Projects Updates for Install Public Use Electric Vehicle (EV) Charging Stations

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.

Pages

  1. Transportation iCAP Team Meeting 12/2/22

    The transportation iCAP team met on Friday, December 2nd at 3:00 P.M. CST to discuss electric vehicle charging, and updates on bike shelter procurement for the university. Due to a software error, the meeting minutes were not recorded.

    Link to meeting recording: https://mediaspace.illinois.edu/media/t/1_u3g573fb

  2. Sarthak met with Gabe Lewis to talk about Electric Vehicles and EV charging

    On May 24, Sarthak Prasad met with Gabe Lewis to talk about EVs. Gabe is the Transportation Planner at the Champaign County Regional Planning Commission (CCRPC) and he currently leads the RPC Tech Committee which consists of 7 members – Champaign, Urbana, Savoy, Rantoul, St. Joseph, Mahomet, and Champaign County. Most recently, they had been talking about the feasibility of EVs in urban as well as the rural areas in the county.

    We talked about the US DOT's Charging Forward, an EV toolkit, that is primarily focused on EV Charging in the rural areas: https://www.transportation.gov/rural/ev/toolkit

    We also talked about Clean City Coalition. State of Illinois does not have a coalition, but Chicago has one and we could potentially reach out to them: https://cleancities.energy.gov/coalitions/

    https://cleancities.energy.gov/coalitions/chicago

    Also discussed the federal funding available through National EV Infrastructure (NEVI), Carbon Reduction Program (CRP), State and Local Planning for Energy (https://maps.nrel.gov/slope/), and EV Pro Lite (https://afdc.energy.gov/evi-pro-lite)

  3. Meeting between Sarthak Prasad, Morgan White, and Robert O'Daniell

    Robert O'Daniell met with Morgan and me on Friday, May 13, 2022. We talked about the following topics:

    • The University's upcoming task force for EVs. There will be two task forces -
      • On-campus
      • Community
    • Reserve List for new EVs - backlog of about 18 months. Ford is not putting more people on this list now.
    • How much EVs/Hybrids save over time
      • With the Tax credits and saving on fuel, the cost is very comparable and sometimes cheaper than gasoline car
      • Maintenance cost of EVs are very low
    • EV Town initiative at Bloomington/Normal area
    • QwikTrip chargers
      • None currently in Champaign
    • We talked about possibly adding Solar Arc at Lincoln & Florida parking lot
      • I will look at the product and possibly ask SSC for funding in the future
    • We also talked about the people Robert has reached out to so far
    • EV-Go
    • Electrify America
    • Where to place a Fast Charger in Champaign-Urbana?
    • I will connect Robert with Gabe Lewis at CCRPC.

    Robert also provided some documents that were updated from last meeting with me (Introductory meeting with Robert O'Daniell)

  4. Introductory meeting with Robert O'Daniell

    I met with Robert O'Daniell on Wednesday, April 27, 2022. We covered several topics, including the electrification trend, Federal and State tax credits for EVs, but majority of the time was dedicated to learn about the EV charging stations in Champaign County as compared to other cities.

    Robert also shared his own experience as an EV owner and the survey he is currently conducting to gauge interest in increasing the number of public-use EV charging and possibility of introducing DC Fast Charging to the campus and Champaign County.

    I will create the survey on Google Forms, and then help deploy it on-campus. We also discussed where to promote this survey.

    See attached the documents that we covered during this meeting.

  5. Update on Charging Stations

    From: Robert O'Daniell <rodaniell@att.net>
    Sent: Sunday, February 27, 2022 5:05 PM
    To: White, Morgan; Slezak, Paul
    Cc: DeLorenzo, Stacey; Prasad, Sarthak
    Subject: I guess I spoke too soon Re: I’m happy to report

    The ChargePoint locations at B4, D22 and E14 are all down. Disappeared from the ChargePoint app and will not charge. (Discovered Sunday noonish at E14 when I failed to begin charge. Standing beside the charger the App said no chargers nearby) Checked the other locations. All three locations have same message on the screen.

