You are here

Project Updates for collection: Bicycle Related Projects

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Armory Avenue bike path: Estimate from F&S Construction Services

    Associated Project(s): 

    Here is the initial rough estimate for the Armory Avenue bike path for the section by Gregory Hall:

    • Remove tree roots and bushes  $4,000
    • Remove Erns and remove bases  $8,000
    • remove walks and new dirt  $6,000
    • replace concrete  $32,000
    • $50,000 total

    The cost of landscaping is not included in this estimate. We will be using the SSC funds available + the bike fee money for this bike path section.

  2. Bicycle Registration is available now!

    Bicycle Registration was open for public on July 20, 2020. Currently due to the pandemic, all Shield pick-up locations are closed, so for those who register and want the 529 Shield now, they must contact bike@illinois.edu to arrange for a time and place to collect the Shield. Otherwise, Sarthak Prasad would reach out to them when the Shield pick-up locations are open.

  3. Spring 2020 Project Deliverables

    Final Project Deliverables for Spring 2020

    There were 7 projects completed by the WIE-GFX Abroad Scholars in the Spring 2020 semester of ENG 177

    1. Armory Bike Path Restoration
    2. Study Abroad Carbon Offset
    3. Electric Vehicle Charging Stations
    4. AASHE STARS Report 2020
    5. Food Waste
    6. Sustainability Best Practices Guide
    7. EPA SmartWay Program
  4. SSC Final Report: Bike Path Renovation: Armory Avenue Path South of Gregory Hall

    The construction on the path began in summer 2020 and was completed by the time students returned to campus. The old bike paths, along with hedges, overgrown evergreens, and decorative urns were removed from the area. A new 6 foot wide path was constructed and plans have been made to restore the landscape as needed. The Armory Avenue bike path is now open to use!

    This project tied in with the renovation of the entire Armory Ave bike path that connects the bike lane on Armory Ave to the bike lane on Goodwin Ave. This bike path goes through the Gregory Hall, Foellinger Auditorium, Smith Hall, IGB, and Bevier Hall.

    Please see attached the final report for this project.

    See the previous update for this project.

  5. Bicycle Registration page updated

    The bicycle registration page on the Bike at Illinois (bike.illinois.edu) to reflect the new changes. The new system will be available to the public from July 20, 2020. This page now contains information about the importance of registration, new bicycle registration system, how to register, and the 529 Shield (registration tag) pick up locations. Due to the pandemic, all the Shield pick-up locations were closed.

    Learn more and how to Register Your Bicycle here.

    Learn about the Benefits of registering your bicycle here.

  6. Puchase Order approved - Project 529

    The Purchase Order to purchase the Community-Plan of the Project 529's bicycle registration system was approved and the contract was sent to the vendor via email (due to the pandemic) on May 1, 2020. The contract would begin on July 1, 2020 and end on June 30, 2021. Sarthak Prasad will work with the F&S IT department to plan and prepare to use the new system and the bicycle registration fee.

    The trial period for the Project 529 system will end on June 30, 2020.

  7. SSC Funding Award: Bike Path Renovation: Armory Avenue Path South of Gregory Hall

    The SSC awarded $50,000 for the "Bike Path Renovation: Armory Avenue Path South of Gregory Hall". This award will expire on May, 2022. Please see attached the Funding agreement.

  8. Car Culture and Climate Change: A Student Op-Ed

    Associated Project(s): 

     

    ui-parking.png

    Student Op-Ed: Car Culture and Climate Change

    In this opinion piece, undergraduate Shelby Job uses the U of I as a case study to examine the impact of efforts to limit automobile use and enourage biking, walking and public transit on America's "car culture" — especially in lower- and middle-class communities. 

    "Although the campus’ lack of accessibility by automobile might feel like a constraint on individual freedom, using infrastructure to encourage active modes of transportation may be the way forward as we search for solutions to the climate crisis," Job writes.

    But higher parking rates and the scarcity of parking overall raise the question of whether manipulating road systems will lead to a car culture that is only accessible to socioeconomic elites, she writes. "If municipalities begin to restrict auto travel by cutting down on the amount of affordable parking, then the face of an area's car culture is likely to change in a way that excludes those of lower socioeconomic standing."

    The op-ed was originally written for a course in iSEE's Certificate in Environmental Writing (CEW

  9. Trans010 Mode Switch Survey - Successful

    The Transportation SWATeam made the recommendation below, which was transmitted to iSEE and approved at an iSEE Management Meeting. Meredith Moore is in communication with Julie Cidell regarding moving forward with this initiative. 

    "The Transportation SWATeam kindly requests the creation of a survey which would question faculty and staff who travel out of town for conferences or other university-sponsored activities on their decided mode of transportation. This survey would be voluntary and facilitated by the Transportation SWATeam. An example of a question would be something like: 'In the past year, what has been the main reason for the travel you selected?'"

    See the submittal of Trans010 Mode Switch Survey here.

    See the recommendation for the Trans010 Mode Switch Survey here. 

    For future updates, see the Reduce Driving on Campus project here.

Pages