  1. Solar Installations - preliminary list

    Associated Project(s): 

    Facilities & Services created a list of existing and planned Solar installations on campus:

    a.       Installed:

    i.         #1206 BIF – Approx. 3,700-4,000 s.f. on a building roof.

    b.      Active:

    i.        Approx. 20”x20” panel for a fixed speed radar detector near lot E-15.

    ii.       Approx. 20”x20” panel to power lights for pedestrian crossing on Springfield Avenue.  Lights have been removed due to maintenance issues.  Panel remains.

    iii.      Approx. 20”x20” panel for a mobile speed radar detector on Lincoln Avenue.

    iv.      Approx. 20”x20” panel for an electric tractor/mower charger.  Item is off the grid.  Location?

    c.       In Planning:

    i.         #0052 KCPA

    ii.       #0409 Electrical and Computer Engineering along with #1094 NCPD

    iii.       South solar farm

    iv.       Housing

    v.        #0118 ARC - Solar Thermal

                    vi.       Residence Hall #3

                   vii.       College of Engineering discussing something at MNTL with grant funds. 

     

  2. Racquetball Court Energy Reduction Project

    Associated Project(s): 

    Twelve racquetball and three squash courts at the Activities and Recreation Center (ARC) were retrofit with 193 fluorescent and 96 mercury vapor light fixtures. The project was funded by the Student Sustainability Committee through an interest-free loan of $75,000.

    Once the lighting retrofits were completed, occupancy sensors were installed in all 15 courts.

    The overall cost of the project ended up at $61,203.69 -- $13,796.31 less than the original quote. Campus Recreation requested that the remaining balance stay with the division and be used to further fund energy reduction projects within their facilities.

    The total average reduction in power consumption is 129,226 kWh. This is a 75.7 percent decrease in consumption, which translates to an annual savings of $9,020. The simple payback for this project is 6.78 years.

  3. RLF Occupancy Sensors FY12

    Associated Project(s): 

    Ten buildings on the University of Illinois at Urbana-Champaign campus were selected to receive RLF funding for occupancy sensors in FY12. In order from top priority to lowest priority, the buildings that received funding are Gregory Hall, the Foreign Languages Building, the Agriculture Engineering Sciences Building, Newmark Laboratory, the Rehabilitation Education Center, the Education Building, the Law Building, the Water Survey Buildings, Noyes Laboratory, and Freer Hall. The University will now proceed to implementation of occupancy sensors in all of the above buildings.

    Gregory Hall, the Foreign Languages Building, Newmark Laboratory, the Rehabilitation Education Center, Noyes Laboratory, and Freer Hall have also been selected to receive HVAC occupancy sensors.

  4. Draft 2013 Campus Bike Plan Released for public comment

    Associated Project(s): 

    The draft 2013 Campus Bike Plan is now available for public input. The draft plan will be online during a four-week period, March 4-31, and all members of the campus community are encouraged to review the plan and submit their feedback to TDM.  Feedback can be submitted through the online Campus Bicycle Feedback Form through March 31, 2013. 

  5. Animal Sciences A/C Center

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 50 T-12 fixtures in the Animal Sciences A/C Center were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 7,884  hours. The simple payback for this project is 3.56 years.

  6. FARH Food Service

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 453 T-12 fixtures in FARH Residence Hall's Food Service Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 71,429  hours. The simple payback for this project is 2.81 years.

  7. FARH Oglesby Hall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 126 T-12 fixtures in FARH Oglesby Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 19,868  hours. The simple payback for this project is 2.81 years.

  8. FARH Trelease Hall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 110 T-12 fixtures in FARH Trelease Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 17,345  hours. The simple payback for this project is 2.81 years.

  9. Sherman Hall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 51 T-12 fixtures in Sherman Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 8,042  hours. The simple payback for this project is 2.81 years.

  10. ISR Food Service

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 381 T-12 fixtures in ISR Residence Hall Food Service Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 60,076  hours. The simple payback for this project is 2.81 years.

  11. ISR Lounge

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 176 T-12 fixtures in ISR Residence Hall Lounge were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 27,752  hours. The simple payback for this project is 2.81 years.

  12. ISR Townsend

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 791 T-12 fixtures in ISR Townsend Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 124,725  hours. The simple payback for this project is 2.81 years.

  13. ISR Wardall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 73 T-12 fixtures in ISR Wardall Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 11,511  hours. The simple payback for this project is 2.81 years.

  14. Student Staff Apartments

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 136 T-12 fixtures in the Student Staff Apartments were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 21,444  hours. The simple payback for this project is 2.81 years.

  15. Evans Hall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 500 T-12 fixtures in Evans Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 78,840  hours. The simple payback for this project is 2.81 years.

  16. Busey Hall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 391 T-12 fixtures in Busey Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 61,653 hours. The simple payback for this project is 2.81 years.

  17. Taft Hall

    Associated Project(s): 

    As part of the Housing Lighting Retrofit, 111 T-12 fixtures in Taft Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 17,502  hours. The simple payback for this project is 2.81 years.