Projects Updates for Solar Power on Campus

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.

Pages

  1. suggestion for servicing solar arrays

    Associated Project(s): 

    Perhaps there should be a standard developed for solar on buildings with monitoring and connectivity requirements. trouble shooting issues could go to a service contract to handle or there could be a work order for the F&S electricians. We should certainly train the campus electricians on everything that needs to happen for maintaining solar systems, or get a standing service contract.

  2. Welcome Note for Earth Day Solar Open House

    Happy Earth Day, 2021!!! 

    Welcome to the UIUC Solar Sites Open House!

    • Nine campus solar power installations are available to visit at this virtual open house.
    • Contact people for each site are standing on the yellow stars by their facility, on Earth Day from 9-10:30 AM.
    • There are also links for further information about each solar site.

    Hints for Using Topia

  3. News-Gazette mailbag note about MEB solar

    Associated Project(s): 

    South facade at Lu building  "At the new Sidney Lu Mechanical Engineering Building at the northwest corner of Green and Goodwin, Urbana, the south façade has an intriguing glass — perhaps with embedded solar panels or something like that? What is the product, and what is it's purpose?"

    Your answer comes from engineer Damon McFall, director of facilities and operations in Mechanical Science & Enegineering.

  4. Andrew Li will be getting an update for the small scale solar projects

    Associated Project(s): 

    Andrew Li, Halie Collins, and Morgan White met today to launch a student-led project to get an update for all the small scale solar projects on campus.  Andrew will be reaching out to the project contacts over the next few months to get a status update and associated photos, links, etc. for each project.  He will then update the iCAP Portal accordingly.

  5. Sustainable Issues and Opportunities for Handling End-of-Life PV Modules

    According to the Solar Energy Industries Association, solar power is the fastest-growing energy source in the U.S. and this growth will continue to rise. At the moment, only a few states have adopted solar PV end-of-life handling policies. Thus, a lot of modules may end up in landfills. The panel discussion will be on barriers, policies, and sustainable opportunities for end-of-life PV modules.

  6. Mailbag solar article: Suggestion for UI solar panels

    "Why doesn't the company installing the solar panels at U of I put them over the parking lot? I would provide shade for the cars underneath and would eliminate having to kill whatever would be underneath them in the fields."

    The best option for building solar panels is ground-mounted, said Morgan White, the associate director for sustainability at the University of Illinois.

  7. Final project reports for Fall 2017

    The CEE 398 Project Based Learning and the Sustainability Minor's ENVS 492 Capstone students completed their nine fall 2017 reports.

    There were five projects completed for capstone partners:

    1. Energy Dashboards for Accenture
    2. Sustainable Development Goals (SDGs) for Johnson Controls
    3. Food Hub Study for The Land Connection
    4. Sensors and Green Buildings for CERL
    5. Biomass Life Cycle Cost Analysis (LCCA) for Chip Energy

    There were four other projects completed by CEE students:

  8. EGen SWATeam Meeting Minutes

    The Energy Generation, Purchasing, & Distribution SWATeam met for the first time of the FY2017 on September 21. They revised their focus topics for the year and reviewed progress on current projects, such as on the rooftop solars on the Electrical and Computer Engineering Building, the Speech and Hearing Building, and the Business and Instruction Facility. Finally, EGen also discussed the possibility of building a second solar farm in order to further meet iCap goals. 

  9. EGEN SWATeam Meeting (4.13.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Ximing Cai's [in attendance] vision for iSEE and SWATeams
    • Developing a recommendation to expand UIUC solar farm.
    • Developing a recommendation for another clean energy PPA
    • Cost savings for geothermal systems and opportunities for implementation at solar farm and new building sites
  10. EGEN SWATeam Meeting (3.30.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Performing preliminary assessment for clean energy PPA
    • Fact sheet using solar farm as basis to estimate land needs and costs of additional solar farm to meet iCAP goal
    • Update on biomass boiler at energy farm
    • Identifying opportunities to purseu implementation of ground source heat pump (GSHP) technology on campus.
  11. EGEN SWATeam Meeting (3.10.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Associate Director for Campus Sustainability Ximing Cai and his vision for iSEE
    • Biomass boiler at Energy Farm
    • Opportunities for Geothermal on campus