You are here

Project Updates search results

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. ZW004 Recommendation Update

    Beckman currently uses reusable trays, plates, and glasses in their cafe. They currently have a dishwasher onsite and will have a larger one in the new project (U22005 Beckman Café Renovation). They also have a stack of plastic and Styrofoam containers on the line as people move through the food ordering line, so improvements could be made here to nudge people towards the reusable options.

  2. Education iCAP Team April Meeting

    Education iCAP Team had its virtual April meeting on Monday, April 3rd, at 4 PM. Anna Mehl gave updates on Sustainability Economic Analysis project and talked about possible next steps. Afterward, the team discussed sustainability workshop recommendation idea, brainstorming aspects of a potential sustainability workshop/training for incoming students. Meeting minutes are attached. 

  3. WPP Building 1258 geothermal metering system installation request

    Associated Project(s): 

    Good morning,

    Here is what I found.

    Al

     

    --------------------

    Hi Robbie,

     

    Here are the engineering documents and pictures of the heat pumps. There are 5 heat pumps.

     

    Andy

    -------------------

    Team,

     

    Here's another geothermal system needing to be metered. It appears to need both ST, RT temperature RTD, and flow meter installation and tied into alpha controller and programming. 

     

    Thanks.

     

    Robbie Bauer

    ----------------------------

    Andrew,

     

    The team surveyed it this week and a meter is planned to be installed shortly.  I’ll keep you updated.

    -----------------------------

    Hi Yu-Feng,

     

    Robbie Bauer from F&S is finishing the meter install on the last geothermal system on campus. So going forward we will have access to data from all the systems. At the very least, inlet and outlet temperature, flow rate, and energy going into the borefield will be collected. Robbie is interested in calculating the annual energy avoidance for each system.

     

    Best,

    Andy

    ----------------------

    Thanks for the update.

     

    Yu-Feng

  4. UIUC/CUMTD for faculty and staff commuting

    Associated Project(s): 

    Hello Sarthak!

     

    Our VC for administrative has asked me to compile examples of University-subsidized public transit for faculty and staff commuting. I’m familiar with UIUC’s free transit for students, faculty, and staff. I believe students pay a fee each semester, and transit is a free benefit for faculty and staff.

     

    Is there a formal agreement in place between CUMTD and UIUC I can reference, or a budgeting policy? I’m specifically interested in any costs to UIUC and whether that expense funded entirely from the student fee or subsidized elsewhere in the budget.

     

    This is somewhat time sensitive, let me know if you have time for a quick call this afternoon or Monday.

     

    Best,

     

    Matt Rundquist

    ----------------------------

    Hi Stacey,

     

    For UIUC faculty and staff, there is a department that funds for the MTD bus pass, right? Could you please confirm? Thank you,
    Sarthak

  5. Weekly capstone meetings: Meeting from 3/29 and 4/5

    Meeting from 4/5/2023

    Summary: Ethan and Sarthak met via zoom where they discussed the work on the plan that Ethan has done so far. They also discussed the thorough plan for the next year to describe to the stakeholders, in regard to their involvement with the 2024 plan. Ethan is expected to respond to stakeholders by next week, add onto the plan (mainly the executive summary, goals & objectives, introduction, and planning process sections). Ethan will send Sarthak separate emails about his Urban Planning presentation on their work for school, and request for GIS information.

    Meeting from 3/29/2023

    Summary: Ethan and Sarthak met briefly via zoom (Ethan was out of town dealing with a family emergency so there was not much to discuss). Ethan is expected to make a Google Sheet with stakeholders' information and responses, a sheet of timeline for the planning process, and a document for the 2024 plan.

  6. Professor Yu-Feng Lin Featured on 'Wired' Article

    Associated Project(s): 

    UIUC's Yu-Feng Lin was featured on a "wired" article. Andrew Stumpf explains, "The authors did a simulation for a residential district in Chicago. They don’t provide much detail about the geology and hydrogeology that is the basis for the geotechnical model. In Chicago, aquifer thermal energy storage (ATES) has yet to be used because groundwater is pretty scarce in the shallow subsurface and one would need to tap aquifers deeper in the bedrock. In the northern and western suburbs, the subsurface conditions in the glacial deposits is much better and I believe Kane County is looking into using the aquifers for a geothermal resource."

    The article can be found at: https://www.wired.com/story/the-massive-batteries-hidden-beneath-your-fe...

    UIUC newsletter: https://emails.illinois.edu/newsletter/32/64507332.html 

    The referenced article is attached.

  7. Zero Waste Coordinator presented to FAA330 class

    Associated Project(s): 

    Presented an opportunity to beautify the south wall of the Waste Transfer Station. Karin Hodgin Jones, Sustainable Design Program Coordinator, will assist with coordinating students over the fall and summer to design a request for proposals (RFP) for student teams to submit designs.

  8. LED Lighting

    Associated Project(s): 

    Hi James,

    I am working with facilities in your area to help them upgrade to LED lighting which reduces their overall costs and improves sustainability. Right now, there are very attractive incentives from the energy companies to retrofit lighting which improves the ROI on the project. In many cases, CES can do upgrades without any capital investment and still deliver significant monthly cost savings.

     

    If you have not fully converted to LED lighting, could you let me know when works for you for me to come in and give you a free proposal? If you're not the correct contact within your organization, can you please point me in the right direction? If your facility is already all LED, please let me know as well.

     

    Thank you,

     

    MATT GAROFALO

    ---------------------------

    fyi

    Jim Sims

Pages