You are here
Projects Updates for iCAP Working Group (iWG)
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- Associated Project(s):Attached Files:
South Campus Afforestation Recommendation - Assessment with comments
Associated Project(s):The iCAP Working Group (iWG) met on Feb 16, 2017. They supported the South Campus Afforestation recommendation. Their official comments for this recommendation was:
"The iCAP includes an objective to add 50 acres of trees on campus, and this SWATeam recommendation suggests one potential location. The iWG suggests the College of ACES work with the Campus Master Planning committee to identify appropriate locations for additional trees. Another option to consider is parallel to the Embarras River."
See attached the iWG assessment complete with comments from all the iWG members.
Attached Files:iWG Meeting Notes from Jan. 27, 2017
Associated Project(s):The iCAP Working Group met and discussed the following agenda items. Meeting notes are attached.
1. Brief iCAP Portal overview by Morgan
2. Discuss any updates to Water002, Cooling Tower Increase COC
3. Discuss Trans008, Bike Parking in Ramps
4. Discuss updates to Econs004, Green Labs Coordinator
5. Consider issues with recommendation process and view recommendation trackerAttached Files:EGen005 Rooftop Solar Standards recommendation - Transmittal
Associated Project(s):Following the completion of iWG assessment, the SWATeam recommendation EGen005 Rooftop Solar Standards was transmitted to the Sustainability Council on March 6, 2017.
See iWG Assessment for SWATeam recommendation EGen005 Rooftop Solar Standard here.
See SWATeam recommendation EGen005 Rooftop Solar Standards here.
EGen003 PPA term recommendation - Transmittal
Associated Project(s):Following the completion of the iWG Assessment, the EGen003 PPA Term recommendation was transmitted to the Sustainability Council.
See iWG Assessment of EGen003 PPA Term here.
See SWATeam recommendation EGen003 PPA Term here.
EGen006 Petascale Offsets recommendation - Assessment with all comments
Associated Project(s):The iCAP Working Group (iWG) met on February 23rd, 2017, to discuss and start the assessment on the SWATeam recommendation EGen006 Petascale Offsets. The iWG's official recommendation was:
"This has been an open issue since the 2010 iCAP and the 2015 iCAP. This should be addressed with the current discussions about supercomputing on campus."
See attached the iWG assessment complete with official comments from all the iWG members.
Attached Files:EGen005 Rooftop Solar Standards recommendation - Assessment with all comments
Associated Project(s):The iCAP Working Group (iWG) met on February 23, 2017, to discuss the SWATeam recommendation EGen005 Rooftop Solar Standards. The official recommendation from the iWG was:
"Rooftop solar should be included in the Facility Standards, with guidance developed by F&S staff, in order to maximize the effectiveness of solar installations. This should apply to new construction, major renovations, and roof improvement projects. Project scopes should include rooftop solar, as applicable, based on the guidance to be developed according to roof orientation, nearby shading, potential solar capacity, and roof construction type (e.g., gypsum would be an inappropriate roof decking for retrofitting with solar PVs). Exceptions should require a variance during the capital design review process."
See attached the assessment form complete with official comments from all the iWG members.
See SWATeam recommendation EGen005 Rooftop Solar Standards here.
Attached Files:Campus Tree Inventory Recommendation - assessment with comments
Associated Project(s):The iCAP WOrking Group (iWG) met on February 23rd, 2017, to discuss and start the assessment of SWATeam recommendation ALUFS002 Campus Tree Inventory. Their official comment on this recommendation was:
"The iCAP Working Group supports the use of the Carbon Credit funds for a tree inventory update."
See attached the iWG assessment complete with official comments from all the iWG members.
Attached Files:iWG meeting minutes February 23, 2017
Associated Project(s):see file
Attached Files:iWG meeting agenda February 23, 2017
Associated Project(s):see file
Attached Files:iWG meeting agenda January 27, 2017
Associated Project(s):see file
Attached Files:iWG meeting minutes January 27, 2017
Associated Project(s):see file
Attached Files:Water001 BIF Greywater Meter recommendation - Assessment with comments
Associated Project(s):The iCAP Working Group (iWG) met on December 20, 2016, to discuss and start the assessment of SWATeam recommendation, Water001 BIF Greywater Meter. The iWG's official comment on the recommendation was:
"A permanent real-time water meter should be installed on the greywater piping system in BIF, and the collected data should be made available in the Energy Billing System and through an online dashboard."
See attached the iWG assessment of Water001 BIF Greywater Meter complete with official comments from all the iWG members.
See SWATeam recommendation Water001 BIF Greywater Meter here.
Attached Files:Water003 Design Center Greywater Piping recommendation - Denied
Associated Project(s):The iCAP Working Group (iWG) met on December 20, 2016, to discuss the SWATeam recommendation, Water003 Design Center Greywater Piping. After some discussion, the iWG rejected this recommendation.
See SWATeam recommendation Water003 Design Center Greywater Piping here.
iWG meeting agenda and minutes December 20, 2016
Associated Project(s):see file
Attached Files:EGen004 Electrification Study recommendation - Returned
Associated Project(s):The iCAP Working Group (iWG) met on December 6, 2016, to discuss the SWATeam recommendation, eGen004 Electrification Study. The iWG agreed to return the recommendation to the eGen SWATeam for further discussion with F&S, iSEE, and other stakeholders.
See SWATeam recommendation eGen004 Electrification Study here.
iWG meeting agenda December 6, 2016
Associated Project(s):see file
Attached Files:iWG meeting meeting December 6, 2016
Associated Project(s):see file
Attached Files:iWG meeting minutes November 16, 2016
Associated Project(s):see file
Attached Files:iWG meeting agenda November 16, 2016
Associated Project(s):see file
Attached Files: