You are here

Projects Updates for place: North Campus Parking Deck (NCPD)

  1. 28 bin order arrived

    Associated Project(s): 

    On Friday, February 17, the bin order from MAX-R arrived at the Waste Transfer Station. 20 26-gallon bins (standard size) and 8 18-gallon (slim) bins arrived.

  2. Undergraduate Library rehomes 6 3-bins to other facilities on campus

    Associated Project(s): 

    The Undergraduate Library rehomed 6 3-bins at the onset of redevelopment:

    • Armory took 4 (P10E62260 second floor east side right out of the elevator, P10E62264 third floor southside center outside restroom, P10E62261 third floor northside center outside of restroom, P10E62265 in landing area in front of Room 232 under glassed bulletin board).
    • Mechanical Engineering Laboratory took 2 (P10E62262 and P10E62263 on first and second floors).
  3. Solar Urbana-Champaign

    From: Marta Monti <marta@midwestrenew.org>
    Sent: Tuesday, August 02, 2022 4:34 PM
    To: White, Morgan <mbwhite at illinois.edu>
    Subject: Solar Urbana-Champaign is back!

     

    Alternate text

     

     

    Solar Urbana Champaign is back for 2022

    c50d3f4342709f9b5f137ad8_320xauto.None

    2022 marks the seventh year for the Solar Urbana Champaign program. Since 2016, this non-profit-led program has educated 1,292 people about their solar opportunities with our Solar Power Hours presentations, and of those folks, 242 properties decided to go solar.

     

    In partnership with our competitively-selected installer, GRNE Solar, and with support from the Citizens Utility Board (CUB), the City of Urbana, and our growing partners, we're excited to help central Illinois residents go solar and save on their energy costs!   

     

     

    Find us online:

     

     

     

    4f14f0209c7f8572452841cb_160xauto.png

    First Benchmark Reached!

     

    Our group buy program uses the power of bulk purchasing to create an economy of scale: the more people who participate, the larger the savings become! This year's program has already passed the first 50 kilowatt benchmark, meaning that participants can look forward to additional savings. Join today and share with friends so we can achieve lower costs for everyone!

     

    Please help spread the word:

     

    Please share the program website or this email with your friends and neighbors or post it on your social media pages.

     

    Remember: the more people that go solar through the Solar Urbana Champaign program, the lower the cost for all!

     

     

    160dd54c09e26cbe021c4fe2_213xauto.png

    2c63303d55c89bd66ecd58a3_213xauto.jpeg

    Pull out your yard sign, it's Grow Solar season!

     

    Not sure where it went? No worries, it's been a while. Let us know where to drop it off and we will get you a new one. 

     

     

    - UPCOMING SOLAR POWER HOURS -

    Share this schedule with a friend and invite them to start their solar journey with you!

     

    8/11, Thursday: Solar Power Hour, 6:00-7:00 p.m. at Papa Del’s Pizza Factory, 1201 S Neil St, Champaign, IL

    8/17, Wednesday: Solar Power Hour, 6:00-7:00 p.m. at Danville Public Library, 319 N Vermilion St, Danville, IL

    8/26, Friday: Solar Power Hour, 6:00-7:00 p.m. at Big Thorn Farm & Brewery, 14274 600 North Rd, Georgetown, IL – co-hosted by Big Thorn Farm & Brewery

    8/31, Wednesday: Solar Power Hour, 11:00 a.m. – 12:00 p.m. on Zoom (click to register)

     

    — BROUGHT TO YOU BY —

     

    69327d52d70af4fe0b80e645_635xauto.png

     

    Questions?

    Throughout the program, if you have any questions, comments, or concerns, please let me know. I can be reached at marta@midwestrenew.org.

    Sincerely,

    Marta Monti

    MREA Solar Program Manager

    Midwest Renewable Energy Assn (MREA) 

    8b2bf50446f9f69d971f35a9_213xauto.png

    d6ff1ea998d0d6a424866d5e_160xauto.png

    The Midwest Renewable Energy Association (MREA) promotes renewable energy, energy efficiency, and sustainable living through education and demonstration. To learn more about our work, visit midwestrenew.org

     

    uy60wam

  4. update on indoor bin count

    Associated Project(s): 

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal. ~Sydney Trimble

  5. Master List of All Buildings With the 3-Bin Containers Updated

    Associated Project(s): 

    The master list for indoor 3-bin containers has been updated. This list includes all 3-bin station deployments, with information regarding the building, floor, and P-Tag associated with each individual bin. If applicable, additional information regarding their location is provided as well.

    See the attached file to review the updated master list for the 3-bin containers.

  6. iCAP Indoor Bins Metric Update

    Associated Project(s): 

    Hi Morgan!

