You are here
All Project Updates
Search
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- Associated Project(s):
Bicycle Facilities and Programs Projects Continue
Associated Project(s):Student intern met with employees at Christopher Hall to make recommendations for new bike parking.
Submitted additional information about bike parking to the SSC, and were granted an award for $250,000 to revamp existing bike parking areas at various key locations throughout campus.
Campus Transportation Committee met and reviewed all bike related iCAP projects.
Bike sharing survey went live from the LINC course, as described above.
Staff met with employees at the Arboretum to make recommendations for new bike parking near the parking lot between the Idea Garden and the Japan House.
Staff met with Housing representatives to discuss a potential pilot trial of distributed bike parking enforcement. This would allow F&S to train and authorize certain key facility managers in proper procedures for impounding bikes parking improperly. Housing will draft a proposal in the next few months, then F&S will discuss the merits with appropriate campus representatives (such as Legal Counsel, the Parking Department, and Campus Planning) and determine how to proceed.
Sample Varsity Bike racks were provided for a one-year free trial to Champaign County Bikes. The Architecture Review Committee approved testing them at the east side of the Illini Union. The Union’s approval is pending an approval from SSC for the bike parking improvements at the southwest corner, with FY10 SSC funding.
Grant Modifications, Paperwork, Progress
Associated Project(s):Finished the grant modification docs for 09-466012 DCEO Large Customer ARRA grant.
Sent additional paperwork for the ICECF lighting retrofit grant to ICECF.
Received anticipation account CFOP for FY12 EEPs DCEO grant, and allocated funding to the Lighting Retrofit project.
Staff met with the SSC “F&S/SSC Process” subcommittee
Associated Project(s):Staff met with the SSC “F&S/SSC Process” subcommittee, and developed a workable plan for how to coordinate SSC projects with campus procedures. The process flowchart met all needs, and looks like a great solution for the future.
President Hogan contributes to Revolving Loan Fund
Associated Project(s):President Hogan agreed to contribute $750,000 to the Revolving Loan Fund.
Attached Files:Undergrads and Graduates work on Sustainability Projects
Associated Project(s):Working with James Scholar in Barbara Minsker’s engineering class to make recommendations related to sustainability for the Grainger crosswalk on Springfield.
Staff hosted interviews with about a dozen Rhet 105 students about various sustainability topics.
Urban Planning masters student Marcus Ricci is doing a GIS project about bike parking capacity in relationship to the buildings they serve.
The LINC U of I Bikes section sent out a bike sharing survey and had a great response rate, a summary will be available by the end of the spring semester.
Video in Voting Stage
Associated Project(s):The Climate Leadership Award video was completed and is now in the voting stage. At the end of March, we had about 650 votes.
iCAP Luncheon, Campus Bike Project Event
Associated Project(s):Stephanie presented an overview of the iCAP at the MSTE Friday luncheon, and shared the first release of the sustainability video for the Climate Leadership Award.
The Campus Bike Project celebrated its second anniversary with the survey’s Naturally Illinois event.
SCC Awards Funding for Solar Projects
Associated Project(s):The SSC awarded funding for Solar at the ECE North Campus Parking Deck project and the Conceptualization phase for Solar at KCPA.
Pre-proposal meeting and site visit for the Solar Farm
Associated Project(s):Held pre-proposal meeting and site visit for the Solar Farm RFP. Also, submitted the EcoCAT review request regarding that space. Responded to over 30 questions from potential proposers for the Solar Farm RFP.
Anaerobic Digester Study progress
Associated Project(s):Feasibility Study for an Anaerobic Digester at the Beef and Sheep facility on South Farms has funding approved and will move forward with A/E selection.
Survey for the Sustainable Endowments Institute completed
Associated Project(s):Completed the Revolving Loan Fund survey for the Sustainable Endowments Institute.
Monthly press on sustainability on campus
Associated Project(s):Engineering News Record is doing a story on the University of Illinois about green buildings/LEED certification.
Daily Illini article about campus sustainability progress.
Staff created flowcharts for sustainability themes, as preliminary step to filling in the content on the Sustainability Portal website. Staff provided field definitions and sample data for the database tables that will be available through the portal. Also, we met with staff from MSTE and drafted the page layouts for the website, which will be shared at the iCAP Forum in April.
Engagement with other schools, information sharing
Associated Project(s):We participated in meeting with representatives from Columbia, Missouri about their transit goals. Articles were written about the visit: http://www.columbiatribune.com/news/2012/mar/13/gold-standard/, http://www.columbiamissourian.com/stories/2012/03/13/final-bus-trip/, and http://wjf.im/xkmY5f.
We also provided information to Arizona State University about our bike registration system and intentions.
Urban Planning masters student completes capstone project
Associated Project(s):Urban Planning masters student, Marcus Ricci, will complete a capstone project about a methodology for prioritizing iCAP projects.
Proposal for steam reduction projects at the Main Library awarded funding
Associated Project(s):Submitted SSC proposal for steam reduction projects at the Main Library, and were awarded funding.
Recycling Assistant to assist and oversee
Associated Project(s):Tim Hoss was approved as a Recycling Assistant academic hourly position to oversee the implementation of the Food Waste Composting Facility and assist with other iCAP waste management projects.
Developing an online system for surplus furniture and equipment
Associated Project(s):Spoke with Jeff Weaver at Property Accounting about developing an online system where departments can post furniture and equipment they intend to relinquish, and other departments can choose to get that item directly from the current location, rather than send the item to Surplus and get it picked up from Surplus.
Natural Resources Building
Associated Project(s):As part of the Lighting Retrofit #5, 2,711 T-12 fixtures in the Natural Resources Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 424,466 hours. The simple payback for this project is 2.2 years.
Biogasification power plant talk
Associated Project(s):F&S met with representatives from the Center for Neighborhood Sustainability to continue discussion of potentially building a biogasification power plant off campus for production of biogas as an alternative fuel for power generation for campus.
