  1. Illini Union Bookstore

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 153 T-12 fixtures in the Illini Union Bookstore were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 24,077 hours. The simple payback for this project is 3.65 years.

  2. Education Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,416 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 327,869 hours. The simple payback for this project is 1.12 years.

  3. Illinois Business Consulting report - economic analysis

    The central question posed to Illinois Business Consulting (IBC) is as follows: what would be the economic impact of replacing 10% of the university’s coal intake with wood chips?  After extensive research, analysis, and calculation it is the opinion of IBC that the cogeneration of energy with coal and wood chips is not economically feasible.  The initiative has been deemed not economically feasible because wood chips are more expensive on the basis of energy content, transportation costs will increase due to biomass, and infrastructure modification expenses necessary for the operational changes are significant.

  4. Illinois Business Consulting report - carbon impact

    In 2012, F&S hired Illinois Business Consulting to evaluate the following question for Abbott Power Plant: "Can the overall carbon footprint be decreased by using 10% of biomass in place of 10% of coal?"  The report and executive summary are attached here.

  5. Labor & Employment Relations

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 179 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 29,829 hours. The simple payback for this project is 3.48 years.

  6. Atmospheric Sciences Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 221 T-12 fixtures in the Atmospheric Sciences Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 34,365 hours. The simple payback for this project is 3.83 years.

  7. Meat Sciences Laboratory

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 367 T-12 fixtures in the Meat Sciences Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 66,103 hours. The simple payback for this project is 2.91 years.

  8. Admin Info Tech Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 687 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 112,316 hours. The simple payback for this project is 3.42 years.

  9. Art and Design Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 1,250 T-12 fixtures in the Art and Design Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 202,172 hours. The simple payback for this project is 3.47 years.

  10. payments to RSOs

    From: Hanson, Claudine
    Sent: Thursday, September 20, 2012 10:10 AM
    To: Johnston, Morgan B; Beverage, McKenzie
    Cc: Jones, John D
    Subject: RE: RSO Weatherization Payments

    Here you go.

    The full CFOAP for deposits into an RSO fund is  1-90xxxx-389005-307900-199000

    The fund numbers are as follows:

    Hong Kong Student Association     901645

    Chinese Undergraduate Student Association    902108

    Horticulture Club     901887

    Students for Environmental Concerns   901758

    American Society of Civil Engineers   901270

    Let me know if you have questions.

    Claudine

     

  11. Art East Annex- Studio 1

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 703 T-12 fixtures in the Art East Annex (Studio 1) were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 112,892 hours. The simple payback for this project is 3.47 years.

  12. Ceramics Building

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 531 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 96,045 hours. The simple payback for this project is 2.96 years.

  13. Geological Survey Laboratory

    Associated Project(s): 

    As part of the Lighting Retrofit #5, 225 T-12 fixtures in the Geological Survey Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 44,856 hours. The simple payback for this project is 2.59 years.