     

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal.

     

    In the future, I think the iCAP team should consider changing the metric from number of buildings to number of deployed bins because not all campus buildings would be applicable for these bins. Especially if the buildings are offices, residential, or extension related. Orchard Downs and

     

    I also went ahead and updated the bin location master list that came with the project so your team can upload it. It was outdated and I have upgraded the layout of the list so it is easier to find information.

     

    Best regards,

     

    Syd Trimble

    F&S Waste Management Intern

    fandssydneyt2@mx.uillinois.edu | Skype: (217) 333-1128

    Garage & Carpool, Office D-3

    In Office primarily Monday, Tuesday, Thursday afternoons

    University of Illinois Urbana-Champaign

    Environmental Sciences - 2022

     

     

  7. Glass recycling finds funding on campus

    Glass recycling finds funding on campus

    Recycling+and+trash+bins+lie+near+the+west+courtyard+of+the+Union+on+Wednesday.+The+University+offers+more+than+3%2C000+recycling+bins+around+campus+including+glass+deposits.%0A

    MARK CAPAPAS

    Recycling and trash bins lie near the west courtyard of the Union on Wednesday. The University offers more than 3,000 recycling bins around campus including glass deposits.

    BY LUIS VELAZQUEZ, STAFF WRITER
    OCTOBER 10, 2019

    A glass recycling bin located in the Illini Union Courtyard surprised associate director of Facilities and Services for Sustainability Morgan White because she thought the University does not partake in recycling glass. Although many bins around campus only have places for plastic, paper, cardboard and scrap metal to be recycled, the University Housing Dining Services still funds glass recycling.

    More than 3,000 recycling bins are available throughout campus in dorms, as well as public facilities where plastic bottles, paper, cardboard and scrap metal can be recycled. 

    “A few times in the past 30 years, we have reviewed the materials that go through the F&S Waste Transfer Station, and we found that there is a very small amount of glass,” White said in an email. “Recently, Waste Characterization Studies were done for (eight) buildings on campus, measuring the exact amount of waste materials produced by each of those buildings.”

    According to White, Dave Guth, interim senior associate director of operations at the Illini Union, said, “This is probably one of the last remaining fiberglass bins we have in the building. The old containers had a separate stream for glass bottles and aluminum cans/plastic bottles.”

    White said although small amounts of glass come from campus buildings, the University Housing’s Dining Services have chosen to fund glass recycling.

    According to the Waste Management and Recycling website, “The University ‘diverts about 30% of its waste from landfills.’”

    With help from the F+S Waste Management Department, the University is aiming to reach its goal of reducing the total amount of waste sent to landfills. The University’s objective is to obtain a Zero Waste Campus environment, as indicated in the Illinois Climate Action Plan.

    The Waste Transfer Station, a facility for recycling goods, operates daily compacting and shipping trash to a landfill. However, the recyclables that come from campus are manually sorted and deposited into storage bins. After being compressed in a different bin, they are sold to recycling companies.

    Nichole Millage, environmental sustainability specialist for the City of Champaign Public Works Department, said the city offers glass recycling, but does not actually collect or process trash. This job is done by other companies, such as private solid waste haulers.

    “The City manages a multifamily recycling program (Feed the Thing), but the pick-up services are contracted to a private hauler (Midwest Fiber Recycling in Urbana),” Millage said in an email. “Per City Code, all licensed residential solid waste haulers in the City of Champaign are required to accept glass for recycling from residents.”

    Lesly Ortega, sophomore in LAS, said she believes since the University does not tell students to recycle, the majority do not properly recycle trash. However, Ortega is glad the University offers this option in general.

    “I feel like glass is used a lot more now,” Ortega said. “A lot of the refreshments sold in vending machines or in stores are accompanied with glass, so instead of it being thrown away, it should be recycled.”

  8. Collection Containers to Increase Recycling Efforts

    As part of the University of Illinois at Urbana-Champaign’s effort to improve sustainability, new recycling and landfill collection containers have been distributed to buildings on the Urbana campus. Eventually, more than 20 buildings will have the containers, which feature three top openings with easily-identifiable and color-coded labels for either “landfill,” “paper,” or “bottles & cans.”

     

    Collection Containers to Increase Recycling Efforts

     

    Pete Varney . Facilities & Services

  9. New Collection Containers to Help Increase Recycling Efforts

    Associated Project(s): 

    Click here to see this online

    As part of Illinois’ effort to improve sustainability, new recycling and landfill collection containers have been distributed to buildings on the Urbana campus.

    This first set of containers can be found in Gregory Hall, Lincoln Hall, English Building, Henry Administration Building, Wohlers Hall, and the Physical Plant Service Building. By fall 2019, 113 containers will be deployed across campus, primarily in first-floor hallways to divert recycled products away from the landfill.

