 Subcommittee Meeting Minutes

    The ECBS Objective 4 Subcommittee met Tuesday, February 16 to continue fleshing out the ECBS SWATeam's fourth iCAP objective, which has to do with increasing campus engagement in sustainability.  Discussion continued on ECIP and potential changes for the upcoming year- a major issue is raising awareness of this program and others like it. By the conclusion of the meeting, the focus of the subcommittee shifted to creating and sending recommendations to the iCAP Working Group, such as a Green Labs Initiative proposal as well as continuing Eco-Olympics or initiating a similar program that would serve as dorm resident engagement.  The next meeting is scheduled for Tuesday, February 23.

  3. ECBS Objective 4 Subcommittee Meeting Minutes

    The ECBS Objective 4 Subcommittee held its first meeting on Tuesday, February 9.  Discussion revolved around the issue of tying all existing campus engagement programs (e.g., ECIP, Certified Green Office Program, revolving loan fund, etc.) together into one campus-wide brand.

    Attached Files: 
  4. FY15 ECIP award winners announced

    Occupant Action Category  % Improvement  Incentive Award
    1. Admissions and Records
        Building  
     39.2%  $61,778
    2. Agricultural Bioprocess
        Laboratory 
     25.2%  $34,110
    3. Christopher Hall  24.9%  $18,297
    4. Turner Hall     11.4%  $16,075
     Energy Advancement Category  % Improvement  Incentive Award
    1. David Kinley Hall 39.9%   $33,701
    2. Lincoln Hall 32.0%   $15,961
    3. Early Childhood Development
        Building
    24.2% $10,000
    4. Davenport Hall  19.6%  $10,000

     

  5. FY14 ECIP Winners Announced

    CHAMPAIGN, IL (October 22, 2014) – Eight facilities on the Urbana campus will win funding for facility improvements as recipients of the 2014 Energy Conservation Incentive Program (ECIP) awards on Wednesday, October 22 at 3:00 p.m. in Illini Union 314B as a part of the Illinois Climate Action Plan (iCAP) Forum.

    Last year, the ECIP awarded more than $250K in pre-approved energy conservation projects.

    The list of FY14 winning facilities is attached.

  6. Campus approves an additional $100K for LED Exit Signs

    Associated Project(s): 

    After the successful completion of the recent LED Exit Sign upgrades, the F&S Building Maintenance division has received approval for another round of LED Exit Sign upgrades.  Ken Buenting, Sharon Ball, Ryan Wild, and Morgan Johnston met to discuss the prioritization process for identifying the next buildings to address.  Buildings will be ranked according to student/transient visitor contact hours (if this information can be obtained), results of campus code fire safety reports, and coordination with other projects or funding.

  7. LED Exit Sign projects completed

    Associated Project(s): 

    In support of the Chancellor's commitment to making the University of Illinois an LED Campus, 531 LED way-finding signs have been installed in eight campus buildings: Grainger Library, Animal Science, Roger Adams Lab, Engineering Science Building, Turner Hall, Main Library, Education Building, and the Chem. Life Sciences Lab.

  8. Spurlock ECIP project

    Mike,

    As we discussed on the phone, our Electricians have visited with the folks at Spurlock and secured a preliminary scope of work (see attached). Because of the complex existing lighting system in the building our Electricians will require some assistance from our In-House Engineering staff. I understand that Spurlock has been allotted $22K for this work. I am going to ask Robert to give us an estimate of the Engineering charges and if they exceed 10% of the budget we will discuss scaling back some of the scope with the folks at Spurlock. The AiM project is 2693 and the Engineering estimate work order is 10282137.

