- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):
Funding Award: Living Lab Platform for CIF geothermal
Associated Project(s):The SSC approved $9,318.16 in funding in Fall 2020 for a Living Lab Platform at the CIF. This project expires 12/16/2022.
Attached Files:App - A Living-lab Platform Based on the Campus Institutional Facility Geothermal Project.docx
Funding Letter - A Living-Lab Platform Based on the CIF Geothermal Project.pdf
Display & Budget Explanations.pdf
Site Permission Letter signed QK CO KM.pdf
Step_2_Additional_Information_John Zhao.docx
Step-2-Application_2020 _Zhao.docx
Step-2-Supplemental-Budget-and-Timeline_2020.xlsx
Sol Systems Blog about SEE Fellows student project
Associated Project(s):Sol Systems published a blog today sharing information about the collaborations with the UIUC Sustainability, Energy, and Environment Fellows program, the campus-wide minor in sustainability.
"This past week, two groups of students from the University of Illinois Urbana-Champaign presented to Sol Systems regarding their findings through the university’s sustainability minor capstone course. The students conducted an emissions audit for supply chain and land-usage for the university’s second utility-scale solar project, Solar Farm 2.0, a 54-acre, 12.3 MW dc system on the Urbana campus that is being developed by Sol Systems. The presentation and partnership served as part of Sol’s sustainability initiatives and acts as the foundation for building Sol’s framework for future and current solar project developments...."
Read the full post online at https://www.solsystems.com/groundwork-for-solar-sustainability/.
Weekly Update: WCIA interview, Kids bike giveaway
Associated Project(s):All, Last Monday WCIA came by the Bike Center and interviewed me for our Kids Bike Giveaway event. Made the evening news! We got one call from a woman in Tuscola, a man from Danville, and a woman emailed from Springfield, all referenced the news story.
Accordingly, we’re in full-on kids bike mode: student staff are fixing them, I’m fielding phone calls and emails, people are dropping them off nearly every day we’re open and sometimes even when we’re not.
I think we’re at around 20 bikes and we should probably get to 30 by week’s end between both shops.
This week we’ll continue prepping for the Bike Giveaway event, mostly logistical items like signage, set up, and keep fixing them.The numbers:
Visitors: 11Sales: $215
Bike (refurb): 1 for $160
Tires/tubes: 4 for $39
Thanks!Jacob Benjamin
Campus Bike Center ManagerRed Oak Rain Garden: November 2020 update
Associated Project(s):Please see attached November 2020 progress report for the Red Oak Rain Garden.
Attached Files:Weekly Update: Kids Bike Giveaway, WCIA interview
Associated Project(s):All, Last week was our first one with “regular” open hours again. I’d guess we had about the same number of people coming by as we did under our reservation system but it was certainly less leg work.
Our main push for the next few weeks will be our Kids Bike Giveaway. The particulars:
Date: Saturday, December 19th
Time: 1 – 3p or until we run out of bikes
Location: Urbana Bike Project (202 S Broadway Ave., Urbana)
Details: first come, first served; one bike per kid and they must be present to pick out their bike.We are still in need of donations but just through emailing our membership we’ve heard from 3 – 4 people with bikes to donate. WCIA is calling me later today to discuss, so hopefully we’ll get on the news. I’ve done lots of submitting to various media outlets. I’ll be focusing on getting the word out on the need for donations this week and focus on doing the bulk of the refurbishing next week. If successful TBP has expressed interest in making this an annual event. We’ll see!
The numbers:
Visitors: 6
Sales: $165.50Memberships: 2 for $60
Tires/tubes: 4 for $12Jacob Benjamin
Campus Bike Center ManagerThe Bike Project of Urbana-Champaign, in partnership with the U of I Campus Bike Center, is hosting a Kids’ Bike Giveaway this holiday season!
Associated Project(s):The Bike Project is currently accepting donations of all kids’ and teen bikes, regardless of condition, and then refurbishing them to give back to young folks in the community!
Donations can be made at the Urbana Bike Project (202 S. Broadway Ave., Urbana) or at the Campus Bike Center (51 E. Gregory Dr., Champaign).
Please call (217) 469-5126 or email contact@thebikeproject.org to arrange a donation.
Kids' Bike Giveaway Event:
Date: Saturday, December 19th, 2020
Time: 1 pm – 3pm or until we run out of bikes
Location: Urbana Bike Project (202 S. Broadway Ave., Urbana)Details: first come, first served; one bike per kid, and they must be present to pick out their bike.
All health and safety guidelines will be followed.
Solar Farm construction update for November 2020
Associated Project(s):F&S Management Engineer, Sushanth Girini, provided an update on the Solar Farm 2.0 construction progress. One key point is that 65% of the panel installation is complete as of 11/23.
Points regarding the progress:
- Currently the project is working on installing all the panels on the posts. As of Nov. 23, 2020, Sol Systems completed 258 out of 399 rows of panels, so approximately 65% of panel installation is complete.