    The containers feature three top openings with easily identifiable and color-coded labels for either “landfill,” “paper,” or “bottles & cans.” The acquisition and distribution of the new collection containers was coordinated from the office of the Illinois Sustainable Technology Center, the F&S Waste Transfer Station, and by Pete Varney, associate director of Operations, Maintenance & Alterations, Transportation & Automotive Services.

    “We are striving to add consistency to receptacles across campus,” said Varney. “We’ll continue to increase the number of containers over time, but we want to get a big impact out there now. We want to start someplace where they will be seen, they will be noticed, and they will have an impact.”

    The containers will help continue to raise awareness about the importance of recycling on campus, according to Shawn Patterson, transportation manager.

    “What we see is, ‘Just throw it in the trash can and [F&S] will recycle it,’ and that is something that sets a bad example for us, for the students, and for everybody especially going forward. We need everyone’s help to make sure we are recycling the right things, and these containers will make it easier for students, faculty, and staff members to help us accomplish the university goal of an increased recycling rate.”

    The Waste Transfer Station diverted 26.2 percent to recycling in FY2019, with a goal set by the Illinois Climate Action Plan (iCAP) of 30 percent by 2020 and 35 percent by 2025.

    For more information about the program, contact Associate Director of Operations, Maintenance & Alterations, Transportation & Automotive Services, Pete Varney pvarney@illinois.edu, 217-333-7583.

  10. SSC funds Recycling Pods

    The Illini Union has purchased 6 outdoor recycling units and 7 indoor units to address the growing need for recycling centers in and around the Union. This project will add an additional 10 recycling bins to the current initiative. In doing so, recycling efforts will increase around the Union, iCAP objectives will be implemented, recycling will be promoted across campus, strides towards waste reduction will be made – among just some of the positive impacts.

  11. Update from Ben McCall

    Dear Transportation SWATeam,  [Sorry for the barrage of emails...this is the last one for this morning!]

    I met with Michelle Wahl from Parking late last week, and she had some very useful comments on the iCAP draft that I thought I should share with you:

    1) She mentioned that in years past, she used to receive "idling reports" on her vehicles, which must have been equipped with some sort of system that tracked when the vehicles were idling.  This raised the question of whether such technology could be deployed widely on our fleet, rather than focusing only on "class 6 and above trucks" (neither of us knew exactly what that means).

    2) She was concerned about the financial aspects of providing additional opportunities for people to purchase less than full-time parking privileges in lots with wait lists...this is probably something that deserves further discussion.  If Parking allows someone to drop their full-time parking pass for a particular lot and instead purchase less than full-time for the same spot, their revenue will decrease.  This is concerning because Parking is legally required to be self-supporting -- they cannot receive any subsidy from campus, nor can they make a profit.

    3) She recommended adding a recommendation that parking rates be increased to provide a dis-incentive for single-occupancy vehicle use. 

    This would also be essential if the number of parking permits sold were to decrease, as Parking's costs are essentially fixed. Raising rates would be a challenge because they are subject to collective bargaining, but it has been successfully done on other campuses (including UIC). 

    Having an explicit call for this in the iCAP might help provide ammunition for such efforts.

    4) She recommended some investigation of the subsidy that Parking currently provides to MTD.  At present, Parking pays over $500K per year for this, ostensibly to support the buses that run to the "shuttle lot" (E-14, I think).  But this amount greatly exceeds the total revenue that Parking receives from selling permits in the shuttle lot.  She thought it was worth making sure that the amount Parking is contributing towards the MTD is the appropriate amount, because any funds that could be "saved" there could be directed towards other sustainability-related initiatives within Parking.

    5) She pointed out that there are now 18 "Level 1" charging stations for electric vehicles on campus, and Parking has plans to install some "Level 2" charging stations in 2015.  She thought it might be worth showcasing this work on page 29 of the current draft, and I am inclined to agree.

    Cheers,

    Ben

  12. Videos

    Associated Project(s): 

    We are pleased to provide the two animated files discussed at yesterday’s final presentation of the N. Campus Parking Deck Solar Array Conceptualization:

    • Hanno Weber’s ramp-up animation
    • Time lapse showing the construction of a parking garage solar installation

    Please click the following link to access these two items, and feel free to forward the link to colleagues who would be interested but were not at Thursday’s meeting.     https://pepractice.box.com/s/suegtnts53iasbhvvohp

  13. update from Joyce Mast

    Associated Project(s): 

    From: Mast, Joyce C
    Sent: Wednesday, June 26, 2013 9:32 AM
    To: Beverage, McKenzie; Johnston, Morgan B
    Subject: RE: ECE Solar Installation Status Update

    McKenzie,

    Thank you for checking with me about the status of the Solar Installation on the North Parking Garage. I expect that no funds will be spent on the SSC account before the end of the fiscal year. We need results from the feasibility study for placing the panels on the North Parking Garage roof before we will be spending money on the panels or installation.  The study is to be officially completed by September 6, 2013, but we expect to  have drawings and plans by July. This will give us enough information to seek more matching funds so that the panels may be installed in time for the July 2014 completion date for the new building.  

