Project Updates for collection: all
Search
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):Attached Files:
Addition to the original description: Keys to reducing bicycle theft
Associated Project(s):Keys to reducing bicycle theft:
- Never leave your bicycle unlocked!
- Always lock your bicycle to a bicycle rack! Learn how to properly lock your bicycle Lock Your Bike Right (LYBR) video from 2019.
- Register your bicycle and install the registration sticker (529 Shield) to your bicycle. Learn more at Bike at Illinois' Register Your Bike page or go.illinois.edu/mybike
- Report a bike theft to UIPD immediately at (217) 333-1216.
Conclusion; Lessons learned; Issues encountered
Associated Project(s):The Bike Shelter was installed North of the Flagg Hall in June 2021. The structure dimensions are 14' x 63' with 6.5' height on one side and 8' on the other side. The bike shelter utilizes Side Stage (vertical) bike racks and can accommodate up to 73 bicycles. Due to manufacturing error, the structure is 2' short and because of this, one side (south side wall) of this bike shelter cannot accommodate bicycles on the top tier. The top tier on this side of the bike shelter will be blocked off using signs. The original capacity of this bike shelter was 96.
There were several issues with this project:
- miscommunications between the vendor and the University staff
- lack of communication between the university staff and the Architecture Review Committee (ARC), which resulted in the purchase of a very large structure and, subsequently, change in the desired location for this structure
- staff change during the project
- lack of proper records and details about the project by the university staff in the beginning
- covid-19 pandemic resulted in some delay in this project as well
- miscommunications between the vendor and their manufacturers and engineering staff - which resulted in the delivery of wrong components and items of the structure. The structural design as reviewed and approved by the University was not what we received and the vendor did not rectify the error.
- missing components from the structure - there were several missing parts that the University had to cover (see the invoice for missing hardware). The University had to cover the cost of new Plexiglass as well as the missing roofing.
- descrepencies between the structural design, installation instructions, and the final delivery caused many more issues
- the structure was overall 2' shorter, i.e. the south wall of the bike shelter was supposed to be 8.5' high and the north was supposed to be 10' high, however, the after the construction, south wall and north wall came to be 6' and 8.5' high respectively. This descrepency caused the top tier of the south wall to be unusable.
- the original design called for Double-Docker style of bike racks, however, they had to be replaced with the Side Stage (vertical) bike racks
- vendor was sent the invoice for missing hardware, however, the vendor has not responded
- Awful customer support from the vendor
There were issues at every stage of this project, which was not helped with the non-cooperative customer support at Ground Control Systems. Learn more about the installation cost using the AiM account for this project: 6043.
Archived description: Bike Shelter at Flagg Hall
Associated Project(s):This Bike Shelter is 14' x 63', and it can accommodate up to 84 bicycles in two tiers. It was purchased from Ground Control Systems in 2018, and was initially planned to be installed to the West of Main Library. However, due to contruction conflicts, the location had to be changed. In 2019, several locations were identified and examined, for example, the Psychology Building and North of Henry Aministration Building (HAB). The HAB location was more suitable since it was a high demand area, however, the Bike Shelter was too big for the location, and the Architecture Review Committee (ARC) denied the location, citing the conflict of this structure with beautification of the main Quad.
In November 2019, North of Flagg Hall was identified as the new location for the bike shelter and it was approved by ARC. The bike shelter is expected to be installed and ready to use by the end of November 2020.
Student Code update approval: §2-605 Operation of Bicycles
Associated Project(s):The Conference of Conduct Governance (CCG) at the University of Illinois Urbana-Champaign has approved the changes proposed to the §2-605 Operation of Bicycles section of the Student Code during their June 2021 meeting. The Student Code will be updated with the following information over the summer 2021 in digital and printed format.
Please see attached the previous version of this section versus the updated information.
Request for a Project Update
Associated Project(s):From: Maloto, Avery (FandS)
Sent: Wednesday, July 7, 2021 3:10 PM
To: Trimble, Sydney (FandS)
Cc: White, Morgan; Varney, Peter W
Subject: [ACTION REQUESTED] Requesting Project Update: Outdoor Recycling Bin UpdateHi, Sydney!
I hope you are doing well. I’m reaching out regarding your project called 'Outdoor Recycling Bin Update.'
Each year, we ask several project contacts to review their information on the iCAP Portal to ensure that we are providing accurate and up to date information for the public. Our goal is to keep the iCAP Portal updated in real-time, and we need your help.
To make this process as easy as possible for you, I've created an 'iCAP Portal Content' document with your project information. All you need is to review and revise the existing information! Please open the links below and update as much information as possible, so I can put it on the iCAP Portal. You can also provide related images, files, websites, or videos to share. If you would like to get direct access to edit your project page on the iCAP Portal, please let us know.
