You are here

Projects Updates for place: Lincoln Hall

  1. Data Acquisition for Lincoln Hall

    Associated Project(s): 

    Last week, I gathered data for energy consumption in Lincoln Hall from the Energy Billing System (EBS). The total consumption was broken into three components -- electricity, chilled water, and steam. Excel spreadsheets and two graphs were created. One shows the annual consumption from 2008 until fiscal year 2016 (FY16) whereas the other shows monthly consumption of FY16.

     

    During the meeting with Ms. Morgan Johnston and Ms. Anna Barnes, we went through the spreadsheets and graphs. Units were modified to be BTU/SF, which is the Energy Use Intensity (EUI). We also discussed that instead of showing the monthly consumption during FY16, that of the most recent fiscal year, FY17, will be used. Data will be available in July. Furthermore, consumption for potable water will also be added in each building’s analysis.

     

    The next step is to develop the spreadsheets and graphs that show the annual consumption from FY08 until FY17 for the rest of the ten buildings. They will have the same unit and format as the files modified for Lincoln Hall.

     

  2. New Member on the Project Team!

    Associated Project(s): 

    My name is Chen Zhang, a rising senior studying Civil and Environmental Engineering. As a new member of the project, I am excited to join the team and make contributions! This past week, I obtained access to the Energy Billing System (EBS) and created my account at the iCAP Portal. I learned how to navigate both systems and find useful information for the project. Meanwhile, I read documentations and reports developed previously for this project.

     

    On May 25th, Ms. Morgan Johnston (associate director of Facilities and Services (F&S)), Ms. Ana Barnes (from F&S), and I had a meeting. Ten buildings (listed at the end) on campus were picked for the energy analysis between now and December 2017. Their locations and affiliations to different colleges were taken into account during the decision process to engage more students and faculties in future presentations. Meanwhile, we discussed important information that we will include in the energy report cards to raise awareness of energy conservation.

     

    The first building we will analyze is Lincoln Hall. The next step is to gather data for its energy consumptions, including electricity, chilled water, steam, and gas usage, from the EBS website. An excel spreadsheet and graphs will the be developed to show the trend of energy consumption from 2008 until now.

     

    Ten buildings:

    a. Lincoln Hall

    b.  Admin and Records

    c.  DRES – Rehabilitation Center

    d.  SDRP

    e.  National Soybean Research Center

    f. NCEL

    g. Illini Union

    h. Temple Hoyne Buell Hall

    i.   BIF

    j.   Morrill Hall

       

  3. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Status of our recommendations to iWG;

    2) Review of Illini Lights Out over the past year;

    3) Any final thoughts, recommendations for Eco-Olympics;

    4) Progress on building energy standards;

    5) Updates on the revolving loan fund (RLF) projects;

    6) Turning off computers.  Change in policy, at least at F&S.  Implications for Certified Green Office Program? 

    7) Building level energy consumption report summary;

    8) Good-byes and thanks to departing members.

  4. Building level energy consumption report

    The report is about behavior change messaging, which lets the occupants of each building see their consumption changes over time and it will motivate them to conserve energy. The goal of the report is to display “past-current-new” patterns of energy conservation change. The result will be a paper with recommendations how to motivate people to be more sustainable.

    The data for FY08-FY2016 was used.  The scope of the project are 175 buildings at the UIUC campus. Then the pilot project was about the Lincoln Hall. After Lincoln Hall, the work was started with the Soybean National Laboratory and the Illini Union.

     

  5. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Comments needed on Illini Lights Out (ILO) recommendation;

    2) Illini Lights Out final planning for 10th of March;

    3) Building level energy consumption report;

    4) Participation in Earth Hour and Earth week activities on campus;

    5) Updates on the Green Labs Coordinator;

    6) Planning for a campus walk focused on space utilization.

     

  6. Building Level Energy Consumption Report

    Associated Project(s): 

    1) We used total energy use by year in MMBTU (FY08-FY2016) and created a bar chart. Then we converted the MMBTU to BTU, and divided the number by GSF to get the energy use intensity (EUI). We used both bar charts and added them to the presentation for the Lincoln Hall.