    Best regards,

    Joyce Mast

  14. comparison of porous ashpalt and conventional concrete

    Associated Project(s): 

    From: Skaggs, Thomas R
    Sent: Wednesday, October 24, 2012 10:58 AM
    Subject: RE: Parking lots

    Parking Lot Construction Comparisons

      Between September 2011 and August 2012 the Parking Department undertook 2 surface lot construction projects.  Each of the two projects were different by nature but a comparison of the projects demonstrates the following results:

    Lot C-9 (Bid Project)

    Parking lot C-8 was a project to create a parking area between existing lot C-8 and lot C-9.

    • Permeable asphalt lot built on rock base.
    • Project initiated March 2010, Completed January 2012
    • 2 new lights
    • No planting islands
    • No demolition of existing parking lot
    • 1 connecting walk
    • No curbs
    • Paint stripes
    • Sewer line

     

    70 spaces

    Duration of project 22 Months

    Surface life expectancy 20 years

    Total Final Cost $483,413

    Cost per space $6,906

     

    Lot E-15 West (Design and Build In House by F&S)

     

    • Concrete surface
    • Project initiated May 2012, Completed August 2012
    • Large areas of demolition, removals including curbs, planting islands and old pavement
    • Rebuild rock base
    • Re-wire/new underground service for lights.
    • 2 large concrete planting islands
    • Replacement and expansion of concrete connecting walks
    • Replace large central drive with new concrete drive
    • Remove and rebuild concrete east entrance
    • Paint stripe
    • 4 sewers rebuilt
    • Landscaping in planters and around perimeter

    150 spaces

    Duration of project 4 months

    Surface life expectancy 50+ years

    Total Final Cost $198,720

    Cost per space $1,325

     

  15. meeting updates

    Associated Project(s): 

    Yesterday’s meeting covered more refined and detailed breakdown of the following topics, most of which were discussed in prior meetings, with the exception of the newly introduced structural support “Space Frame” option.

    • Panel layout configurations for truss mounted structural frame- 4 sections of seven rows at approx. 100 modules/row or four sections of six rows also 100 modules each. Truss mounting providing specific spacing for mounting dimensions. Also mentioned types of Truss material recommending tubular over welded angle, siting weatherization, degradation, appearance and animal habitat prevention as main reasons.
    • Space Frame structure was introduced as a favorable option.
    • A space frame is a structure system assembled of linear elements so arranged that forces are transferred in a three-dimensional manner. In some cases, the constituent element may be two dimensional.
    • Macroscopically a space frame often takes the form of a flat or curved surface.
    • It should be noted that virtually the same structure defined as space frame here is referred to as latticed structures in a state-of-the-art report prepared by the Task Committee on Latticed Structures [2], which states
    • A latticed structure is a structure system in the form of a network of elements (as opposed to a continuous surface). Rolled, extruded or fabricated sections comprise the member elements.
    • Another characteristic of latticed structural system is that their load-carrying mechanism is three dimensional in nature.
    • Space frame benefits although more costly up front were presented as prefabricated, galvanized and powder coated, sturdy, longer Life cycle and less maintenance, but requiring cranes and other installation costs. They also have installer requirements for mounting solar array as to maintain the integrity of the coating and protective surfaces. Provided flexible mounting spacing to help maximize power output and minimize shading.
    • Inverter layout revisited with schematic diagram presented illustrating component placement and wiring layouts.
    • An overall electrical schematic was presented identifying key component placing and overcurrent protection limits and needs, along with electrical room Layout.
    • Metering usage stated existing meters could be utilized with the addition of a revenue grade power production meter to monitor the array output.
    • Single line diagram was presented identifying current and project components, mentioning the output potential of 1400-1600 amps at 480 volts.
    • Introduced idea of rainwater harvesting for irrigation or toilet flushing usages.
    • Procurement procedures mentioned and moved as major topic for next meeting with concerns of turnkey type purchasing being the industry norm verses purchasing standard variety purchasing from multiple vendors in normal construction.
    • Next meeting PEP is having the structural Engineers present design considerations, and Mr. Jim Lev will have construction procurement representative attend.

Pages