- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- Associated Project(s):Attached Files:
Daily update
Associated Project(s):Hi everyone, As expected our rate of drilling today slowed when drilling the shale bedrock. The crew was able to drill an additional 25 feet to a depth of 355 feet.
Next week, since Monday will be the last day we have to drill the hole deeper, we have decided to stop coring and just drill straight through so that we can reach the target depth of 450 feet. Tuesday is needed to clean out the borehole so that geophysical logging can be done on Wednesday. On Thursday and Friday, we will install the geothermal loop and fiber optic cable and grout the hole closed.
Have a great weekend.
Andy
18F Semesterly Report - Inner Voices
Associated Project(s):Inner Voices Fall 2018 semesterly report submitted to SSC in December 2018.
Daily update
Associated Project(s):Hi everyone,
Today was spent widening the borehole to 290 feet. We will begin to drill deeper into the bedrock Thursday morning.
Best,
Andy
Daily update
Associated Project(s):Hi Everyone, We are starting out Wednesday morning at 294 feet, about 5 feet into the bedrock. The crew will be widening the hole this morning from 5 inches to 5.9 inches before going deeper into bedrock. Looks like a nice day for drilling!!
Andy
Low flow toilet/urinal flush at UGL update
Associated Project(s):The F&S Plumbing shop plans to begin installation of the 1.6-gallon units on 1/2/2019. The F&S Plumbing shop came up with an estimate to replace all the toilets (12) and four urinals at the Undergraduate Library with 1.6-gallon per flush units. It would be around $5500. The material is over $3000 the rest would be labor.
News-Gazette article
Daily update
Associated Project(s):Hi everyone,
After a morning of thawing out the drilling system from well below freezing temperatures on the weekend, we were able to reach 240 feet. With the top bedrock being <60 feet, it is likely they will reach it on Tuesday.
My colleague Jason Thomason will be at the site on Tuesday while I am out of town.
Best,
Andy
Weekly update
Associated Project(s):All, Visitor numbers are down, sales are down, builds are ever-creeping up: It must be winter!
We’re only averaging a few actual work-on-my-bike visitors per day now, and I imagine it’ll get even slower the closer we get to winter break. The student staff has responded positively to the shift in shop build protocol away from piecemeal jobs and towards being wholly responsible for the bike, start to finish. I don’t think it has actually positively affected the quality of their work—yet—but they seemed more engaged and invested in the task at hand.
Not sure the numbers on it but I feel like I’ve had a pretty steady flow of volunteers in for either community service or volunteer memberships. Not too many volunteer duds, as most seem pretty jazzed and impressed with the space/DIY idea.This week I’ve got a meeting with the GM of VeoRide and separately, a TBP-UIUC meeting, as well as student staff training towards the end of the week.
The numbers:
Visitors: 43Sales: $144.50
Memberships: 2 for $60
Thanks!
- Jake Benjamin
Campus Bike Center ManagerNovember Buyer's Share
Associated Project(s):RailSplitter Wind Farm provided the November 2018 Buyer's Share amounts by hour, totalling 2,179.2 Megawatt hours. See attached file.
Attached Files:SSC Step 2 Voting Meeting Minutes
Associated Project(s):SSC convened on December 8, 2018, to select Step 2 projects for funding.
Attached Files:Daily update
Associated Project(s):Hi everyone,
We had a successful day 2 after deicing the system. We are now down to 165 feet and heading into the oldest glacial strata. If you are following along with the log I sent, we are about 170 feet on it.
We will start up again Monday morning.
Best,
Andy
daily update
Associated Project(s):Hi everyone,
After day 1 we have drilled to a depth of 90 feet. This is excellent progress with snow much of the day, and not getting in the ground until late morning.
So far, the geology is similar to previous drilling in the area (see log attached).
Cheers,
Andy
eGen SWATeam Meeting Minutes
Associated Project(s):On December 6th, 2018 the eGen SWATeam had their 6th and final meeting of the Fall '18 semester.
Attached Files:ECBS SWATeam Meeting Minutes
Associated Project(s):On December 6th, 2018, the ECBS SWATeam had their 4th and final meeting of the Fall '18 semester.
Attached Files:iWG Meeting Minutes December 6th, 2018 (draft)
Associated Project(s):Attached are the draft meeting minutes from the iWG meeting that was held on December 6th, 2018. Minutes will be finalized at the upcoming February 7th, 2019 iWG meeting.
Attached Files:Meeting Minutes 6 December
Associated Project(s):Ideas for recommendation related to post-consumer waste reduction, recommendations to continue in Spring semester
Attached Files:SSC funds Red Bison micro grant
Associated Project(s):SSC funds a Red Bison micro grant, purchasing landscaping equipment.
Attached Files:SSC Funds LED Farming Micro Grant
Associated Project(s):The objective of this project is to find out the relationship between the position of the LED lighting and plant growth. As a final product this student team will design and create an optimal LED plant pot that is aesthetically pleasing using 3D printing.
Attached Files:27 November 2018
Associated Project(s):The attached file contains the minutes from the Transportation SWATeam meeting.
Attached Files: