Install Solar PVs on NCPD (Cancelled)

Description

The goal of the ECE (Electrical and Computer Engineering Building project is to achieve Platinum LEED standards and be net zero for outside energy consumption.  To meet that goal, engineers have proposed the use of solar panels atop the ECE building to offset the building’s energy consumption....View full description »

Background

The Parking Department hired KJWW in FY09 to do a photovoltaic array feasibility assessment, in conjunction with a lifecycle study for all parking garages done by Carl Walker.   It was determined that the North Campus Parking Deck is the best option for proceeding with solar on parking decks.

Conclusion

This project was cancelled in favor of partnering with the Solar Farm 2.0 leadership at F&S to contribute renewable energy in support of the Net Zero ECE Building goal.

No description has been provided yet.

Project Team

  • Project Leader:

    Phil Krein

    Team Members:

    • Joyce Mast
    • Morgan Johnston
    • Tim Newman
    • Greg Larson
    • Michelle Wahl
    • Tom Skaggs

Dates

  • Proposed October 10, 2011
    Proposed by Phil Krein