    Thanks,

    Thomas Doud

    Construction Superintendent

    Construction Services Division

    University of Illinois, Facilities and Services

    217-244-3686

    Attached Files: 
  9. updated list of LED exit sign buildings

    Associated Project(s): 

    FY07 - 13 buildings

    • 112 - MEB
    • 26 - Altgeld
    • 12 - Noyes
    • 99 - Undergrad
    • 210 - DCL
    • 15 - Engineering Hall
    • 152 - Hydrosystems
    • 67 - Loomis
    • 29 - MEL
    • 34 - MSEB
    • 24 - Newmark
    • 13 - Talbot
    • 42 - Transportation Bldg

    FY08 - 12 buildings

    • HARDING BAND BUILDING #4
    • ILLINI HALL #65
    • OPTICAL PHYSICS BUILDING #165
    • ILLINOIS PROGRAM FOR RESEARCH & HUMANITIES #221
    • ARCHITECTURE BUILDING #50
    • NOBLE HALL #90
    • ART & DESIGN #219
    • MUSIC BUILDING #39
    • FLAGG HALL #89
    • UNIVERSITY HIGH SCHOOL #61
    • ARMORY #6
    • FOELLINGER AUDITORIUM #7

    FY14 – CURRENT PROJECT

    • #324 Grainger Library
    • #174 Engineering Sciences
    • #116 Roger Adams Lab
    • #336 Animal Sciences
    • #197 Turner Hall
    • #370 South Studio #5
    • #371 South Studio #7

    OTHER PROJECTS

    • #339 Temple Buell Hall
  10. update on project progress

    Associated Project(s): 

    Ken Buenting, Sharon Ball, Eva Sweeney, Morgan Johnston, and Ryan Wild met to review progress on the LED Exit Sign work.  Ken reported great progress with four buildings complete and one in progress: Grainger, RAL, Animal Sciences Lab, and the Engineering Sciences Building.  They are in Turner Hall now.  Just over $24K has been spent so far through the contractor.  They will move on to the Main Library and the Education Building next.

    The current implementation process is as follows:

    1. Ryan Wild and Morgan Johnston work with others to identify the priority list of buildings.
    2. Eva Sweeney will review records to ascertain whether the fixtures are connected to an emergency generator or will need battery backup.
    3. Sharon Ball and team will do the initial count of fixtures.
    4. Ken Buenting will direct the hired contractor to replace the existing fixtures and provide data sheets for our records.
    5. Eva Sweeney and Ryan Wild will identify additional signage installation needs.
    6. Ken will direct the F&S electricians to install the additional signs.

    Eva had Ken remove Temple Buell Hall from the list because it is being handled through another project.  Also, through other funding, South studio five and seven were completed.

  11. News about Christopher Hall winning

    Saving energy pays off for Christopher Hall

    Clayton Glazik 3/5/2014

    Since we were little our parents have told us to turn off the lights after we leave a room. That is just what the Christopher Hall residents at the University of Illinois did in 2013. By shutting the lights off in rooms not in use, switching their lights to compact fluorescent light (CFL) bulbs, as well as other sustainable practices, the building was able to cut back its energy usage by 30.6% from the previous year.

    The campus Facilities & Services (F&S) hosted a reception at Christopher Hall on February 14 to celebrate the building’s accomplishment in the F&S Energy Conservation Incentive Program (ECIP). A campus-wide sustainability effort, ECIP provides building upgrades to facilities that produce top energy conservation results in energy advancement and occupant action categories. ECIP calculates how much money the buildings are saving in energy reduction and gives it back to the building to pay for upgrades.

    Christopher Hall, which houses the Family Resiliency Center (FRC), the Autism Program (TAP), several classrooms, faculty and staff offices, and a family research home, saved nearly $22,000. According to FRC Director Barbara Fiese, a building committee recommended investing the funds in a bike rack since so many people cycle to work, as well as other items that can further reduce energy usage.

    In 2010, the University of Illinois published a climate action plan that set aggressive timeliness for reducing energy consumption on campus. Currently, there are more than 300 such active projects, which can be tracked at http://icap.sustainability.illinois.edu/projects.

    “At the end of the day, if we really want to meet ICAP goals, we have to do more,” says Al Stratman, F&S executive director. “That is why we came up with ECIP, which mirrors the campus goals.”

