- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):Attached Files:
Biomass Consultation Group
Associated Project(s):Dear Energy Enthusiasts,
Thanks to all who attended the first Institute for Sustainability, Energy, and Environment (iSEE) biomass meeting, we are off with a strong start. This week we we will have the second consultation group meeting to carry on discussion and orient goals toward improving sustainability on campus.
Dong Kook will present on the most recent publications from the research group of Praveen Kumar in the department of Civil and Environmental Engineering. His topic for discussion will be Threshold Dynamics in Soil Carbon Storage for Bioenergy Crops. Click (here) to become familiar with their group's work.
We are gathering all interested persons to discuss the possibilities for a large-scale biomass facility that could eventually replace Abbott Power Plant. All ideas are welcome. Please pass this invitation on to anyone you think might be interested.Meeting details:
Time: Tuesday, November 18 from 1:00pm-2:30pm
Location: iSEE Conference room #358
National Soybean Research Center (directions here)
1101 W. Peabody Drive
Urbana, IL 61801Thanks and have a great weekend.
Nathan Wells
October 30 meeting
Associated Project(s):iCAP Working Group Thursday, October 30, 2014 358 NSRC, 1:30 - 3:00 pm
- Discussion with Kent Reifsteck, Director of Utilities & Energy Services Division, regarding campus energy and the Wind PPA
- Unmet targets from 2010 iCAP
- Overview of iCAP Forum and SWAT Team Recommendations
- Discussion of timeline for completing 2015 iCAP
- Other business
Attached Files:Wind PPA Presentation 2014
Associated Project(s):Kent Reifsteck discussed the University's Wind Power Purchase Agreement (PPA) and future electricity projections for FY15.
Attached Files:iWG follow up letter
Associated Project(s):Dear Al,
Attached please find a reply from the iCAP Working Group regarding the wind PPA process.
By the way, thanks so much for your participation in iSEE's Roundtable this week...sorry we didn't get a chance to chat!
Cheers,
Ben
--
Professor Benjamin J. McCall
Associate Director for Campus Sustainability Institute for Sustainability, Energy, and Environment University of Illinois at Urbana-Champaign campus-sustainability@illinois.edu
Attached Files:Note on iCAP 2015 objective 3.1
Associated Project(s):Objective 3.1 is for the SWATeam to lead an exploration of options for 100% clean energy and submit recommendations. F&S staff workload is too high to handle the exploration of options, so F&S will provide data and provide comments. Ben McCall and Scott Willenbrock will develop a plan for how to achieve carbon neutrality. They will make a document with potential options, pros, cons, and costs.
Biomass info for other campuses
Associated Project(s):Hi Energy Generation SWATeam,
I was looking at my records, and I came across this old biomass reference presentation. I thought you may want to look into the current status of these projects.
Thanks,
Morgan
Attached Files:iWG agenda packet
Associated Project(s):Attached here are the agenda and other relevant materials for the September 25, 2014 meeting of the iCAP Working Group.
Renewable Energy Certificates (RECs) purchased for FY15
Associated Project(s):- PEI bought 20,000,000 kwh for FY15.
- They are MISO Wind RECs.
- Without Petascale, this represents 5.28% of projected electricity demand.
- Including Petascale, this represents 4.25% of projected electricity demand.
- A half year of the solar farm would bring this up to 5%.
- The REC cost was $ 1.25 / MWH for a total of $27,000.
F&S response to iWG assessment
Associated Project(s):This letter is in response to the Illinois Climate Action Plan (iCAP) Working Group (iWG) recommendation #EG001, which Facilities & Services (F&S) received on August 28. F&S agrees that the campus should investigate the feasibility of entering into a Wind Power Purchase Agreement (PPA) to increase the use of renewable energy for campus.
Regarding the EG001 general statements about campus energy use, data points, and assessments of anticipated financial impacts, F&S will need more time to compile a useful response. Regarding the three specific EG001 recommendations, I have consulted with Al Stratman, Kent Reifsteck, and Mike Larson to provide the responses below.
- Recommendation: “The campus should undertake a Power Purchase Agreement for wind energy. Based on currently available information, we recommend that the amount be at least 119 million kWh per year (25% of our total electrical usage), but we should aim to purchase as much as we possibly can, given any technical, financial, and contractual constraints.”
From this recommendation, we understand that the iWG recommends entering into a Wind PPA for at least 25% of the FY15 electrical demand. However, the campus cannot make an informed decision about whether or not to undertake a PPA until the financial impact is fully understood. A key component of the financial impact is the fully burdened cost of the purchased wind power, which will not be known until after the successful completion of the Request for Proposal (RFP) process. Therefore, F&S does support pursuing a PPA so the feasibility can be evaluated, but we do not support making a final decision to undertake a PPA until completely evaluating the financial implications.
- Recommendation: “The effort to secure a PPA should be pursued as quickly as possible. The campus should inform PEI that this is a top priority, and that the review of RFI submittals and the issuance of the RFP should be expedited by all necessary means.”
During this summer, F&S worked with PEI to define a schedule for issuing a Request for Information (RFI) and a subsequent Request for Proposals (RFP). This schedule shows a completion date of April 2015, so that the PPA could commence with delivery of power on July 1, 2015, at the start of FY16. We have informed PEI that this is a top priority, along with safety and reliability of the overall campus energy system.
- Recommendation: “The iCAP Working Group should be kept informed and advised during the process of pursuing the RFI, RFP, and PPA, and given the opportunity to provide recommendations before key decisions are made about the PPA, to ensure that technical and financial considerations are appropriately balanced with our campus sustainability objectives.”
