You are here

Project Updates for collection: Renewable Energy Projects

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. BIF Solar Installation Agreement

    A strategic goal of both the UIUC and the College of Business is to attract and attain the best faculty. In order to do that, it is essential to provide faculty with office space that allows them maximum productivity. The fourth floor of BIF has proven to be excellent space where faculty can work on research. The fourth floor faculty offices are highly sought after by research faculty due to quality of space, location, convenience, and security. As the College expands the fourth floor to include sixteen new offices, there is an opportunity to include a PV solar panel system. The Student Sustainability Committee has agreed to fund $60,000 toward the total initial cost of $157,340 to fully fund all $48,000 of direct construction and equipment cost for a 12.5 kW array as well as $12,000 in general conditions and contingency. Any other costs will be funded through the College of Business. This proposal directly funds: 1) Solar panels and inverters 2) Limited installation costs 3) Some contingency and general conditions.

  2. Funding Letter - Geothermal TRT

    The applied for funding will be used in the construction of a Thermal Response Test unit for use in the Geothermal Pilot project that is currently being implemented on the UIUC Campus. The overall goal of the project is to assess the viability of geothermal heat exchange on this campus as well as the best implementation of this technology. The Thermal response test unit will measure the ability of the local geology to support geothermal heat exchange in the future. The unit will be designed to be used in all future geothermal projects. This project is student-led, and development and construction of the Thermal Response Test Unit will be conducted entirely by University of Illinois students. This proposal directly funds: 1) Construction Supplies 2) Transportation Costs.

  3. Biomass Boiler Open House

    Associated Project(s): 

    REMINDER: The Energy Farm at Illinois and the Institute for Sustainability, Energy, and Environment (iSEE) invite you to attend:

    Illinois Energy Farm Open House 
    & Biomass Boiler Ribbon Cutting

    1-3 p.m.

    Wednesday, June 21, 2017

    Illinois Energy Farm 
    (4110 S. Race St., Urbana)

     

    DSC_0224.jpeg
    In celebration of the completed installation of the Farm's state-of-the-art Heizomat biomass boiler, we invite you to tour the newly-built boiler facilities and meet Heizomat representatives.

    Refreshments will be served. Please let us know you are coming so we can plan accordingly!

    Click here to RSVP today!!

  4. ENVS 301 students' presentations

  5. Phase Two Rates - UC Solar

    The Midwest Renewable Energy Association (MREA) has accepted the Solar Urbana-Champaign Advisory Committee’s recommendation and contracted with New Prairie Construction to install solar arrays for the second round of our group buy program.  MREA and New Prairie Construction have agreed to an amended fee schedule whereby New Prairie will be providing a rebate which will be paid to program participants who sign a contract for services by August 31, 2017 according to the following schedule: $.03/watt if the program reaches 50-150 kW of total capacity; $.06/watt for 150-250 kW; $.09/watt for installed capacity in excess of 250 kW. 

    Please keep an eye on solarurbanachampaign.com for more info.

  6. eGen007 recommendation for second solar farm

    Attached is a recommendation submitted by the EGEN SWATeam for consideration. We believe this recommendation will advance sustainability goals set forth by the 2015 iCAP.

    The EGEN SWATeam appreciates any feedback resulting from consideration of this recommendation.

  7. EGen007 Solar Farm 2.0 recommendation - Submittal

    The eGen SWATeam submitted a recommendation to the iWG stating, "Start a project to expand the existing Solar farm, or install a new large scale solar installation in a new location."

    See attached the SWATeam recommendation EGen007 Solar Farm 2.0 complete with comments from all the eGen SWATeam members.

  8. Morgan Johnston speaks to Parkland Board of Trustees

    In support of installing solar PVs at Parkland College, Morgan Johnston spoke to the Parkland College Board of Trustees, as requested by their VP of Institutional Advancement and Sustainability Coordinator.  Ms. Johnston shared the benefits and lessons learned from the university's solar farm installation.

  9. March 2017 Sustainability Council Recommendations & Next Steps

    Director of iSEE, Evan DeLucia, summarized three recommendations presented at the March 2017 Sustainability Council meeting: EGen005 Rooftop Solar Standard, EGen003 Power Purchase Agreement (PPA) Timeline, and ECons003 Conservation Budget, as well as the next steps, for Chancellor Jones’ approval.

    We followed up with the Sustainability Council on April 25, 2017, with the attached file.

    See Transmittal of EGen005 Rooftop Solar Standards here.

    See iWG Assessment for SWATeam recommendation EGen005 Rooftop Solar Standard here.

    See SWATeam recommendation EGen005 Rooftop Solar Standards here.

    See Transmittal of EGen003 PPA term to the Sustainability Council here.

    See iWG Assessment of EGen003 PPA Term here.

    See SWATeam recommendation EGen003 PPA Term here.

    See Transmittal of ECONS003 Conservation Budget to the Provost Office

    See iWG Assessment of ECONS003 Conservation Budget

    ee SWATeam Recommendation of ECONS003 Conservation Budget

     

  10. EGEN SWATeam Meeting (4.13.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Ximing Cai's [in attendance] vision for iSEE and SWATeams
    • Developing a recommendation to expand UIUC solar farm.
    • Developing a recommendation for another clean energy PPA
    • Cost savings for geothermal systems and opportunities for implementation at solar farm and new building sites

Pages