  1. ECIP next steps

    Hi Paul,

     

    Should we set up a calendar time to talk via Teams about the ECIP plans?  I’d think it would include Jen Fraterrigo, and maybe Rob?

     

    Thanks,

    Morgan

    ----------------------

    Hi Morgan,

    During Monday’s meeting we chose to follow your advice and go with the fall schedule.

     

    We are again having conference schedule during this week and wonder if the sustainability week can be chosen on a week other than the week of Oct 16th – the 20th?

     

    Best

    Paul

    --------------------

    Hi Paul,

     

    I think the date of the Campus Sustainability Celebration can move, as long as it is within October. I'll touch base with Jen about it and confirm. 

     

    Thanks,

    Morgan 

    -------------------

    Good morning,

     

    I am fine with moving the Campus Sustainability Celebration to another week in October.

     

    Thanks,

    Jen

  2. ECIP awards for 2022

    Hello Jen and Morgan,

    I have attached a draft of the award letter to be sent to the deans and dept heads, and am reaching out to iSEE in regards to supporting this program.

     

    I believe in the past ISEE co-presented these awards with F&S and more recently the awards were presented at the Sustainability Celebration which works well to promote more exposure for all sustainability items on campus.

    Unfortunately, the BTAF Mechanical Engineering conference and I2SL conferences are during the same week so we were not available to join this past year.

     

    We are now looking at 5 separate presentations at each location to present this years awards and wondering what support or involvement ISEE would be interested in?

     

    Thank you 

    Paul Foote

    ----------------------------

    Hi Paul,

     

    Jen and I spoke about this, and iSEE is interested in continuing to participate in the presentation of the ECIP awards.  We would like to suggest that this be a single award presentation, rather than the five separate events.  It can occur during Earth Month, and perhaps it could be held at the ACES Library, which is a nice venue and it was the ECIP winner with the highest energy savings.

     

    Please let us know if this is an acceptable plan, and we can arrange a call to talk about the details.

     

    Also, I asked Ehab about the Henry Admin Building leadership, and he suggests Paul Ellinger be the point of contact for the award letter.

     

    Thanks,

    Morgan

    --------------------------

    Hello Everyone,

    This is a terrific plan, Rob gave the go-ahead to plan the venue, date & time etc.

     

    When works best for all?

     

    Thank you

    Paul

    ----------------------

    Hello All,

    I am bumping this to the top of the email list for scheduling the venue and timing for this event.

    Let me know when we can discuss/finalize the details?

     

    Best

    Paul Foote

    ----------------------

    Hi Paul,

     

    Is there anything that you were anticipating including in this event agenda, other than the ECIP announcements and plaque distribution?  If not, it might be better to include both years’ winners in the fall 2023 campus sustainability celebration. 

     

    I realize this is a shift from what we were thinking of, but it would be a shame to put together an event that is only 15 minutes long…  It would also be difficult to get a broad audience.

     

    Thanks,

    Morgan

    -----------------------

    Hi Morgan,

    We were thinking this timeframe might fit better than the fall venue with multiple conferences etc…

    Pending the date, we should have information regarding the next round of funding and were planning to gather the facilities managers at this event to share examples and promote future project applications.

     

    Thoughts everyone?

    Best

    Paul

    ------------------

    Hi Morgan and all,

    I crossed the revolving loan fund and ECIP, the ECIP awards can be discussed at our next monthly meeting.

     

    Thank you

    Paul Foote

    -------------------

     

    Hi Paul, What monthly meeting?

    thanks, Morgan

    ------------------------

    Hi Morgan,

    UES has a monthly meeting for ECIP, RLF, rapid back and other funding items as needed.

     

    Best

    Paul

     

  3. Advantages of hot water versus steam within buildings

    Below is an email exchange between Jim Sims and Tom Keller:

    Mike or Tom,

     

    The EMT is discussing the advantages of converting building heating systems from steam to hot water with steam distribution. Would one of you be able to clarify this benefit?

     

    Thanks,

     

    Jim

    ---------------------------

    Jim,

     

    Hot water is more efficient than steam because it is easier to control. This also adds comfort to the occupants. Steam can be easier to leak and it is hotter, so there are some small safety concerns. Steam tends to be a bit noisier than hot water. Hot water can be easier to maintain than steam.

     

    There are quite a few other reasons. This is why hot water heating systems have become the industry standard.

     

    Thanks,

     

    Tom

    -----------------------------

     

    EMT,

     

    I asked Tom Keller and Mike Halm to provide some feedback regarding the advantages of hot water versus steam within buildings. Please see Tom Keller’s response below for our information. Please let me know if we would like for Tom would like to further explain “quite a few other reasons” or his primary benefits listed below.

     

    Thanks,

     

    Jim

  4. 28 bin order arrived

    Associated Project(s): 

    On Friday, February 17, the bin order from MAX-R arrived at the Waste Transfer Station. 20 26-gallon bins (standard size) and 8 18-gallon (slim) bins arrived.

  5. Undergraduate Library rehomes 6 3-bins to other facilities on campus

    Associated Project(s): 

    The Undergraduate Library rehomed 6 3-bins at the onset of redevelopment:

    • Armory took 4 (P10E62260 second floor east side right out of the elevator, P10E62264 third floor southside center outside restroom, P10E62261 third floor northside center outside of restroom, P10E62265 in landing area in front of Room 232 under glassed bulletin board).
    • Mechanical Engineering Laboratory took 2 (P10E62262 and P10E62263 on first and second floors).
  6. Eco-Counter set installed and activated at Green and Goodwin

    A set of Eco-Counters were installed at the intersection of Green St and Goodwin Ave by Loomis Laboratory on Monday, May 9, 2022. This was a new set of counters with no groundbox, purchased in October 2021. This set of Eco-Counter was purchased using the SSC funding. These counters were activated on May 10, 2022, and they are now collecting and transmitting data. See attached the pictures of these counters.

  7. Eco-Counter set installed and activated at Armory and Sixth

    A set of Eco-Counters were installed at the intersection of Armory Ave and Sixth St on Tuesday, April 26, 2022. This is the last set of old counters that were purchased in 2019. These counters were activated on April 27, 2022, and they are now collecting and transmitting data. See attached to see the pictures of these counters.

  8. update on indoor bin count

    Associated Project(s): 

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal. ~Sydney Trimble

  9. Master List of All Buildings With the 3-Bin Containers Updated

    Associated Project(s): 

    The master list for indoor 3-bin containers has been updated. This list includes all 3-bin station deployments, with information regarding the building, floor, and P-Tag associated with each individual bin. If applicable, additional information regarding their location is provided as well.

    See the attached file to review the updated master list for the 3-bin containers.

  10. iCAP Indoor Bins Metric Update

    Associated Project(s): 

    Hi Morgan!

     

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal.

     

    In the future, I think the iCAP team should consider changing the metric from number of buildings to number of deployed bins because not all campus buildings would be applicable for these bins. Especially if the buildings are offices, residential, or extension related. Orchard Downs and

     

    I also went ahead and updated the bin location master list that came with the project so your team can upload it. It was outdated and I have upgraded the layout of the list so it is easier to find information.

     

    Best regards,

     

    Syd Trimble

    F&S Waste Management Intern

    fandssydneyt2@mx.uillinois.edu | Skype: (217) 333-1128

    Garage & Carpool, Office D-3

    In Office primarily Monday, Tuesday, Thursday afternoons

    University of Illinois Urbana-Champaign

    Environmental Sciences - 2022

     

     

  11. ECIP Award Winners

    On October 20, 2021, the 2021 Energy Conservation Incentive Program (ECIP) Award Winners were announced at the Campus Sustainability Celebration!

    UIUC is home to a total of 10 winners and honorable mentions, as listed below according to their categories:

    • Occupant Action Category
      • Ice Arena
      • Student Dining and Residential Programs
      • English Building
      • Campus Recreation Center East (CRCE)
    • Energy Advancement Category
      • Stock Pavilion
      • Forbes Natural History Building
      • Levis Faculty Center
      • Early Development Lab
    • Honorable Mentions
      • State Farm Center
      • Bielfeldt Athletic Administrative Building

    See the attached file to read the official announcement of 2021 ECIP Winners, including the locations' % improvements and monetary savings.

    Attached Files: 
  12. 2021 Campus Sustainability Celebration!

    All are invited to the 2021 Campus Sustainability Celebration and appreciation event! Meet and network with your peer sustainability advocates and hear about exciting campus sustainability progress! Since the event is in person, please be prepared to wear a mask and show your Safer Illinois app or equivalent status. If you can't make it in person, watch the livestream on YouTube! >>>

    October 20, 1–4 pm • National Center for Supercomputing Applications lobby, 1205 W. Clark St., Urbana

    Julie Wurth • Institute for Sustainability, Energy, and Environment

    2021 Campus Sustainability Celebration!

  13. Archived description: MCORE porject

    The Champaign-Urbana Mass Transit District (MTD), City of Champaign, City of Urbana, and the University of Illinois at Urbana-Champaign are partnering to improve mobility in our communities core through a federal Transportation Investment Generating Economic Recovery (TIGER) grant. The $35M MCORE Project is unprecedented in our community’s history and will have a transformative impact.

    MCORE Project construction is anticipated to start in September of 2016 and continue into 2019, covering five separate project areas to improve key urban transportation corridors.

    Enhances Mobility Choices


    The goal of MCORE is to provide a balance between all modes of transportation. Transportation choices address pedestrian access routes, bicycle lanes, transit efficiency and vehicle flow; and reduce potential conflict areas.

    Improves Infrastructure


    MCORE will improve the condition of the existing pavement and bring the streets of these core transit corridors into a state of good repair while redesigning them into complete streets to accommodate all users.

    Promotes Sustainability


    MCORE will encourage sustainable development that is located and designed to be compact and contiguous to existing development and have limited environmental impact; provide streetscape improvements for an enriched built environment, sense of place, and quality of life; emphasize all modes of transportation while decreasing the use of single occupancy vehicles, thereby reducing congestion, traffic hazards, and carbon emissions.

    Improves Critical Linkages


    The completion of the MCORE Project will provide better connections between the downtown centers of Champaign and Urbana, the university, the area’s major employers, health, and social service organizations.

Pages