- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- Associated Project(s):Attached Files:
No Summer Coal Buring
Associated Project(s):Beginning April 12, 2011 Abbott Power Plant will no longer burn any coal during the summer, when natural gas is enough to meet the campus energy demands.
UIUC Campus Bike Plan Presentation 2011
Associated Project(s):Presentation on bike counts, along with proposed bike facilities, costs, and updates.
Attached Files:City of Champaign Council Goals for Sustainability Presentation 2011
Associated Project(s):Presentation discusses current sustainability projects and programs within Champaign, along with future opportunities.
Digital Computer Laboratory
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 2,793 T-12 fixtures in the Digital Computer Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 422,793 hours. The simple payback for this project is 0.23 years.
Matt Edmonson assigned as Capital Planner for study
Associated Project(s):Planning Division brought into discussion, so the project can get implemented. Matt Edmonson assigned as capital planner for the Food Waste Composting Feasibility Study.
Coordinated Sciences Laboratory
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,903 T-12 fixtures in the Coordinated Sciences Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 295,922 hours. The simple payback for this project is 0.78 years.
Energy presentation at CSL
Associated Project(s):Energy details on display at Coordinated Science Lab.
Illinois State Water Survey
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 1,154 T-12 fixtures in nine buildings belonging to the Illinois State Water Survey were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 181,017 hours. The simple payback for this project is -2.45 years.
James Hoffer, student intern, created building list file
Associated Project(s):James provided the attached list of buildings audited by student teams in FY11. Unfortunately, these audits were rushed and incomplete. There were many follow up discussions about paying the student teams as originally intended, and in the end the teams were not paid. This decision was coordinated by Mckenzie Beverage, the SSC Program Advisor, during FY12 and FY13.
Attached Files:Newmark Civil Engineering Laboratory
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 2,977 T-12 fixtures in the Newmark Civil Engineering Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 403,004 hours. The simple payback for this project is 1.17 years.
Conservation Plan
Associated Project(s):In March 2011, John Dempsey, then Executive Director of Facilities and Services, signed the conservation plan for the State Threatened Franklin's ground squirrel at the South Farms location (for wind turbine installation).
Attached Files:Site location (modified)
Associated Project(s):A modified version of the site location for the wind turbine was proposed.
Attached Files:Wind turbine: History and status
Associated Project(s):In March 2011, the university provided the history and the current status update regarding the wind turbine project at the South Farms location.
Attached Files:Computing Applications Building
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 621 T-12 fixtures in the Computing Applications Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 113,735 hours. The simple payback for this project is 0.74 years.
Energy presentation at Altgeld
Associated Project(s):Energy details on display at Altgeld.
Medical Sciences Building
Associated Project(s):As part of the ICECF 2009 Lighting Retrofit, 2,195 T-12 fixtures in the Medical Sciences Building were replaced with the more energy-effiecient T-8 fixtures. This switch will incur an Annual kWh Savings of 416,547 hours. The simple payback for this project is 11.68 years.
Kevin Wolz discusses composting with various F&S representatives
Associated Project(s):Series of emails from Kevin Wolz with various F&S staff. Tracy was involved in discussions with Kevin about the waste container and truck options. Ryan Welch was involved in discussions with Kevin about the possibilities of using the Grounds landscape compost site and equipment.
Energy presentation at IGB
Associated Project(s):Energy details on display at the Institute of Genomic Biology.
Site Selection Committee formed
Associated Project(s):A Site Selection committee was formed to evaluate potential locations for the Solar Farm.