You are here

Project Updates for collection: Renewable Energy Projects

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. EGen SWATeam Meeting Minutes

    The Energy Generation, Purchasing, & Distribution SWATeam met for the first time of the FY2017 on September 21. They revised their focus topics for the year and reviewed progress on current projects, such as on the rooftop solars on the Electrical and Computer Engineering Building, the Speech and Hearing Building, and the Business and Instruction Facility. Finally, EGen also discussed the possibility of building a second solar farm in order to further meet iCap goals. 

    Attached Files: 
  2. discussion to add solar PVs at Idea Garden Shed

    Associated Project(s): 

    The Idea Garden committee, with the UI Extension, continues discussions about adding rooftop solar to the Arboretum Garden Shed hear the Idea Garden.  Last year, Idea Garden representatives worked with Masters of Energy Systems students to consider potential design plans.  The final scope of the desired solar PV project is still to be determined. One likely option is to use solar to power the light in the shed, and use the existing campus electrical grid to provide other power needs, such as winter heating.

  3. 2009 Gable House moved

    Associated Project(s): 

    Student Sustainability Committee and the School of Architecture worked with F&S to move the 2009 Solar Decathlon House from I Hotel grounds, where it was located for seven years. The house moved to the Energy Bioscience Research Farm on Race Street south of Windsor Road. The 695-square foot building, weighing more than 50,000 pounds, was designed by University of Illinois students and took second place in the U.S Department of Energy’s 2009 Solar Decathlon. Since then it has been used by various campus units, who study the design and construction of the building.

  4. EGen006 Petascale Offsets recommendation - Transmittal

    Following the completion of iWG assessment, this recommendation was transmitted to the Vice Chancellor for Research (VCR).

    For future updates, please refer to PPA for National Petascale Computing Facility.

    See iWG assessment of EGen006 Petascale Offsets here.

    See SWATeam recommendation EGen006 Petascale Offsets here.

  5. March 2017 Sustainability Council Recommendations Approved

  6. EGen003 PPA term recommendation - Successful

    Following the completion of the iWG Assessment, the EGen003 PPA Term recommendation was discussed at the Sustainability Council meeting in March 2017.  In June 2017, Provost Wilkins said, "On behalf of the Chancellor, I'm writing to convey approval of the recommendations. Please do begin encouraging action on the items mentioned. Thank you and the rest of the Council for the diligent and forward-looking thinking on these items."

    Regarding the EGen003 PPA Term, the next steps are "When the next RFP for a clean energy PPA is planned, seek campus / system approval to request pricing for both a 10 year agreement and a 20 year agreement, through Prairieland Energy, Inc."

    See Sustainability Council approvals here.

    See transmittal of EGen003 PPA Term here. 

    See iWG Assessment of EGen003 PPA Term here.

    See SWATeam recommendation EGen003 PPA Term here.

    For future updates on this topic, please see Power Purchase Agreements for Clean Energy

  7. BIF Solar Installation Agreement

    A strategic goal of both the UIUC and the College of Business is to attract and attain the best faculty. In order to do that, it is essential to provide faculty with office space that allows them maximum productivity. The fourth floor of BIF has proven to be excellent space where faculty can work on research. The fourth floor faculty offices are highly sought after by research faculty due to quality of space, location, convenience, and security. As the College expands the fourth floor to include sixteen new offices, there is an opportunity to include a PV solar panel system. The Student Sustainability Committee has agreed to fund $60,000 toward the total initial cost of $157,340 to fully fund all $48,000 of direct construction and equipment cost for a 12.5 kW array as well as $12,000 in general conditions and contingency. Any other costs will be funded through the College of Business. This proposal directly funds: 1) Solar panels and inverters 2) Limited installation costs 3) Some contingency and general conditions.

  8. Funding Letter - Geothermal TRT

    The applied for funding will be used in the construction of a Thermal Response Test unit for use in the Geothermal Pilot project that is currently being implemented on the UIUC Campus. The overall goal of the project is to assess the viability of geothermal heat exchange on this campus as well as the best implementation of this technology. The Thermal response test unit will measure the ability of the local geology to support geothermal heat exchange in the future. The unit will be designed to be used in all future geothermal projects. This project is student-led, and development and construction of the Thermal Response Test Unit will be conducted entirely by University of Illinois students. This proposal directly funds: 1) Construction Supplies 2) Transportation Costs.

  9. Biomass Boiler Open House

    Associated Project(s): 

    REMINDER: The Energy Farm at Illinois and the Institute for Sustainability, Energy, and Environment (iSEE) invite you to attend:

    Illinois Energy Farm Open House 
    & Biomass Boiler Ribbon Cutting

    1-3 p.m.

    Wednesday, June 21, 2017

    Illinois Energy Farm 
    (4110 S. Race St., Urbana)

     

    DSC_0224.jpeg
    In celebration of the completed installation of the Farm's state-of-the-art Heizomat biomass boiler, we invite you to tour the newly-built boiler facilities and meet Heizomat representatives.

    Refreshments will be served. Please let us know you are coming so we can plan accordingly!

    Click here to RSVP today!!

Pages