Projects Updates for theme: Engagement

  1. SAFS Phase 2 Agreement

    This project is a significant expansion of the current local food partnership existing between the Student Sustainable Farm (SSF), Multifunctional Woody Perennial Polyculture (MWP), FSHN Pilot Processing Plant (PPP), and UIUC Dining. Presently the Sustainable Agriculture Food System grows, processes, and serves on campus a variety of tomato sauces (pizza sauce is served across campus) and hot sauce. Soon, the Sustainable Agriculture Food System will add a whole wheat flour milling line. It have a very successful and growing program to provide quality, sustainable, and local food products and education to the UIUC students. This particular project will focus on the addition of a fresh juice processing line that will be able to handle a wide array of fruits and vegetables, packaged into an array of containers from single serving to bulk. As with the other projects, this partnership has no funding for large capital equipment expenditures, and relies on grants to increase its capacity. Dining Services is a strong partner in this project and has agreed to provide a grant to help with the purchase of items needed to produce fresh juice products including a harvester for fruit from the MWP site. The full proposal requested both juice extraction and juice bottling equipment. This phase of funding covers remaining bottling equipment costs. All bottles will feature messaging urging students to recycle and spotlighting sustainable goals and outcomes This proposal directly funds: 1) Bottling equipment 2) Some associated supplies.

  2. Funding Letter - Geothermal TRT

    The applied for funding will be used in the construction of a Thermal Response Test unit for use in the Geothermal Pilot project that is currently being implemented on the UIUC Campus. The overall goal of the project is to assess the viability of geothermal heat exchange on this campus as well as the best implementation of this technology. The Thermal response test unit will measure the ability of the local geology to support geothermal heat exchange in the future. The unit will be designed to be used in all future geothermal projects. This project is student-led, and development and construction of the Thermal Response Test Unit will be conducted entirely by University of Illinois students. This proposal directly funds: 1) Construction Supplies 2) Transportation Costs.

  3. Funding Letter - Bike Maintenance Instructor

    Since 2010, The Bike Project has been collaborating with the University of Illinois to provide an educational space on campus. Bicycle education taught through that space encourages the campus community to ride bicycles for transportation because the bicycles sold and worked on at the Campus Bike Center are reliable and safe. While some people are willing to volunteer to teach advanced level bicycle repair classes at the Bike Center, few are willing to teach very basic entry-level classes addressing such issues as adjusting brakes, lubricating chains, and fixing flat tires. This project funds two semesters of stipend for an instructor to teach classes at the Bike Center covering these topics. Combined class capacity over the two semesters would exceed 200 new cyclists. This proposal directly funds: 1) Two semesters of labor for a beginner-level bicycle class.

  4. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Status of our recommendations to iWG;

    2) Review of Illini Lights Out over the past year;

    3) Any final thoughts, recommendations for Eco-Olympics;

    4) Progress on building energy standards;

    5) Updates on the revolving loan fund (RLF) projects;

    6) Turning off computers.  Change in policy, at least at F&S.  Implications for Certified Green Office Program? 

    7) Building level energy consumption report summary;

    8) Good-byes and thanks to departing members.

  5. IBI update

    Associated Project(s): 

    ILLINOIS BIODIESEL INITIATIVE: This past semester, students produced 100 gallons of biodiesel fuel and 2 gallons of soap from waste vegetable oil. The soap-making subgroup is refining its soap recipe for use at campus dining halls, and the diesel subgroup is improving the production process to make higher-quality fuels.

  6. Morgan Johnston speaks to Parkland Board of Trustees

    In support of installing solar PVs at Parkland College, Morgan Johnston spoke to the Parkland College Board of Trustees, as requested by their VP of Institutional Advancement and Sustainability Coordinator.  Ms. Johnston shared the benefits and lessons learned from the university's solar farm installation.

  7. March 2017 Sustainability Council Recommendations & Next Steps

    Director of iSEE, Evan DeLucia, summarized three recommendations presented at the March 2017 Sustainability Council meeting: EGen005 Rooftop Solar Standard, EGen003 Power Purchase Agreement (PPA) Timeline, and ECons003 Conservation Budget, as well as the next steps, for Chancellor Jones’ approval.

    We followed up with the Sustainability Council on April 25, 2017, with the attached file.

    See Transmittal of EGen005 Rooftop Solar Standards here.

    See iWG Assessment for SWATeam recommendation EGen005 Rooftop Solar Standard here.

    See SWATeam recommendation EGen005 Rooftop Solar Standards here.

    See Transmittal of EGen003 PPA term to the Sustainability Council here.

    See iWG Assessment of EGen003 PPA Term here.

    See SWATeam recommendation EGen003 PPA Term here.

    See Transmittal of ECONS003 Conservation Budget to the Provost Office

    See iWG Assessment of ECONS003 Conservation Budget

    ee SWATeam Recommendation of ECONS003 Conservation Budget

     

  8. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Report from Karl on projects he has been working on:

       a) Enterprise Works - proposed revolving loan project.  Awaiting departmental funding of $350K to complete project. 

       b) Memorial Stadium RCx work - This appears to be getting $500K in funding.

       c) National Soybean Research space walk preview.  

    2)  Discussion on LEED requirements as iCAP goal

    3)   BIF lighting follow up

    4)  Final planning for ILO on Friday, April 14

    5)   Updates:

       a) Eco-Olympics

       b) Recommendation for ILO continuation submitted by Marian

       c) Green Labs Coordinator position

    6) SWATeam next meeting time and date:  April 27th, from 3:30 to 5 pm. 

  9. John Marlin speaks at Campus Appreciation Day

    Dr. Marlin spoke on how student initiated projects in the 1970s carried over to the present including recycling, river protection, highway policy and bikeways. The majority of his presentation focused on student involvement in local native planting projects to help preserve biodiversity, especially of pollinators such as bees and butterflies.

  10. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Final review of Illini Lights Out (ILO) recommendation;

    2) Scott Willenbrock visiting April 14 meeting;

    3) Updates:

    - iCAP Portal.  Work of Morgan and Chenxi Jiang;

    - Earth Hour photo;

    - Eco-Olympics;

    - Green Lab Coordinator

    4) SWATeam next meeting time and date:  April 13th, from 3:30 to 5 pm. 

  11. iWG meeting agenda March 28, 2017

  12. iWG meeting minutes March 28, 2017

  13. ECBS SWATeam meeting minutes

    On the agenda at the ECBS SWATeam meeting:

    1) Comments needed on Illini Lights Out (ILO) recommendation;

    2) Illini Lights Out final planning for 10th of March;

    3) Building level energy consumption report;

    4) Participation in Earth Hour and Earth week activities on campus;

    5) Updates on the Green Labs Coordinator;

    6) Planning for a campus walk focused on space utilization.

     

  14. iWG Meeting Notes from Jan. 27, 2017

    The iCAP Working Group met and discussed the following agenda items.  Meeting notes are attached.

    1. Brief iCAP Portal overview by Morgan
    2. Discuss any updates to Water002, Cooling Tower Increase COC
    3. Discuss Trans008, Bike Parking in Ramps
    4. Discuss updates to Econs004, Green Labs Coordinator
    5. Consider issues with recommendation process and view recommendation tracker

    Attached Files: 