• Link to Outdoor Recycling Bin Update's iCAP Portal project
page: https://icap.sustainability.illinois.edu/project/outdoor-recycling-bin-u...• Link to the iCAP Portal Content Guideline for Outdoor Recycling Bin
Update: https://uofi.box.com/s/y7r370o0ymq26w45ht0httqbn1zf45lqThe iCAP Portal is maintained by sustainability advocates at iSEE and F&S and volunteers. We are also able to assist you with embedding iCAP Portal information on other websites you maintain. Last year we had over 17,000 visitors to the iCAP Portal, and many are university students who use this online data repository for classes and research projects. If you have any questions about the iCAP Portal, please email icap@lists.mste.illinois.edu.
Please email me your revisions and any related files, per the links above, by July 9.
Thank you in advance for your help!
~Avery
Update on "Draft Bicycle Crash Reporting Form Created"
Associated Project(s):From: Prasad, Sarthak
To: DeLorenzo, Stacey; White, Morgan
Recipients: sdeloren at illinois.edu; mbwhite at illinois.edu
Hi Stacey and Morgan,
I was just looking at the Improve Reporting and Metrics for Bicycles project, and I saw a project update from 2013 by Amelia Neptune “Draft Bicycle Crash Reporting Form Created”. Does either of you remember if this form was actually made public or if there was any progress made on it?
I think this is a very neat way to report a bicycle crash and could be very important. Please let me know if there is a final form. If not, I would like to revisit this effort.
Thank you,
SarthakSarthak Prasad
Sustainable Transportation Assistant
Facilities & Services
University of Illinois Urbana-Champaign
Phone: 217-300-9575
Email: sprasad9 at illinois.edu
F&S Insider article about Good2Grind
Associated Project(s):Attached Files:Buildings Selected for Fall 2021 class
Associated Project(s):Dr. Yun Yi, Morgan White, Tom Keller, and Joe Villanti met on Zoom to select the buildings for the Architecture fall 2021 class. The buildings selected are:
- 0154 – Personnel Services Bldg. – Packaged chiller, steam perimeter heat, constant volume fan-coil units.
- 1528 – African Am. Cultural Ctr. – VAV.
- 0209 – Speech and Hearing – AHUs replaced recently and a small/medium sized building. VAV.
- 0075 – Children’s Research Ctr. - AHUs replaced recently and a small/medium sized building. Constant volume re-heat.
Morgan will reach out to UES for energy data and check with UIPD for building documents request process.
Weekly Update: Bike donations; Kid's bike giveaway on July 17
Associated Project(s):All, Last week we got inundated with donations. I counted 8 bikes donated on Friday alone. That doesn’t include wheels, tires, and parts that we received as well. We’ve got nearly half a dozen bikes in the queue that once on the sales floor will free up some space for more donations.
Our friends at TBP are hosting another Kids’ Bike Giveaway event for July 17th. We have a dozen or so bikes we’ll be able to contribute to that event. That’ll clear up some more space, too.
This week I hope to be able to start a new student worker.The numbers:
Visitors:
Sales: $103.75
Tire/tubes: 4 for $31Thanks!
Jacob Benjamin
Manager, Campus Bike Centerarchived info - previous project description
Associated Project(s):The campus is in the process of retrofitting older T12 fluorescent lighting fixtures by replacing them with more energy-efficient T8 (or T5) fixtures and electronic ballasts. The lighting retrofit proposed in the SAIC report would reduce campus energy consumption by ~1.6 percent; a very small amount of this is due to the use of occupancy sensors and day lighting controls. Extending this retrofit to smaller campus buildings, replacing other lighting fixtures (besides T-12s), and a wide deployment of both occupancy and daylight sensors (which can reduce lighting use by 20 percent to 80 percent depending on location) should be able to provide significantly more energy savings than predicted in the SAIC report. The campus target for energy savings from lighting is 2 percent.
archived info - previous project name
Associated Project(s):This project was previously named "Maintain or Reduce Gross Square Footage" and referred to as "Net-Zero Space."
Planning meeting on June 29, 2021
Associated Project(s):Morgan, Ryan, and Brent met in a conference room to review exact bin locations. They got through page A.
Installation Substantially Completed: Bike Shelter at Flagg Hall
Associated Project(s):In June 2021, the installation of bike shelter at Flagg Hall was substantially completed. It is now ready for use. F&S Grounds will be adding trees in mid-July.
