Projects Updates for place: Digital Computer Laboratory

  1. EGen005 Rooftop Solar Standards recommendation - Submittal

    The eGen SWATeam submitted a recommendation to the iWG stating, "Incorporate a building design standard into the University of Illinois at Urbana-Champaign Facilities Standards that requires all new buildings on-campus to include a rooftop solar array covering the majority of rooftop surface area."

    See attached the SWATeam recommendation EGen005 Rooftop Solar Standards complete with comments from all the eGen SWATeam members.

  2. EGEN SWATeam Meeting (1.20.17)

    The EGEN SWATeam held their first meeting for the Spring 2017 semester. Topics covered include:

    • Review draft recommendations for 1) on-campus solar and 2) petascale offsets
    • An update from Morgan Johnston on the Associate Director of Campus Sustainability position
    • Updating iCAP portal project pages for EGEN objectives
    • Clean Energy PPA
    • Potential for future solar farm
    • Asking for feedback from EGEN team members regarding recommendation proces
  3. EGEN SWATeam Meeting (12.2.16)

    The EGEN SWATeam held their final meeting for the Fall 2016 semester. Topics covered include:

    • Guest presentation by Niharika Kishore regarding rooftop solar on campus
    • Potential recommendations to Working Group
    • Potential solar: greenspace vs. rooftop vs. parking lot cover
  4. EGEN SWATeam Meeting (11.9.16)

    The EGEN SWATeam held their fourth meeting for the Fall 2016 semester. Topics covered include:

    • Guest presentation by Yu-Feng Forrest Lin to discuss his work on investigating campus geothermal properties
    • View draft recommendation for Petascale offsets
    • Review draft recommendation for on-campus solar
  5. EGEN SWATeam Meeting notes (10.12.16)

    The EGEN SWATeam held their third meeting for the Fall 2016 semester. Topics covered include:

    • Development of formal SWATeam recommendatino to the working group regarding offsets for Petascale
    • RECs - does this get us to our goal?
    • Potential recommendations for rooftop solar
  6. Student solar efforts renewing for fall 2016

    Niharika Kishore, masters in Urban Planning (MUP) student, and Corey Weil, sophomore in Electrical and Computer Engineering, are working with Morgan Johnston on the iSEE objective for on-campus solar.  Niharika will continue her efforts for promoting rooftop solar to meet the iCAP objective for 12,500 MWh/year of on-campus solar energy generation as part of a MUP capstone project this year.  Corey will volunteer in various efforts to support the development of solar solutions for campus, from the Net Zero Energy ECE efforts to advocating for solar energy funding.

  7. Possibility for rooftop solar on Mechanical Engineering Building

    Associated Project(s): 

    After the August 5th presentation by Niharika Kishore to College of Engineering facilities contact Greg Larson, Greg spoke with Mechanical Engineering facilities contact Damon McFall about roofotp solar for the Mechanical Engineering Building (MEB).  Morgan Johnston explained that MEB had been left off the list Niharika worked on because of the upcoming Capital Programs project in that facility.  Greg indicated that they are interested in pursuing rooftop solar for MEB.  Potentially the design could be included in the Capital Project design effort, and the installation would need to be funded separately.  This roof could hold approximately 130 kW array.

     

  8. Niharika Kishore sending email to potential facilities

    Niharika Kishore will send an email to potential facilities for adding rooftop solar, in support of the 2015 iCAP objective.  The draft email is attached and the list of potential facilities is as follows:

    Building Estimated Yearly Output (kWh/yr)
    Physical Plant Services Building 791,522
    Activities and Recreation Center 725,562
    Law Building 395,761
    Ikenberry Dining Hall 382,569
    Abbott Power Plant 263,841
    Digital Computer Library 263,841
    Plant Sciences Laboratory 164,900
    Timothy J. Nugent Hall 164,900
    Institute of Genomic Biology 158,304
    Richard T. Ubben Basketball Complex 151,708
    Oak Street Library 151,708
    Bousfield Hall 145,112
    Garage and Carpool 125,324

     

    Attached Files: 
  9. Niharika Kishore is working on developing a rooftop solar RFP for design

    Today, Morgan Johnston met with Niharika Kishore to discuss the rooftop solar iCAP objective.  Niharika is going to review the work already done, in the iSEE solar box folder, and draft a proposal for getting the engineering design work done for a set of building.  She will be working towards meeting the FY20 on campus generation goal of 12,500 MWh/year, and possibly additional installations for FY25.

  10. Art and Design Building solar design

    A group of seniors completed the attached report for the Art and Design Building, for rooftop solar.  They recommended a flexible solar material, with micro-inverters.  The Art and Design department is interested in working with a student in the fall to seek funding for the rooftop solar from the Student Sustainability Committee.

    Attached Files: 
  11. Rooftop Solar Student Project

    Brendan McDonnell is working with F&S to identify the best buildings on campus for rooftop solar.  Brendan is a MechSE graduate student working toward an MS in ME with a certificate in Energy Systems Engineering, and this is his summer capstone project.  Professor Elif Ertekin is his advisor for the project, and Morgan Johnston is his supervisor at F&S.   The files Brendan is collecting are stored in the iSEE Solar box folder at https://uofi.app.box.com/files/0/f/2802975201/iSEE_-_Solar_Working_Group....

  12. Gregory Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 426 T-12 fixtures in Gregory Hall were replaced with the more energy-effiecient T-8 fixtures. This switch will incur an Annual kWh Savings of 68,862 hours. The simple payback for this project is -4.1 years. There are 777 T-12 fixtures in Gregory Hall remaining to be switched.

  13. David Kinley Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 858 T-12 fixtures in the David Kinley Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 84,223 hours. The simple payback for this project is -5.36 years. There are 54 fixtures that remain to be done in David Kinley Hall.

  14. Morrill Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 195 T-12 fixtures in Morrill Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 25,781 hours. The simple payback for this project is -4.45 years. There are 2,594 T-12 fixtures in Morrill Hall that remain to be switched.

  15. Lincoln Hall

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,728 T-12 fixtures in Lincoln Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 99,886 hours. The simple payback for this project is -8.03 years.

  16. Vet Med Basic Sciences Building

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 4,248 T-12 fixtures in the Vet Med Basic Sciences Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 796,429 hours. The simple payback for this project is 0.11 years.

  17. Vet Med Large Animal Clinic

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,990 T-12 fixtures in the Vet Med Large Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 320,117 hours. The simple payback for this project is 0.23 years.

  18. Vet Med Small Animal Clinic

    Associated Project(s): 

    As part of the ICECF 2009 Lighting Retrofit, 1,928 T-12 fixtures in the Vet Med Small Animal Clinic were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 67,145 hours. The simple payback for this project is 0.83 years.

Pages