- The pads have been poured and all major equipment placed (inverters and transformers), currently working on wiring the whole network. The mechanical in service (construction complete without inspection & commissioning) date is Dec 16th 2020 as per current schedule.
- Received all panels on site, racking equipment and all major equipment such as inverters and transformers, awaiting the switchgear delivery, which is due on 11/30.
- Working with U of I's F&S Waste Management team to achieve a zero waste goal for this project by recycling all the boxes and other materials.
- Every employee who works on site is checked for temperatures before entering the site as a safety precaution against covid-19.
Thank you,
Sushanth Girini
Weekly Update: Slowest week financially, Closing appointment system, New working hours
Associated Project(s):All, Maybe the slowest week on record, financially-speaking, as we grossed $8. Hopefully not a preview of the rest of the semester…
Before the break we did have a repeat visitor express interest in volunteering so there is some latent interest in our offerings.
This week we will be closing down our appointment system in favor of our regular open hours offerings. Visits have not been frequent enough to warrant the extra trouble of an appointment system. We’ll be open M/W/F for the rest of the semester, barring any further mitigation efforts.
We’ve got a few bikes from the warehouse to work on and they’ve already proven to be good teaching candidates for my staff on things like the irreparable damage kickstands can so easily inflict. No one likes leaning their bike against a wall just-so but it beats having to replace it entirely
Thanks!
The numbers:
Visitors:
Sales: $8!Jacob Benjamin
Campus Bike Center ManagerWeekly Update: Daily Illini interview, CTAC, post-Thanksgiving programming
Associated Project(s):All, Last week I was interviewed for the Daily Illini about the importance of bikes during a pandemic for health, safety, and exercise. No word on if they’re publishing the story.
Last week, I was also present for the Active Transportation Advisory Committee on campus to discuss infrastructure and developments for bus riding, biking, and walking. Great to see and meet—virtually—so many University people involved in implementing and promoting safer and healthier ways to get around campus and the community.
This week is business as usual: picking up bikes from the warehouse, staff meetings, and prepping for our post-Thanksgiving programming.
Thanks!
The numbers:
Visitors: 10
Sales: $99.50
Memberships: 1 for $30Tire/tube: 4 for $30
Misc: $34.50Jacob Benjamin
Campus Bike Center ManagerWeekly Update: Promote the Bike Center, bike pick up
Associated Project(s):All, Lovely summery weather last week!
Main event for the week was a marketing meeting to discuss new and innovative ways to promote the Bike Center, which was fruitful and really put into perspective how much stuff we do here at CBC when explaining it, even in general terms. And things like build-a-bikes vs. refurbished vs. DIY repairs will always confuse the uninitiated.
This week is business as usual. Bikes to be picked up from Parking, an Active Transportation Advisory Committee meeting, staff meetings to be scheduled, and so forth. Some suppliers seem to be restocked a bit on some much-needed bike parts but as we inch ever-closer to fall/winter, immediate demand for those parts will wane. But we’ll still stock up a bit.
The numbers:
Visitors: 12
Sales: $226.50
Bikes (refurb): 1 for $200
Misc: $26.50Thanks!
Jacob Benjamin
Campus Bike Center ManagerFall 2020: iSEE Quarterly Update (iQ)
Associated Project(s):The Fall 2020 iSEE Quarterly Update (iQ) was released with the following message from Madhu Khanna, the Interim Director of iSEE:
Dear Colleagues,
Attached, please find attached the Fall 2020 “iQ” – the quarterly update from the Institute for Sustainability, Energy, and Environment (iSEE).
It has been two months since I became interim director of ISEE. It has been exciting to see ISEE bring in multimillion-dollar research grants, launch a new research initiative in regenerative agriculture, and help coalesce sustainable agriculture research on our campus during this period.
Our Certificate in Environmental Writing has engaged students in making insightful contributions to a new issue of Q Magazine. We have also expanded our opportunities for education and scholarly discourse with several online events, including those on nuclear energy and geothermal energy research.
We formally launched the new Illinois Climate Action Plan (iCAP 2020) on Oct 20, 2020. This ambitious plan is the result of the hard work of campus sustainability folks who worked hand-in-hand with Facilities & Services and incorporated the vision of hundreds of students, faculty, staff, administrators, and community members into a plan for the next five years and beyond — all the way to carbon neutrality no later than 2050!
I am so grateful to Evan Delucia for his efforts over the first seven years as the first director of our Institute. He has left iSEE as a vibrant part of the Illinois community, and I am working with our outstanding ISEE staff to expand upon the work already begun — as evidenced in this six-page update.
Please take a quick look at those updates and more in “iQ.” For more regular news, please sign up for our E-newsletter at https://illinois.edu/fb/sec/5031776.
Wishing you a successful end to the fall semester,
Madhu
Attached Files:Weekly Update: Moving bikes from warehouse; Traffic safety
Associated Project(s):All, Slow week again. Grabbed a few more bikes from the warehouse. I’ve been given clearance to remove all the remaining bikes, so I’ll be doing that in small doses for the rest of the semester. I’ll bring some of my staff along to help. Moving bikes around is a lot easier for college-aged kids anyway.