    2) We made a research to find out what Notable Energy Events occured in the Lincoln Hall:

    • FY09 T-12 to T-8 Lighting Retrofit;
    • FY11-12 LEED Platinum Renovation;
    • FY14 Retrocommissioning;
    • FY15 ECIP winner;
    • FY16 Illini Lights Out pilot.

    3) iCAP Portal projects at Lincoln Hall: https://icap.sustainability.illinois.edu/place/lincoln-hall

     

  7. Discussion at Transportation Building about ECIP funds

    Morgan Johnston and Shawna Grady met to discuss the potential uses for the Transportation Building's ECIP funding award ($10,000).  Options included additional recycling bins, LED lamps, power strips, battery recycling containers, and potentially a waste characterization study for the building (if available through ISTC).

  8. KCPA ECIP funds to go towards several improvements

    Krannert Center has identified several projects to tackle with the ECIP award funding: 

    • Recycling Bins and Bags - $5,000 (make in-house recycling efforts more efficient and accessible)
    • TCP Switch for Playhouse - $6,000 (electrical safety issue)
    • Imop -  $5,000 (water conservation)
    • Food Services Dishwashers - $9,750 (energy efficiency, water conservation, chemical usage reduction)
    • Energy efficient washer and dryers (2 each) for Festival Green Room -  $2,250 (energy efficiency, water conservation)
    • Ipad mini’s & Ipad & Secure Mounts for Attendant Access to Calendar and Event Sheets - $2,500  (reduce printed paper)
    • Reconfigure Stairs to Playhouse Pit  - $3,500 (safety issue correction)

    The dollar amounts listed are approximations.  Any additional funds not used for these items would be allocated to expanding the stock of replacement LED bulbs.

  9. 2016 Winners Announced!

    The 2016 ECIP award winners were announced last Wednesday, and they will be given plaques at the annual Campus Sustainability Celebration this week, 10/16 from 4-6 at the Alice Campbell Alumni Center.  Here is the letter.

    Congratulations!

    We would like to recognize your unit as a 2016 Energy Conservation Incentive Program (ECIP) award winner during the Campus Sustainability Celebration on Wednesday, October 26 from 4-6 p.m. at the Alice Campbell Alumni Center. For planning purposes, please let us know who will be accepting the award(s) on behalf of your unit by Friday, October 21.

    Sustainability initiatives are at the core of Illinois’ commitment to its land-grant university mission. The Climate Leadership Commitment pledges the Urbana campus to be carbon neutral by 2050, which requires all students, staff, and employees working together to implement a dynamic, multi-disciplinary approach to campus sustainability.

    The ECIP awards began in 2013 as a way to recognize outstanding individual and team efforts that move us closer to reaching our Illinois Climate Action Plan (iCAP) goals. The ECIP honors occupants of campus buildings that have reduced energy at the greatest level from one year to the next. This year more than $177,000 for improvement projects in winning facilities will be provided through the program.

    Everyone researching, learning, and working in these nine buildings is an ECIP winner, and we encourage as many participants to join the celebration as possible.  Hosted by Facilities & Services and the Institute for Sustainability, Energy, and Environment, the Campus Sustainability Celebration will cover the iCAP objectives, celebrate the diverse sustainability community, and recognize 2016 winners. 

    We look forward to you and your employees joining us to celebrate the ECIP winners and their contributions toward campus energy conservation.

    2016 ECIP WINNERS

     Occupant Action Category

     % Improvement

    Incentive Award

    1. Atmospheric Sciences Building

    7.5%

                 $50,324

    2. Krannert Center for the Performing Arts

    4.8%

                   $34,111

    3. Institute of Government & Public Affairs Building

    4.4%

                   $15,083

    4. 1207 West Oregon Street (tie)

    2.9%

                   $10,048

    4. Temple Hoyne Buell Hall (tie)

    2.4%

                  $11,486

     Energy Advancement Category

     % Improvement

     Incentive Award

    1. Davenport Hall

    25.8%

                  $26,335

    2. Ceramics Kiln House

    21.2%

                  $10,000

    3. Transportation Building

    14.0%

                  $10,000

    4. Rehabilitation Education Center

    9.6%

                 $10,000

     

