Project Updates

  1. Funding for employee from F&S Executive Director

    Associated Project(s): 

    This afternoon, I verified with Jack Dempsey that he is still willing to fund a 900-HR extra-help employee for the first year of the new Campus Bike Project.  The employee will be paid $12.00 per hour for 900 hours, so the full cost is $10,800. - Morgan Johnston

  2. Main Library (6th Stack)

    A total of 379 lighting fixtures in the Main Library (6th Stack) were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 55,547 hours. The Simple Payback for changing the fixtures in the Main Library (6th Stack) is 6.66 years.

  3. Wohlers Hall

    As part of the ICECF 2009 Lighting Retrofit, 1,071 T-12 fixtures in the Wohlers Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 168,358 hours. The simple payback for this project is 0.83 years.

  4. Interim Report of sustainable operations task force

    The Sustainable Campus Operations Committee (SCOC) was charged with developing the operational plans for a sustainable campus. The approach taken by the committee is aligned with campus strategic planning. The implications of the campus strategic plan and the sustainable campus plan are intimately connected, and they should be discussed in ways where their linkages are visible and understood.  Decision-making for sustainability needs integration with decision-making at all levels of university administration. In this spirit, the format of this interim report provides an overview of the preliminary goals, strategies and metrics for sustainable campus operations.

  5. Illinois Farm Sustainability Calculator

    Associated Project(s): 

    Is your farm sustainable?  How can you make your farm sustainable?  The Illinois Farm Sustainability Calculator can help you figure out these things out.  And it's pretty easy to use.  See the list of tabs on the bottom of your screen?  Navigate through them by using the grey buttons at the top of the sheets or by hitting ctrl+page down (cmd+page down on macs)  In each sheet, fill each white box with data from your farm.  Be sure to make a selection in all of the white drop-down boxes too.  If you don't know something, leave the default number or the default selection in place.  If your farm does not have ten separate fields, leave the extra field sheets unchanged.  Same goes for any extra ruminant, swine, and poultry sheets.

  6. Foreign Language Building

    A total of 2,694 lighting fixtures in the Foreign Language Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 424,790 hours. The Simple Payback for changing the fixtures in the Foreign Language Building is 3.06 years. Occupancy sensors were also installed in this facility for further energy savings.

  7. Creation of the Campus Bicycle Shop

    Associated Project(s): 

    In spring of 2009, discussions began between the University of Illinois and The Bike Project of Urbana-Champaign, regarding an on-campus bicycle shop.  Fred Davidson, Joel Gillespie, and Tony Cherolis were key representatives of The Bike Project.  Morgan Johnston, Steve Veazie, and Jeff Courson were key representatives of the UI.  The files attached here represent some of the effort that initiated this program.

    The original shop was called the Campus Bike Project.

  8. Dairy Cattle Composting Facility study

    Associated Project(s): 

    Previous composting study “U08067 Dairy Cattle Composting Facility” reviewed options for full scale complete composting of animal, food, agriculture, and landscape waste.  Study was cancelled before completion because ACES ran into budget issues and the whole Dairy program was slated for potential reduction or elimination.