You are here

Projects Updates for place: Public Safety Building

  1. Campus Transportation Advisory Committee (CTAC) spring 2023

  2. 28 bin order arrived

    Associated Project(s): 

    On Friday, February 17, the bin order from MAX-R arrived at the Waste Transfer Station. 20 26-gallon bins (standard size) and 8 18-gallon (slim) bins arrived.

  3. Campus Transportation Advisory Committee (CTAC) fall 2022

  4. Undergraduate Library rehomes 6 3-bins to other facilities on campus

    Associated Project(s): 

    The Undergraduate Library rehomed 6 3-bins at the onset of redevelopment:

    • Armory took 4 (P10E62260 second floor east side right out of the elevator, P10E62264 third floor southside center outside restroom, P10E62261 third floor northside center outside of restroom, P10E62265 in landing area in front of Room 232 under glassed bulletin board).
    • Mechanical Engineering Laboratory took 2 (P10E62262 and P10E62263 on first and second floors).
  5. Campus Transportation Advisory Committee (CTAC) spring 2022

    Please see attached the final presentation for the CTAC spring 2022. We also talked about abandoned bicycles and Campus Landscape Master Plan during this meeting. Also watch the meeting recording and read the chat from during the meeting: https://uofi.box.com/s/lv1xbqlcevdp6f2dfmiep2fpx3cq2zde

  6. update on indoor bin count

    Associated Project(s): 

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal. ~Sydney Trimble

  7. Master List of All Buildings With the 3-Bin Containers Updated

    Associated Project(s): 

    The master list for indoor 3-bin containers has been updated. This list includes all 3-bin station deployments, with information regarding the building, floor, and P-Tag associated with each individual bin. If applicable, additional information regarding their location is provided as well.

    See the attached file to review the updated master list for the 3-bin containers.

  8. iCAP Indoor Bins Metric Update

    Associated Project(s): 

    Hi Morgan!

     

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal.

     

    In the future, I think the iCAP team should consider changing the metric from number of buildings to number of deployed bins because not all campus buildings would be applicable for these bins. Especially if the buildings are offices, residential, or extension related. Orchard Downs and

     

    I also went ahead and updated the bin location master list that came with the project so your team can upload it. It was outdated and I have upgraded the layout of the list so it is easier to find information.

     

    Best regards,

     

    Syd Trimble

    F&S Waste Management Intern

    fandssydneyt2@mx.uillinois.edu | Skype: (217) 333-1128

    Garage & Carpool, Office D-3

    In Office primarily Monday, Tuesday, Thursday afternoons

    University of Illinois Urbana-Champaign

    Environmental Sciences - 2022

     

     

  9. 15 permanent bicycle registration signs installed

    15 metal signs to promote bicycle registration have been installed. These locations are:

    1. Snyder Hall
    2. Weston Hall
    3. Bike Shelter (new) by Flagg Hall
    4. Nugent Hall
    5. Hopkins Hall – covered bike parking
    6. Bousfield Hall – covered bike parking
    7. South of Wassaja Hall – covered bike parking
    8. Busey Evans
    9. Allen Hall
    10. LAR
    11. ISR (new bike racks on North side)
    12. ISR - North East location - 64 bike racks
    13. Illini Union South
    14. Illini Union North
    15. ARC

Pages