Transit analysis
Associated Project(s):
In FY08, the UI funded a Transit Analysis for the University District by MAB. The study reviewed options for Bus Rapid Tramsit lines and methods for reducing bus traffic on Wright Street.
The parking was removed from Gregory Drive, and a continuous on-street bike lane was striped in both directions, in alignment with the CATS endorsement of complete streets. The old bike path near the sidewalk had striping removed.