    Helen J. Coleman, LEED AP
    Interim Executive Director

    University of Illinois Urbana-Champaign
    Facilities & Services
    1501 South Oak St.
    Champaign, IL 61820
    Phone: (217) 265-8477
    E-mail: hjcolema@illinois.edu

     

  10. ECBS Objective 4 Subcommittee Meeting Minutes

    The ECBS Objective 4 Subcommittee met Tuesday, February 16 to continue fleshing out the ECBS SWATeam's fourth iCAP objective, which has to do with increasing campus engagement in sustainability.  Discussion continued on ECIP and potential changes for the upcoming year- a major issue is raising awareness of this program and others like it. By the conclusion of the meeting, the focus of the subcommittee shifted to creating and sending recommendations to the iCAP Working Group, such as a Green Labs Initiative proposal as well as continuing Eco-Olympics or initiating a similar program that would serve as dorm resident engagement.  The next meeting is scheduled for Tuesday, February 23.

  11. ECBS Objective 4 Subcommittee Meeting Minutes

    The ECBS Objective 4 Subcommittee held its first meeting on Tuesday, February 9.  Discussion revolved around the issue of tying all existing campus engagement programs (e.g., ECIP, Certified Green Office Program, revolving loan fund, etc.) together into one campus-wide brand.

    Attached Files: 
  12. FY15 ECIP award winners announced

    Occupant Action Category  % Improvement  Incentive Award
    1. Admissions and Records
        Building  
     39.2%  $61,778
    2. Agricultural Bioprocess
        Laboratory 
     25.2%  $34,110
    3. Christopher Hall  24.9%  $18,297
    4. Turner Hall     11.4%  $16,075
     Energy Advancement Category  % Improvement  Incentive Award
    1. David Kinley Hall 39.9%   $33,701
    2. Lincoln Hall 32.0%   $15,961
    3. Early Childhood Development
        Building
    24.2% $10,000
    4. Davenport Hall  19.6%  $10,000

     

  13. Climate Change issues

    Congzhu Ruan's report on Climate Change issues - part one.  Part two will be produced in Spring 2015.  She said, "Here is the draft of the report,it basically covers all the points but I plan to do some editing (to correct typos and grammar if there's some, perhaps add some new points if I find some!) this winter to make it better."

    Attached Files: 
  14. BIF crosswalk survey overview

    U of I F&S Trial Crosswalk between the Business Instructional Facility (BIF) and Wohlers Hall

    In recent years, pedestrian safety on-campus has become a growing concern at the University of Illinois at Urbana-Champaign (U of I). One such issue was raised by U of I’s College of Business, specifically on the frequency of pedestrians jaywalking between the Business Instructional Facility (BIF) and Wohlers Hall, just south of the intersection at Sixth Street and Gregory Drive. Using funding from the College of Business, U of I’s Facility & Services (F&S) implemented a temporary mid-block crosswalk in the area on September 22, 2014.

    In order to assess if this temporary crosswalk should be installed permanently, a survey was created by 2 Liberal Arts & Sciences (LAS) James Scholars (Sicong Fang and Ethel Liao) with the guidance of U of I F&S employees (Morgan Johnston, Stacey DeLorenzo, and Roland White). The survey collected over 500 electronic responses from the perspectives of pedestrians, bicyclists, drivers, and bus drivers in the affected area for 2 weeks from October 31 - November 14, 2014. Survey participants included U of I students, staff, faculty, and guests; they were contacted via targeted email newsletters (departmental, eweek, F&S, and CUMTD), official U of I social media channels (Facebook and Twitter for F&S, the College of Business, and CUMTD), and on-site surveying with iPads by the LAS James Scholar students. Questions on the survey were based on a 1 to 5 number scale and allowed respondents to explain why they rated each item as they did. Topics covered included how perceptions on safety, convenience, and traffic flow changed upon the temporary crosswalk’s installation; there was also an area for respondents to suggest other problematic transportation spots on-campus and how the process F&S went through for this crosswalk may be improved for future projects. Final analytics on collected data were done by Sicong with the help of the summarization function in Google Forms.

Pages