You are here
All Project Updates
Search
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- Associated Project(s):Attached Files:
Illinois Farm Sustainability Calculator
Associated Project(s):Is your farm sustainable? How can you make your farm sustainable? The Illinois Farm Sustainability Calculator can help you figure out these things out. And it's pretty easy to use. See the list of tabs on the bottom of your screen? Navigate through them by using the grey buttons at the top of the sheets or by hitting ctrl+page down (cmd+page down on macs) In each sheet, fill each white box with data from your farm. Be sure to make a selection in all of the white drop-down boxes too. If you don't know something, leave the default number or the default selection in place. If your farm does not have ten separate fields, leave the extra field sheets unchanged. Same goes for any extra ruminant, swine, and poultry sheets.
Attached Files:Energy draft files
Associated Project(s):Space Neutral draft file
Associated Project(s):Attached Files:Transportation chapter draft with notes
Associated Project(s):The attached file is a draft for the Transportation section of the 2010 iCAP.
Attached Files:draft energy tasks
Associated Project(s):Attached Files:Foreign Language Building
Associated Project(s):A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.
CCNet Current Sustainability Efforts In The CU
Associated Project(s):See attached
Attached Files:Revised MOA
Associated Project(s):Attached is the revised MOA and a copy of the prairie layout
The Sustainable Operations Task Force met and developed this list of iCAP items
Associated Project(s):Carl Wegel at F&S created this file.
Attached Files:Funding request submitted to SSC for FY10
Associated Project(s):In April 2009, The Bike Project (TBP) representatives submitted an application for funding to the Student Sustainability Committee (SSC). In June 2009, the SSC awarded $30,000 for the shop construction.
Krannert Center for the Performing Arts
Associated Project(s):A total of 1,090 lighting fixtures in the Krannert Center for the Performing Arts were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 171,871 hours. The Simple Payback for changing the fixtures in the Krannert Center is 2.26 years.
Creation of the Campus Bicycle Shop
Associated Project(s):In spring of 2009, discussions began between the University of Illinois and The Bike Project of Urbana-Champaign, regarding an on-campus bicycle shop. Fred Davidson, Joel Gillespie, and Tony Cherolis were key representatives of The Bike Project. Morgan Johnston, Steve Veazie, and Jeff Courson were key representatives of the UI. The files attached here represent some of the effort that initiated this program.
The original shop was called the Campus Bike Project.
Dairy Cattle Composting Facility study
Associated Project(s):Previous composting study “U08067 Dairy Cattle Composting Facility” reviewed options for full scale complete composting of animal, food, agriculture, and landscape waste. Study was cancelled before completion because ACES ran into budget issues and the whole Dairy program was slated for potential reduction or elimination.
Attached Files:Prairie Restoration at Florida & Orchard Funding Agreement
Associated Project(s):This proposal looks to restore the no-mow zone at the southwest corner of Florida Ave. and Orchard St., as the campus’ first prairie planting. It will provide a site for an array of learning and passive recreation opportunities for both students and members of the extended community, while sequestering greenhouse gases as tangible evidence of the campus commitment to responsible sustainable behavior. Thus, the Student Sustainability Committee is in favor of funding the fully requested amount of $40,000.
Attached Files:Sustainability committee response letter- Florida and Orchard Prairie.pdf
Sustainability committee response letter- Florida and Orchard Prairie.doc
SSC Final Allocation Approval - Florida and Orchard Prairie.pdf
SSC Final Allocation Approval - Florida and Orchard Prairie.doc
SSC revision questions 2013 final 2 .docx
after_survey_pres_boards_04212011.pdf
Change in Scope Approval_2013.docx
Florida and Orchard Prairie Funding Deadline Extension.doc
Florida and Orchard Prairie Funding Deadline Extension.pdf
Florida and Orchard Prairie Proposal.doc
No-Mow Prairie Final.pdf
NRB and FL-Orchard Change in Scope Approval_2013.pdf
Prairie budget.pdf
prairie_examples_06232011.pdf
Red_Bison_Prairie_Fund_Extension.pdf
Rev MOA - Gifts in Kind PrairieRestoration Jack Pizzo Associates.doc
Vet-Med Prairie Funding Agreement
Associated Project(s):The goal of this project would to be to plant a tallgrass prairie garden that mimics the natural prairie growth of Illinois. The garden would go in two locations front of the Basic Sciences Building and be about 10200 sq ft. The garden would consist of 40-50 different plants and consist of around 10000 seedlings. This project will create an area of native habitat on our campus, help educate and engage students about the prairie landscape, integrate with educational opportunities and serve as a pilot for future initiatives of this kind. Therefore, the Student Sustainability Committee is in favor of funding the project for $21,700.
Student Farm Local Foods Funding Agreement
Associated Project(s):The goal of this project is to start a student-operated farm that produces significant quantities of fruits and vegetables for use in the University food service operations. The operation of such a farm will be of significant educational value, reduce carbon emissions associated with food production and transportation as well as be of value to Extension programs. Additionally, this project furthers the university’s role as a land grant institution. Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $50,000.
Solar Decathlon 2009 Funding Agreement
Associated Project(s):This proposal seeks to provide funding for student education centered around the University of Illinois’s participation in the 2011 US Department of Energy Solar Decathlon Competition. Each student team participating in this prestigious, international competition is required to build an entirely solar-powered 800 sq. foot house with innovative design features. This grant will provide funds for the development of new courses and enhancement of existing courses, provisioning of course materials and software, and the sponsorship of guest lecturers and consultants ($25,000), the employment of graduate students in coordinating roles for education and volunteer engagement activities ($15,000), and student travel associated with the competition ($10,000). The last UI entry in the Solar Decathlon competition engaged hundreds of students and was the highest-placed US finisher in the Competition; furthermore this participation will require the team to raise $700,000 at a time of severe campus budget constraints. Thus, the Student Sustainability Committee is in favor of funding this proposal in the amount of $50,000.
Shut the Sash Model Program Funding Agreement
Associated Project(s):Lowering the sashes on laboratory chemical fume hoods (CFHs) can result in significant energy cost savings by reducing the volume of room air that has to be heated or cooled. This project will evaluate the resources, components, and best practices required to develop a model shut the sash program and implement it campus-wide for variable air volume (VAV) CFHs. If successful, the project could generate over $250,200 in annual cost savings. Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $4,400.
Power Plant Carbon Sequestration via Algae Biodiesel Production Funding Agreement
Associated Project(s):The goal of this project is to construct an Algae Biodiesel Production Facility at Abott power plant. This facility will sequester some of the flue gases produced at Abott power plant while providing a renewable, carbon neutral fuel source for transportation. The project offers potential for scaling, involves many student organizations and is also expected to be of research interest. Thus, the Student Sustainability Committee is in favor of partially funding the requested amount to the extent of $13,000