  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Final Check

    Associated Project(s): 

    On September 18th, the organizing team met to finalize the tasks before the event. We discussed the bike rack on bus demonstration, volunteer update, and some remaining tasks in the to-do list in the LTN google drive. We decided to meet once more before the meeting on Wednesday.

    Confirmed 37 Volunteer  submissions, 6 police officers will be present for the duration of the event (2 at each location), and 2 Wellness Ambassadors at each locations to talk about the current situation and the need for precaution (they will also handout safety information packets including masks). Gabe confirmed that 2 representatives from Census 2020 could join each location as well.

    Campus Rec and iSEE will provide some water bottles to be handed out to the volunteers who dont have one. DIA will provide 6 Gatorade containers for water refills for volunteers only. Stacey and Sarthak will fill them up with ice and water and deliver them to the three locations.

    We discussed the table setup, how to organize the lines, and the assignments for the volunteers. All volunteers were sent the Safety Plan and Warning and Waiver Form on Wednesday, September 23, 2020. Sarthak and Stacey will drop off the lights and merchandize at each location by 3 pm.

    All tables and chairs will be delivered by 3 pm. Sarthak and Stacey will arrange the tables at 3 pm at Hallene Gateway and Alma Mater location. Sarthak will print out numbers for each table/volunteer station, list of volunteers for each location, etc.

  2. Design Constraint discussion with F&S and Researchers

    F&S staff met with the researchers to discuss the design constraints for installing the tensengrity structure for bike parking at Newmark Civil Engineering Lab (NCEL).  Dr. Ann Scychterz and Dr. Nishant Garg at CEE met with Stacey DeLorenzo, Brent, Lewis, Sarthak Prasad, and Morgan White from F&S on 9/22/2020. We discussed a few design constraints, such as staying out of the tree lines and height requirements for the proposed structure.  We also discussed the potential lifetime of the structure, various design shape options that may be incorporated, material selections, and maintenance plans.  The faculty will contact F&S again in early December.

  3. Digital signs posted

    Associated Project(s): 

    Digital Signs were posted to the following locations from 9/18/20 to 9/24/20:

    1. Illini Union and Bookstore
    2. Campus Residence Halls and Dining Halls
    3. F&S
    4. BIF
    5. Campus Rec
    6. Beckman
    7. Architecture Building (FAA)
    8. Chez Wounded Veterans Center
    9. Coble Hall- Graduate College
    10. Law Building
    11. CSL
    12. DCL
    13. ECE
    14. Engineering Hall
    15. Foellinger Auditorium
    16. Huff Hall
    17. Industrial and Enterprise Systems Engineering building
    18. Loomis Laboratory
    19. Material Science and Engineering (MSEB)
    20. Micro + Nanotechnology laboratory
    21. Newmark Civil Engineering Laboratory
    22. Siebel Center
    23. Talbot Laboratory
    24. Vet Med Basic Sciences Building
    25. Vet Med Teaching Hospital
    26. EnterpriseWorks at Research Park
  4. Tables, chairs, and hand sanitizers for all three locations

    Associated Project(s): 

    The work order was approved (WO #10813200) to place 7 tables, 15 chairs, 2 Hand sanitizer stations, 2 recycling bins for each of the following three locations:

    1. Alma Mater Plaza (intersection of Green and Wright St)
    2. Hallene Gateway (SW corner of Lincoln Ave and Illinois St)
    3. Campus Bike Center (51 E Gregory Drive, Champaign, IL)
  5. F&S announcement and Press Release: U of I Joins National Bicycle Registration System

    Associated Project(s): 

    On September 1, 2020, the Facilities & Services Communications team published and announcement on the F&S website about the transition of UIUC's old bicycle registration system to a national bike registration system through Project 529. The announcement can be found here: https://fs.illinois.edu/resources/newsroom/2020/09/01/u-of-i-joins-natio...

    The F&S Communication team also sent out the press release for this change on September 1 evening. A pdf of this press release is also attached.

  6. LTN: Lawn Signs

    Associated Project(s): 

    The Lawn Signs were approved by Kristin McMurray on September 1, 2020. The Lawn Signs will be placed at 15 pre-determined locations on-campus from September 17th to September 24th (removed right after the event).

    The work order was approved to create the Lawn Signs on August 31, 2020 (WO #10811551).

  7. Lawn Signs

    Associated Project(s): 

    The Lawn Signs were approved by Kristin McMurray on September 1, 2020. The Lawn Signs will be placed at 15 pre-determined locations on-campus from September 17th to October 17th.

    The work order was approved to create the Lawn Signs on August 31, 2020 (WO #10811593).