Archive Info - Previous Project Description
Associated Project(s):In April 2017 three faculty members received $14,522 from the University Research Board to conduct preliminary investigations surrounding crop residue as a building material at both small and large scale. The results of those initial investigations proved very positive. This project primarily strives to turn corn stalks into a building project. Students will support Dr. Mark Taylor throughout the project, giving students research and professional development opportunities. The Student Sustainability Committee provided $47,000 in December 2017 to support the design and construction of a small mobile field station using agricultural waste. Upon completion, researchers and students will have a better understanding on how agricultural waste materials perform as a building material that can get used at a larger scale. Moreover, the campus will have a mobile field station that uses corn stock insulation.
Archived Info - Previous Project Description
Associated Project(s):The University of Illinois at Urbana-Champaign is helping to promote and encourage participation in the Solar Urbana-Champaign program.
The successful Solar Urbana-Champaign group purchasing program is available again in 2018. Since 2016, the program led to the installation of over 1 megawatt of solar on 138 properties across Champaign County. The program educated hundreds of individuals about solar and helped people save on solar through volume purchasing.
In 2018 the program expands eligibility to Piatt County residents as well. And, thanks to new state legislation, even more people can get access to solar. To increase awareness across Champaign and Piatt Counties, Midwest Renewable Energy Association partnered with Champaign-based Prairie Rivers Network, which champions clean, healthy rivers and lakes and safe drinking water to benefit the people and wildlife of Illinois.Archived Info - Previous Project Description
Associated Project(s):Geothermal Urbana-Champaign is a public education and bulk purchasing program that makes going geothermal easier and more affordable for Champaign, Piatt, and Vermilion County home and business owners. Made possible through a strong partnership between the City of Urbana, Geothermal Alliance of Illinois, and Midwest Renewable Energy Association, Geothermal Urbana-Champaign uses several key features to lower the price of geothermal for all program participants.
Whether you adopt geothermal this year or in five years from now, we truly hope you gain a better understanding of this technology and the energy options available to you through this program.
Some Key Features to this Program:
-
Public Education: Throughout this program, the MREA and GAOI will hold several free, virtual, hour-long informational events where you will learn the basics of geothermal, how it can save you money, and how the geothermal group buy program works.
-
Economy of Scale: Which is just a fancy way of say “bulk purchasing.” Through the power of bulk purchasing this program’s high quality contractor is able to offer a below market price/ton. The more people that go geothermal through this program, the lower the price will be for everyone
-
Competitive Contractor Selection: Led by the MREA, with help from a local advisory committee, the competitive selection process ensures that this program’s geothermal installations are performed by a high quality contractor at a below market price
-
Community Support & Outreach: Our programs are supported by both the leaders and community members of Champaign, Piatt, and Vermilion Counties. With the help of your jurisdiction leaders, fellow community members, and you, the MREA is able to spread the word of this awesome opportunity throughout your community!
How to Participate
Start by watching one of our free, virtual Geothermal Power Hours. In this hour-long presentation you’ll learn the basics of geothermal, how it can save you money, and how the geothermal group buy program works. You can register for any of our winter events by clicking on the date of your choice below.
Afterward, you can sign up for a free, no obligation site assessment and quote with this program’s contractor by filling out this short form.
The deadline to participate in this program is May 30, 2021, so don’t delay. Your geothermal journey awaits!
-
Weekly Update: BTWD and LTN dates finalized
Associated Project(s):All, Steadily picking up around here. Had to pull out the folding stands on a couple occasions. Got a new hire in the works. Dates are set for Light The Night and Bike To Work Day for the fall. On Friday we had a volunteer working towards a membership, which was a welcome occurrence.
This week is business as usual.
The numbers:
Visitors: 20
Sales: $1022.10
Bikes (refurb): 3 for $500
Memberships: 5 for $150
Misc: $58.50Thanks!
Jacob Benjamin
Manager, Campus Bike CenterEngagement SWATeam Meeting
Associated Project(s):On Monday, June 28, representatives of the Engagement SWATeam met to discuss some of the sustainability engagement resources identified at our previous meeting (June 9), prioritize recommendations to draft over the summer, and identify future projects to pursue. Meeting minutes attached below.
Attached Files:Bike Registration Signs: 6/26 meeting between Sarthak and Shayna
Associated Project(s):In today’s meeting, we discussed the email we received from ARC about location and size of our signs. We are sticking with the size we discussed earlier, 12x18, and the idea is to mount them on posts. However, that will have an additional cost so the range of signs and posts we can produce will be around 10-15. That will be enough to target our priority locations. Before the next meeting with the ARC on Tuesday, we have to finalize a map with the specific locations pinpointed with images. This map will be created by Sarthak Prasad because he will be using the Bike Census information.