1 bin placed at Henry Administration Building
P10G96444 placed near Room 364.
P10G96444 placed near Room 364.
Please see attached the final presentation for the CTAC spring 2023. Watch the meeting recording here: https://uofi.box.com/s/mid9gjqnhyziake9txcdf9jee08rgx6h
P10G96441 placed on ground floor, P10G96443 placed on second floor, P10G96442 placed on third floor.
On March 27, 2023, it was recorded that 63 buildings across campus have at least one of the new 3-bins.
P10H08409 north of main hallway and P10H08410 south of main hallway.
P10E62230 placed in the basement, P10H08411 placed on second floor, and P10H08412 placed on third floor.
P10H08408 placed on first floor near room 180, P10H8407 placed on second floor near main stairs, and P10H8406 placed at the east stair main entry.
On Friday, February 17, the bin order from MAX-R arrived at the Waste Transfer Station. 20 26-gallon bins (standard size) and 8 18-gallon (slim) bins arrived.
Please see attached the final report on Bike registration Signs 2.0 project submitted on January 24, 2023.
P10G97104 between 206 and 204 in hallway.
Please see attached the final presentation for the CTAC fall 2022. Watch the meeting recording here: https://uofi.box.com/s/6fp2xuq2qnwv4vgm34itku4pbdy2bioy
The Undergraduate Library rehomed 6 3-bins at the onset of redevelopment:
Bicycle registration reached over 1000 fee payments, equating to $9,980 (not including the CFOPAL payments).
Please see attached the final presentation for the CTAC spring 2022. We also talked about abandoned bicycles and Campus Landscape Master Plan during this meeting. Also watch the meeting recording and read the chat from during the meeting: https://uofi.box.com/s/lv1xbqlcevdp6f2dfmiep2fpx3cq2zde
Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal. ~Sydney Trimble
The master list for indoor 3-bin containers has been updated. This list includes all 3-bin station deployments, with information regarding the building, floor, and P-Tag associated with each individual bin. If applicable, additional information regarding their location is provided as well.
See the attached file to review the updated master list for the 3-bin containers.
Hi Morgan!
Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal.
In the future, I think the iCAP team should consider changing the metric from number of buildings to number of deployed bins because not all campus buildings would be applicable for these bins. Especially if the buildings are offices, residential, or extension related. Orchard Downs and
I also went ahead and updated the bin location master list that came with the project so your team can upload it. It was outdated and I have upgraded the layout of the list so it is easier to find information.
Best regards,
Syd Trimble
F&S Waste Management Intern
fandssydneyt2@mx.uillinois.edu | Skype: (217) 333-1128
Garage & Carpool, Office D-3
In Office primarily Monday, Tuesday, Thursday afternoons
University of Illinois Urbana-Champaign
Environmental Sciences - 2022
On March 3, 2022, it was recorded that 56 buildings across campus have at least one of the new 3-bins.
SSC received semester report for Fall 2021 for Bike Registration Signs project on January 6, 2022. Please see attached.
15 metal signs to promote bicycle registration have been installed. These locations are: