  1. bike parking review meeting

    Associated Project(s): 

    Stacey DeLorenzo, Amelia Neptune, Morgan Johnston, and Noel Grove met to review the bike parking estimates for this project.  There are a few locations where the pavement is in terrible condition, so we discussed options for handling those locations.  The racks could be installed on rails, or the pavement could be replaced.  There were also a few locations where there are conflicting major projects occuring in the near future.  Stacey will talk to the project managers for those sites to work through the solutions for the bike parking installation.

    Additionally, this project includes the installation of one bike fix-it station at Allen Hall.  Amelia began this work and Stacey will take it over now.  Stacey and Amelia will meet with Sean Sullivan in the SSC to provide him with an update.  Noel Grove will provide cost break downs with the pavement work separate from the bike rack installation work.  He will also contact the Iron Workers to discuss options for racks on rails built in-house.

  2. Bike fix-it station update

    Associated Project(s): 

    From: Neptune, Amelia
    Sent: Tuesday, May 14, 2013 12:27 PM
    To: Ortiz, Benita Vonne
    Cc: Johnston, Morgan B
    Subject: Bicycle Repair Station outside of Allen Hall

    Hi Vonne,

    As you may recall, earlier in the school year we had discussed that there is some funding for a new bicycle repair station near Allen Hall/CRCE. The original location we proposed near Gregory Drive in front of CRCE was rejected by the Architecture Review Committee, and they have proposed a better location near the bike parking area in front of Allen Hall. I would like to get your OK on this location before we move forward.

    The first attached PDF shows the location proposed by the Architecture Review Committee. As you’ll see in the photos on pages 2 and 3, it is on existing pavement, close to the bike parking, but not blocking a walkway, which I think is ideal.

    The second PDF shows the specifications of the newly designed repair stations so you know what it would look like. The new design is much smaller and (in my opinion) more attractive than the existing repair stations we have elsewhere on campus. The blue color of the existing stations is no longer available, so our plan is to match the color of the adjacent bike parking, in this case black.

    Please let me know if Housing has any objections to this location, or would like to meet there in person to discuss it further. Once I have your approval, we’ll move forward placing the order and installing this summer.  Please let me know if there are any questions.

    Thank you,

    Amelia  

    =========================================

    Amelia Neptune

    Campus Bicycle Coordinator

    University of Illinois at Urbana-Champaign

    1501 S. Oak, Champaign, IL 61820

    aneptune@illinois.edu

    217-300-1316

  3. Art and Design bike racks funded

    Associated Project(s): 

    To Davie Akins, Please proceed with the bike parking upgrade on the west side of Art and Design, per the previous discussions we have had.  The SSC funding will contribute $11,849.50 from CFOP: 1-629514-814006-xxxxxx-191200-814BIK. - from Morgan Johnston

  4. Cost estimates requested for first 5 locations

    Associated Project(s): 

    Transportation staff submitted work order requests to have cost estimates for time and materials for the first five locations to be upgraded from donut hole bike parking to U-rack bike parking.  The remaining nine locations need to have CAD drawings produced and apprroved before costs can be estimated.  

  5. Campus Bike Parking Overhaul Phase 1_Funding Award and Acceptance

  6. Main Library Steam Reduction Project Funding Award and Acceptance Letter

  7. Campus-wide Bike Parking Funding Agreement

    Bike parking is essential for supporting green commuters as well as raising awareness and supporting biking on campus. In 2009, the SSC funded $10,600 for standard bike parking at three popular locations on campus, Freer Hall, the Undergraduate Library, and the Agricultural Engineering Sciences Building. Later in 2012, SSC provided $225,000 in order to replace old donut-hole bike parking with U-loop parking at the Armory, the Main Library, the Foreign Language Building, and other high-traffic areas on campus.

  8. Roger Adams Laboratory (portion)

    Associated Project(s): 

    Sixty-four lighting fixtures in a portion of the Roger Adams Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 10,092 hours. The Simple Payback for changing the fixtures in the Roger Adams Laboratory is 2.01 years.

  9. Bevier Hall

    Associated Project(s): 

    A total of 1,982 lighting fixtures in Bevier Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 338,894 hours. The Simple Payback for changing the fixtures inBevier Hall is 1.26 years.

  10. Noyes Laboratory

    Associated Project(s): 

    A total of 1,574 lighting fixtures in the Noyes Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 276,264 hours. The Simple Payback for changing the fixtures in the Noyes Laboratory is 0.94 years.

  11. Davenport Hall

    Associated Project(s): 

    A total of 2,030 lighting fixtures in Davenport Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 363,141 hours. The Simple Payback for changing the fixtures in Davenport Hall is 1.36 years.

  12. Freer Hall

    Associated Project(s): 

    A total of 629 lighting fixtures in Freer Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 100,595 hours. The Simple Payback for changing the fixtures in Freer Hall is 2.49 years.

  13. Natural History Building

    Associated Project(s): 

    A total of 2,153 lighting fixtures in the Natural History Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 345,994 hours. The Simple Payback for changing the fixtures in the Natural History Building is 2.37 years.

  14. Main Library (6th Stack)

    Associated Project(s): 

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  15. Foreign Language Building

    Associated Project(s): 

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  16. Krannert Center for the Performing Arts

    Associated Project(s): 

    A total of 1,090 lighting fixtures in the Krannert Center for the Performing Arts were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 171,871 hours. The Simple Payback for changing the fixtures in the Krannert Center is 2.26  years.

  17. Bike Parking Funding Agreement

    The goal of this project is to fund installation of bicycle parking facilities at the Undergraduate Library, the Ag. Sciences Engineering Building and Freer Hall. Cycling is a sustainable form of transportation, highly used by the student body, and inadequately supported on campus. Thus the students sustainability committee is in favor of funding the full requested amount of $10,600.  

  18. Everitt Electrical Building

    Associated Project(s): 

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  19. Agriculture Engineering Sciences Building

    Associated Project(s): 

    A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.