F&S values the advice and input from sustainability advocates on campus. Therefore, we suggest developing a set of interim checkpoints for keeping the iWG informed as the process unfolds.
To meet our Climate Commitment and achieve carbon neutrality, there is a lot of work that needs to be done. I look forward to working with the iWG and the SWATeams as this recommendation is pursued.
Sincerely,
Morgan B. Johnston
Associate Director of Sustainability, F&S
Updated RFP schedule from PEI
Associated Project(s):I am providing an updated schedule for the RFP related to a wind-power PPA for UIUC. The change reflects a request by one vendor to extend the response period by one week. Because of that, we have made other slight modifications to target dates for some of the milestones, but the original completion date of April 30, 2015 is maintained.
If you have any question, please let me know. Dan Mortland
Attached Files:revised schedule
Associated Project(s):Morgan,
I understand the deadline for submitting the RFI was extended until September 5 based on the requests from some vendors for more time to prepare their responses.
UA / PEI will be forwarding more info and will be looking to keep the overall schedule from being extended.
Thanks
Kent
iWG Assessment of Wind PPA recommendation
Associated Project(s):Attached please find the first formal recommendation from the iCAP Working Group (iWG) on the Wind Power Purchase Agreement.
Attached Files:August 2014 minutes
Associated Project(s):See attached minutes from the iCAP Working Group.
Attached Files:RFI schedule from PEI
Associated Project(s):Prairieland Energy Inc (PEI) provided the attached schedule for the Request for Information (RFI) and the potential Request for Proposals (RFP) for a Power Purchase Agreement (PPA).
Attached Files:First meeting of the iCAP Working Group (iWG)
Associated Project(s):On July 29, the iCAP Working Group (iWG) met for the first time. Read more about that first meeting in the attached minutes.
Attached Files:resource about using wood for energy
Associated Project(s):There are some environmental advocates who oppose using wood chips for energy.
This YouTube video includes the following description: "Forests are also one of our best defenses against global warming, absorbing vast amounts of carbon pollution out of the air. But power companies are increasingly proposing to burn whole trees for energy. Trees are not a "carbon neutral" fuel source. Just like coal, when trees are burned in power plants, the carbon they have accumulated over long periods of time is released into the atmosphere. Unlike coal, however, trees will continue to absorb carbon if left alone. So burning forests for energy not only emits a lot of carbon, but also degrades our carbon sinks. This video shows what happens to the balance of carbon between and forest and the atmosphere when we burn forests to produce energy instead of leaving them standing to continue to absorb and store carbon. Burning forests for electricity is dirty and destructive!"
It is shared by the Natural Resources Defence Council.
Joyce Mast coordinating RFP for the rooftop solar installation
Associated Project(s):Joyce Mast is coordinating a Request for Purchase to buy and install the solar panels that will go on top of the ECE Building. The building already has the structural supports for the panels, so the purchase will include the racks, PV panels, and inverters. Joyce is working with ECE's administrative office, the Purchasing Department, and F&S Capital Programs to facilitate this RFP.
DCEO grant brings building closer to net-zero goal
Associated Project(s):The Illinois Department of Commerce and Economic Opportunity (DCEO) has awarded a grant of about $250,000 to the Electrical and Computer Engineering Building Solar Panels Project.
The DCEO grant brings the project’s funding to its goal of $900,000. “This award gives us the final piece that will let us do the solar panels on the building itself,” said Professor Philip Krein, chairman of the ECE Building Committee. ECE ILLINOIS is still seeking funding for the large photovoltaic array that will be placed on the nearby parking structure.
That array’s power generation, added to power generation from the panels on the building and energy savings from the building’s energy-efficient design, will bring the building’s net-zero energy goal in reach. You can donate a solar panel through the Buy a Bit building wish list.
- The Illinois Department of Commerce and Economic Opportunity (DCEO) has awarded a grant of about $250,000 for the Electrical and Computer Engineering Building photovoltaic array.
- The project for the panels on the ECE Building is now fully funded. Funding is still being sought for the large array on the nearby parking garage that will bring the building's net-zero energy goal in reach.
- The photovoltaic array on the ECE Building will be installed this fall.
- See the full ECE article for more information.
Allerton Park Solar Array-Phase II
Associated Project(s):Allerton Park already has a solar array located near its Visitors’ Center. The second phase of the Allerton Park Solar Array project involves working with a Learning In Community (LINC) class to construct a second ground-mounted solar recharge array. This second phase builds on the success of the existing array with the adjacent construction of an additional 60 panels. The design of the Phase 2 array utilizes an innovative floating foundation system that allows for portability of the array if necessary. The total array provides 14.7kW of peak power, which translates to a projected annual output of 14,653 kWh(about 15-20% of total apCAP solar goals). Power at the panel and array level can be monitored remotely and be publicly viewable via an online dashboard which displays the impact of the solar power contribution in terms of energy equivalents: gallons of gasoline, light bills, tons of coal, barrels of crude oil, and planted trees.
Attached Files:
Allerton Park Solar Array-Phase II signed letter.pdf
Allerton Park Solar Array-Phase II.docx
Allerton Park Solar Array-Phase II unsigned letter.docx
IMG_0757.jpg
IMG_0758.jpg
IMG_0759.jpg
IMG_20131217_0001[2][1].pdf
Letter of Support to SSC for Allerton Phase 2 Solar Array[2][1].docx
SSCAPPLICATIONSTEP_DEP.xlsx