You are here

Projects Updates for theme: Transportation

  1. Eco-Visio Overview

    Associated Project(s): 

    Sarthak gave an overview of Eco-Visio to Hrushikesh on 07/05/2023, to accommodate future count procuring tasks. We went through different options of data that can be collected for analyzing purposes.

  2. Biweekly Family Friendly Kickapoo Rail Trail Ride!

    Associated Project(s): 

    This Friday is the date for the next Family Friendly Ride on the KRT.

    The ride departs from the Urbana Walmart KRT Trailhead at 6:05pm.

    Additional details on the attached.

    This is a very informal ride with no set pace or distance.  All are welcome!  Please spread the word.  Hope to see you there!

  3. Weekly Update: Bike Repair Stations, Parade for 4th of July

    Associated Project(s): 

    All, Last week was the TBP member meeting, which I attended. A new bike fix-it station/pump was installed here at the Bike Center, as well. It is much more compact than the previous iteration and the pump is much more robust; hopefully, it’ll provide years of trouble-free service.

    Tomorrow is the 4th of July and Champaign County Bikes will be riding bikes in the parade, so I’ll mention that to folks today. Otherwise, looks to be a slow week.

    The numbers:

    Visitors: 23
    Sales: $798.50
    Bikes (refurb): 1 for $140
    Bikes (B-a-B): 1 for $60
    Memberships: 6 for $180
    Tires/tubes: 6 for $54

    Jacob Benjamin
    Campus Bike Center Coordinator

  4. Bike Class Form requests in FY23

    In FY23, we have received several bike class requests through the Bike Class Form on the Bike at Illinois website: https://bike.illinois.edu/safety/bike-classes/. We will organize classes in FY24 based on this data:

    Bike Class Form requests in FY23
    Bike class number of requests
    Learn How to Ride 8
    Youth Cycling Instructor 2
    Smart Cycling 7
    Traffic Skills 101 5
    League Cycling Instructor 1
    Bike Commuting: Lunch and Learn 5
    Winter Bicycling: Lunch and Learn 2
    Campus Bicycle Resource Tour 1

     

  5. Contract renewed for Project 529 for FY24

    Associated Project(s): 

    The contract with Project 529 was renewed to continue our partnership in the FY24. This will allow our students, faculty, staff, and community members access to a national bicycle registration system.

    The contract was signed by Project 529 on 6/27/2023 and it was submitted to Contracts+ for UIUC signatures.

  6. Digital signage for Summer Bicycle Roundup

    Attached digital signs was shared with several departments on campus with the following message:

    F&S is in the process of removing all abandoned bicycles left on campus over the summer. All bicycles on campus property have been tagged with an orange sticker. If a bicycle still has this sticker by July 5, it will be considered abandoned and subsequently impounded. Bicyclists must remove this tag from their bicycle to keep it active and to avoid impound.

    This sign was posted on 6/22/2023 until 7/14/2023 at the following departments:

    • Illini Union and Bookstore
    • F&S
    • BIF
    • Campus Recreation
    • Beckman
    • Architecture Building (FAA)
    • Law Building
    • CSL
    • DCL
    • ECE
    • Engineering Hall
    • IESB
    • Labor and Employee Relations
    • Loomis Laboratory
    • MSEB
    • Micro + Nanotechnology laboratory
    • NCSA
    • Newmark Civil Engineering Laboratory
    • Siebel Center
    • Vet Med
    • CIF
    • Research Park
    Attached Files: 
  7. Explained the Campus Bike Plan update project to students

    Sarthak met with Hrushikesh Chavan (Master of Architecture student) and Nathaniel Nevins (Bachelors in Landscape Architecture) separately to explain the Campus Bike Plan 2024 update. These students will read up the 2014 Campus Bike Plan, the progress reports, and other documents shared with them to learn more and recommend suggestions for this new Plan.

  8. 4 new EVs and new EV charging stations installed

    F&S has received 4 new Ford F-150 Lightnings all electric trucks, bringing the total to 6 Ford Lightnings and 1 Ford e-Transit cargo van for F&S fleet.

    We have also installed another level-2 Ford dual point smart chargers on the south side of PPSB and we are working on the installation on another one. We have 2 more chargers to install. The Charging Stations installations are being done using the SSC funding.

  9. June 2023 SmartWay posts

    Associated Project(s): 

    Using the #EPASmartWay logo helps differentiate your company from the competition. Be sure to let your customers and stakeholders know that you’re leading the way on clean, sustainable supply chain management. Learn more: epa.gov/smartway

  10. Weekly update: Donations, Illini4K

    Associated Project(s): 

    All, Pretty chill week overall. Great weather but not very busy. Got some donations from Champaign Cycle last Tuesday.

    One student worker that just graduated did a bike trip down the western border of Illinois last week and is headed to Iceland for another biking trip tomorrow. He bike-commutes and also did I4K. Great to see folks explore all the different ways to have fun with a bike.

    Another student worker is scaling back here as they were offered more hours at Champaign Cycle. Always good to see staff move on to bigger and better things.

    Thanks to Todd for grabbing scrap over the long weekend.

    The numbers:

    Visitors: 28
    Sales: $904.42
    Bikes (refurb): 2 for $360
    Memberships: 9 for $270
    Tire/tubes: 7 for $44

    Thanks!

    Jacob Benjamin
    Campus Bike Center Coordinator

  11. EV support call with Phil Krein

    Sarthak and Morgan met with Phil Krein to talk about the EV charging support on campus. See attached the powerpoint slides that Phil shared. Following are some talking points:

    • Include Phil Krein to the EV steering committee meeting
    • Type-1 chargers – cheap and better for our campus needs
    • Schedule a meeting with only Maria, MW, and Stacey
    • Morgan will talk to Lowa about why Parking prefers Level-2 chargers
    • Talk to Utilities, which parking infrastructure is the healthiest to support the level-1 chargers and then talk to SSC if we can pilot it.

    See the meeting recording here: https://uofi.box.com/s/o462lbl362rpw9p7jvoet8cmqsgxf7x6

Pages