    At the award ceremony, faculty and students pledged to continue reducing energy in their lifestyles by taking public transportation, using natural light in their offices rather than electricity, and shopping more at local food markets instead of commercial grocery stores. With their current sustainable practices and these recent pledges, Christopher Hall will continue slashing their energy consumption, making the Illinois campus a greener place.

    (from Family Resiliency Center news http://illinois.edu/lb/article/3493/82438)

  12. News about Library winning

    Libraries Win Energy Awards

    Jan 23, 2014

    The Energy Conservation Incentive Program (ECIP) at Illinois awards building upgrades on campus in facilities which have produced top energy conservation results. Each year eight campus buildings receive ECIP awards in two separate categories. Those selected have demonstrated the greatest percentage of energy conservation over a one-year period.

    In 2013, three of eight awards went to Urbana campus libraries. The Undergraduate Library won 1st Place in the Occupant Action category; in the Energy Advancement category, the Main Library took 3rd Place while the Grainger Engineering Library took 4th Place. These libraries will work with the Utilities & Energy Services Division within Facilities & Services at the University to implement upgrades to their appearance or functionality.

    The Energy Advancement category is for campus buildings whose energy reduction is the result of central funding from a significant energy conservation project. The Occupant Action category is for those buildings which have not benefited from such projects in the last fiscal year.

    To learn more about the ECIP, please visit go.illinois.edu/ecip.

    (from Library News at http://www.library.illinois.edu/news/ECIP2013.html)

  13. Exit Signs to be upgraded to LEDs in 7 buildings

    Associated Project(s): 

    Building

    Bld #

    Cost (labor/material)

         

    Animal Science Lab

    165

    $10,900

    Temple Buell Hall

    339

    $7,300

    Turner Hall

    197

    $10,500

    Grainger Library

    324

    $8,200

    Roger Adams Lab

    116

    $12,300

    Engineering Science Bld

    174

    $13,400

         
       

    Cost (Material only)

    Abbott Power Plant

    120

    $36,900

         
     

    Total

    $99,500

     

  14. Printing and Photographic Services Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 862 T-12 fixtures in the Printing and Photographic Services Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 151,916 hours. The simple payback for this project is 3.15 years.

  15. Campus funding allocated for LED exit signs

    Associated Project(s): 

    The LED Campus commitment includes having all the interior wayfinding signs converted to LED by 2025.  This is primarily LED Exit Signs.   We had hoped to use the Revolving Loan Fund to implement another phase of the LED Exit Sign project.  However, that funding is only applicable if there is a reasonable payback through utility savings.  LED Exit Signs have a good payback, but not through Utilities.  The savings come from reduced maintenance, which also provides a reasonable payback.   Given the shortfall in maintenance funding and the Chancellor’s commitment to becoming an LED campus, Mike Andrechak agreed to provide $100,000 per year for two years toward LED Exit Signs.  This funding could be continued in future years, subject to funding approval.

  16. FY13 ECIP Award Winners Announced

    Energy Advancement Category

    1. Atmospheric Sciences Building            53.3%
    2. Spurlock Museum                                      44.5%
    3. Main Library                                                 43.1%
    4. Grainger Engineering Libra                    41.3%

    Occupant Action Category

    1. Undergraduate Library                            35.2%
    2. Law Building                                                  35.1%
    3. Christopher Hall                                          30.6%
    4. Henry Administration Building             28.4%
  17. Explanation of calculations

    We take total energy usage by building (electricity, Steam, Nat Gas and Chilled Water) convert all of those to one common unit, MMBTU (million British Thermal Units) and after adjusting for the weather differences between years, compare each building's annual usage with the year before.  We then convert the change into a percentage and then rank all eligible buildings by percentage saved.  The top four in each category win first through fourth.     Having won in FY13 does not disqualify you from winning in the future.  The goal is to encourage individual contributions to saving energy.   Mike Marquissee

  18. Agriculture Bioprocess Lab

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 436 T-12 fixtures in the Agriculture Bioprocess Lab were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,289 hours. The simple payback for this project is 3.62 years.