The small 15 kW solar array at the Building Research Council will be decommissioned when that facility is razed in the coming year. The solar panels will be delivered to agrivoltaic researchers working with iSEE and Crop Sciences, at the Energy F
You are here
Ground Mounted Solar PVs BRC Research Test Bed (Completed)
Project History
-
1/25/2023
-
10/24/2019
Using the BRC solar energy dashboard at https://smart.tigoenergy.com/p/itisolartestbed/system/charts, we collected the monthly data for the solar array. Because only a por
Project Family
-
Solar Power on Campus
- ECE Rooftop Solar PVs
- Install Solar PVs on NCPD
- Solar Farm 1.0
- Rooftop Solar Potential
- BIF Rooftop Solar PVs
- Ground Mounted Solar PVs BRC Research Test Bed
- E37 Parking Lot Solar Lighting
- InSPIRE Solar Powered Outdoors Table (SPOT)
- KCPA Rooftop Solar Feasibility Study
- Solar Farm 2.0
- Solar PVs at Idea Garden
- Solar PVs on Fruit Farm Admin Building
- Solar PVs on I Hotel and Conference Center
- Solar PVs on President's Garden Shed
- Solar Panels on Everitt Lab
- Solar at Willard Airport
- Speech and Hearing Rooftop Solar PVs
- Uni High Gym Rooftop Solar PVs
- Wassaja Hall Rooftop Solar PVs
- SSC Solar Feasibility Study
Associated Collections
Solar Generation from BRC
Related Files
Project Location(s)
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.