You are here

Project Updates for collection: 2015 iCAP Objectives

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Idea for LEED transportation credit

    The LEED transportation credit for encouraging low emission vehicles can be obtained if there are dedicated spaces for low-emission vehicles near the building in question.  In general, the University is not adding new parking spaces for new buildings, so it is difficult to achieve this LEED point.  One method is to add a Zipcar space for the building, and another is to add an Electric Vehicle charging station.  Grant Colella, a Project Manager at F&S, suggested a long-term plan to change all of the campus fleet to low emission vehicles, so the dedicated service vehicle spaces would also be low emission vehicle spaces.

  2. EGen004 Electrification Study recommendation - Returned

    The iCAP Working Group (iWG) met on December 6, 2016, to discuss the SWATeam recommendation, eGen004 Electrification Study. The iWG agreed to return the recommendation to the eGen SWATeam for further discussion with F&S, iSEE, and other stakeholders.

    See SWATeam recommendation eGen004 Electrification Study here.

  3. EGEN SWATeam Meeting (12.2.16)

    The EGEN SWATeam held their final meeting for the Fall 2016 semester. Topics covered include:

    • Guest presentation by Niharika Kishore regarding rooftop solar on campus
    • Potential recommendations to Working Group
    • Potential solar: greenspace vs. rooftop vs. parking lot cover
  4. archived info - previous project intro

    Associated Project(s): 

    A key piece of the Institute’s mission is to prepare the next generation of leaders in sustainability. To that end, its first education initiative is the development of a campuswide undergraduate minor in sustainability.

    This minor, named the Sustainability, Energy, and Environment (SEE) Fellows Program, will promote systems-level thinking about issues of sustainability. Students will develop an integrative understanding of sustainability and understand the trade-offs, barriers, and implications for sustainable decision making. The minor will replace the existing Environmental Fellows Program and provide a broader opportunity for interdisciplinary education, internships, and capstone research projects in the area of sustainability.

  5. Status update for purchasing offsets

    iSEE is working with the Purchasing Division to publish a Request for Proposals (RFP) to purchase carbon offsets.  These will include replacement offsets for the 2015 Carbon Credits (CCs) sold, and an option to purchase an additional 10,000 CCs to start an internal virtual storeroom for voluntary departmental offsets.

  6. EGEN SWATeam Meeting (11.9.16)

    The EGEN SWATeam held their fourth meeting for the Fall 2016 semester. Topics covered include:

    • Guest presentation by Yu-Feng Forrest Lin to discuss his work on investigating campus geothermal properties
    • View draft recommendation for Petascale offsets
    • Review draft recommendation for on-campus solar
  7. Urban Legend - debunked

    "As the University of Illinois at Urbana-Champaign considers installing more solar photovoltaic modules on the roofs of buildings, the discussion turns to the type of mounting systems to consider. This discussion often elicits the tale of the modules that were originally installed on the roof of the Business Instructional Facility (BIF) using a ballast-mounted system, that is, a mounting system held down using heavy weights such as concrete blocks. The story goes that a few of the PV modules blew off the roof of the building, and this subsequently led to the modules being installed with a racking system attached to the roof of the building.

    This story is an urban legend..."

    Read file for more information and photos.

     

    Attached Files: 
  8. SWATeam assessment for FY16

    Associated Project(s): 

    Status: In Progress
    • Several initiatives underway focusing on student engagement — including Illini Lights Out and Eco-Olympics.
    • Initiatives are continuing for staff and faculty engagement — Certified Green Office Program, Energy Conservation Incentive Program (ECIP).
    • Forming a plan to work toward a Green Labs program that would focus on reducing energy consumption in labs (e.g. fume hoods, refrigeration).

    Attached Files: 
  9. Biomass Boiler at Energy Farm

    Construction is underway in Fall 2016 to install a 200 kW biomass boiler at the Energy Farm. This system will initially satisfy all heating needs for the greenhouse onsite, and will replace the current propane heating system. In the future, more buildings may be added to the boiler system.

  10. Geothermal Profile Project

    Beginning Fall 2016, a team at the Illinois State Geological Survey (ISGS, a division of the prairie Research Institute) led by Illinois Professor Yu-Feng Forrest Lin is conducting a series of detailed observations of the geothermal profile on campus - including high-resolution temperature profiling and thermal analysis. The team will drill to 330 ft and install a geothermal loop and fiberoptic cables. Results will help determine the feasibility of implementing geothermal systems on campus by identifying costs and possible challenges.

    Professor Lin has coordinated with faculty from the University of Wisconsin to incorporate lessons learned from their implementation of a geothermal exchange system at the nearby EPIC health care systems campus in Verona, WI.

    Professor Lin's team began drilling on 9/19/16. Daily drilling progress is logged and can be found by clicking this link.

    Attached Files: 
  11. 2015 iCAP solar objective and strategies

    Associated Project(s): 

    The 2015 iCAP, chapter 3, objective 2 is "Expand on-campus solar energy production.  By FY20, produce at least 12,500 MWh/year, and by FY25 at least 25,000 MWh/year, from solar installations on campus property."

    The 2015 iCAP also described the following potential strategies for achieving this objective:

    "2. Expand On-Campus Solar Energy Production

    The campus has a 33 kW photovoltaic array on the roof of the Business Instructional Facility (with an annual production of 44 MWh/yr) and a 14.7 kW ground-mounted array at the Building Research Lab (20 MWh/yr).  During FY15, we began installation of a 300 kW array on the roof of the new Electrical and Computer Engineering Building (402 MWh/yr), and the 5.87 MW Solar Farm on the south campus (7,860 MWh/yr). There is also a solar thermal array on the roof of the Activities and Recreation Center.  There are many other buildings, parcels of land, and parking lots that are well positioned to host sizeable photovoltaic and/or solar thermal arrays.  Although each array in itself would make a small contribution to campus energy generation, taken together the contribution could be significant.

    Identify best solar locations and implement solar projects

    The solar consultation group is identifying the best places to install the next round of photovoltaic projects, and planning to move forward on several projects simultaneously.  Solar thermal may make sense in some situations, as well.  Student design teams could be organized through classes and volunteer groups to assist with the planning and prioritizing of on-campus solar installations.

    Require solar PV on rooftops for new construction and major renovations

    The best time to plan for the installation of photovoltaics on a building is during the design phase.  The campus could implement standards requiring that all new construction and additions include solar photovoltaics on the roof.   In some cases it may also be effective to install photovoltaics on the exterior walls of the buildings."

  12. EGEN SWATeam Meeting notes (10.12.16)

    The EGEN SWATeam held their third meeting for the Fall 2016 semester. Topics covered include:

    • Development of formal SWATeam recommendatino to the working group regarding offsets for Petascale
    • RECs - does this get us to our goal?
    • Potential recommendations for rooftop solar
  13. Campus Solar Deployment Roadmap presentation

    AASHE Conference, October 11, 2016 presentation

    Using Campus Solar Deployment Roadmaps to Guide University Investment: The Midwest Renewable Energy Association (MREA), Second Nature, and TurningPoint Energy have developed an approach with four Midwest universities to define opportunities for on- and off-campus solar investment through a Campus PV Deployment Roadmap. In this panel, participants will hear presentations about the roadmapping process in general, specific incentives to universities and students, financial modeling and assistance offerings, and first-hand experience from one of our pilot universities.

Pages