I spoke with a UIPD officer last week about traffic safety after I had some close encounters with vehicles on campus. We’ve tentatively planned to do a meet and greet/talk next semester with my staff and UIPD to cover road safety on campus. It’ll be great to have the ear of enforcement on cycling issues and in the end, be better cycling advocates to the community.
Numbers:
Visitors: 6
Sales: $228.00
Memberships: 1 for $60
Bike Sales (refurb): 1 for $160
Misc parts: 2 for $8Thanks!
Jacob Benjamin
Campus Bike Center ManagerF&S Executive Director Dr. Mohamed Attalla talks Solar Farm 2.0 on The Solar Podcast
Associated Project(s):Dr. Mohamed Attalla, the Executive Director of Facilities and Services, recently spoke on the Solar Podcast about the progress made at the University of Illinois in regards to green energy with the addition of Solar Farm 2.0. Dr. Mohamed Attalla was alongside Pedro De La Barra, the Project Manager for Sol Systems, as they discussed the working relationship between the University and those at Sol Systems. Solar Farm 2.0 is expected to be producing solar energy in early 2021.
Please see the link below to listen to this podcast!
https://fs.illinois.edu/resources/newsroom/2020/10/28/podcast-dr.-attalla-joins-the-solar-podcast
FY20 Green Power Partnership renewed
Associated Project(s):F&S has renewed our campus' recognition as a Green Power Partner for FY20 through the Environmental Protection Agency. This voluntary program promotes the use of green power, and the combined supply for the Champaign-Urbana campus during FY20 was 7.2% of the total electricity usage.
Please see the attached file to see a more in-depth look at the green power supplied and generated on campus
Attached Files:Weekly Update: Abandoned bicycles, Working bikes
Associated Project(s):All,
Pretty slow week. Had the iCAP sustainability celebration on Tuesday, which was great. Always fun to see/hear from other parts of campus that are working towards a better future for our campus. On the flipside, I had the displeasure of reporting a dangerous F&S driver that same day and then a dangerous MTD driver on Thursday.
Todd came by and cleared out scrap on Friday which was welcomed.
As of this morning, I communicated with Working Bikes that we will not be doing our annual abandoned bike donation as Parking did not collect bikes last spring, due to COVID, and thus we have no bikes to donate to them. It hasn’t been decided/communicated whether Parking will collect later in the fall/winter or wait until spring. This will also negatively affect how many bikes we’ll have for sale next spring, as the pool of available bikes is lower. But of course, most of the abandoned bikes were being donated and for sale numbers were always more dependent on our ability/time to build more than a dearth of bikes.The numbers:
Visitors: 11 (7 UIUC-affiliated)
Sales: $225
Memberships: 4 for $120
Misc parts: 8 for $55Thanks!
Jacob Benjamin
Campus Bike Center ManagerLink to planting brochures
October 2020 construction progress
Associated Project(s):For this month's progress, the fence has been installed and the statistics are as follows:
191 rows with motors and partial torque tubes.
103 with all torque tubes and ready for panels.
79 rows of panels.
These numbers are included in each other, i.e., the 103 is included in the 191 and the 79 is included in the 103.
Thank you,
Sushanth Girini
Management Engineer,
Facilities & Services,
UES-Utility Distribution, UIUCWeekly Update: Abandoned bicycles, Sustainability Celebration
Associated Project(s):All,
Mike, a semi-regular at the old shop, walked in on Friday for his appointment, looked around and said, “What’d you have to do to get upgraded to such a nice spot?”
Just another positive review of our new space.
I coordinated with Parking to do more frequent pick ups—but smaller loads—of abandoned bikes, which should allow for a better flow of bikes in and out of the bike center. This should be more manageable for myself and my staff going forward, as well.This week is a Campus Sustainability Celebration on Tuesday, a CBC staff meeting Wednesday evening, and warm weather to close out the week, which usually equals some more traffic, but we’ll see if that holds during a pandemic.
The numbers:
Visitors: 14
Sales: $178.20
Memberships: 4 for $120
Misc parts: 4 for $40Jacob Benjamin
Campus Bike Center ManagerSolar Farm 2.0 in F&S Quarterly Report
Associated Project(s):SOLAR FARM 2.0 CONSTRUCTION UNDERWAY
Construction started on the University of Illinois at Urbana- Champaign’s Solar Farm 2.0 in August, with a commercial operation date expected for early 2021. The new 54-acre, 12.1 megawatt (MWdc) solar array is located north of Curtis Road, between First Street and U.S. Route 45, next to the Village of Savoy. Once completed, the solar farm will produce 20,000 MWh annually, almost tripling the university’s existing on-site renewable energy generation. Through a combination of utility-scale installations, integrated facility rooftop arrays, and wind power purchase agreements, clean power usage at the U of I will increase to more than 52,000 MWh per year, which is over 10 percent of the campus electrical demand. Faculty have already identified research projects that will use the Solar Farm 2.0 installation, primarily related to the pollinator-supportive plants under and around the panels.