    Robert K. O'Daniell
    Photographer Emeritus-News-Gazette
    PO Box 2085
    Champaign, IL 61825
    217-352-1493

    Attached Files: 
  6. Update on Charging Stations

    From: Robert O'Daniell <rodaniell@att.net>
    Sent: Friday, February 25, 2022 1:43 PM
    To: White, Morgan; Slezak, Paul
    Cc: DeLorenzo, Stacey; Prasad, Sarthak
    Subject: I’m happy to report

    The chargers at B4 are back - showing up on the Where to Charge apps again. (Began Feb 24th)

    The damaged screen still not replaced at D22 ( supply chain issue ? )

    On an odd note in the last week or so – I failed in an attempt to charge at E14. Possibly a weather issue and there are indications that others have indeed charged. I have not yet tried again. Possibly a one time issue.

    During that attempt I became aware of some kind of issue with 3G on all three of those charging stations. ATT shut down Feb 22 and Verizon and T-mobile will both shut down 3G by the end of the year. All 3 ChargePoint locations indicate “Illini charging / Off network 1” and a warning message. I did drive by and cars are indeed charging at B4 and at D22 in spite of that message.

    ( images below )
    ——————
    As a retired person I’ve taken on the project of making it easier for people buy and transition to EVs. And to do what I can to improve the infrastructure needed for the EVs.

    Robert K. O'Daniell
    PO Box 2085
    Champaign, IL 61825
    217-493-8129

  7. 11/18 Transportation SWATeam Meeting

    Attached are the meeting minutes and chat from the Zero Waste SWATeam meeting on 11/18.

    Discussed were the following topics:

    • Establishing a telecommuting/teleconferencing policy.
    • Discussing working with an interdisciplinary health intern in IHR to tackle research/application of teleconferencing/telecommuting policy and commuter program.
    • Establishing an EV Task Force through the Parking Department to re-assess campus EV needs.
  8. Spring 2020 Project Deliverables

    Final Project Deliverables for Spring 2020

    There were 7 projects completed by the WIE-GFX Abroad Scholars in the Spring 2020 semester of ENG 177

    1. Armory Bike Path Restoration
    2. Study Abroad Carbon Offset
    3. Electric Vehicle Charging Stations
    4. AASHE STARS Report 2020
    5. Food Waste
    6. Sustainability Best Practices Guide
    7. EPA SmartWay Program
  9. Kent Seminar Series- Kontou

    The next Kent Seminar is set for Thursday, Feb. 13, from 12:30 to 1:30 p.m. at the Illinois Center for Transportation, 1611 Titan Dr., Rantoul.  Eleftheria Kontou will present “Data-driven modeling of electric vehicle charging pricing and worth.” Pizza and soft drinks will be provided at noon. You can also watch the seminar live via YouTube: https://www.youtube.com/watch?v=P6ukx7meG90

     

    1611 Titan Drive Rantoul, IL 61866

     

    Noelle Arbulu • Department of Civil and Environmental Engineering

  10. UIUC's answer to MSU regarding EV charging at UIUC

    MSU asked the following questions of the Big Ten schools.  Here are the UIUC answers, provided by Professor Scott Willenbrock:

     

    Ann,

    Here is information on UIUC.  Most of this infrastructure was put in 3 years ago.  We are now starting to think about where to go from here, so we would appreciate your sharing what you learn from other Big Ten partners.

    Scott

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    BIG10 Sustainability Friends,

    I am looking for case study information on campus EV charging stations. MSU has several but are looking to expand the service. I have a few questions.

    • How many stations/spaces do have installed on campus? Level 2: 8 spaces.  Level 1: 14
    • How do you charge for use? Level 2: 6 spaces have Chargepoint chargers.  Price is $2/hr for the first 4 hours, $8/hr thereafter.  2 of the spaces are free to visitors of the Institute for Sustainability, Energy, and Environment.  Level 1: Six are free to permit holders, eight are pay spaces ($0.75/hr).
    • How is the cost structured? See above.
    • How do incentivize use? Or regulate use so that only EVs can access? We do not incentive use per se.  The six Level 1 chargers that are free to permit holders are all used daily.   In all spots (Level 1 and Level 2) there is signage that says “EV charging only”, and these are generally respected.
    • Are you measuring how much each station gets used? Level 2 Chargepoint: Yes (see below).  As mentioned above, the six Level 1 that are free to permit holders are used daily.  All other chargers are seldom used.
    • Do you have business model to understand payback on the infrastructure/equipment costs?  No. The installation of the Level 2 chargers was expensive, several tens of thousands of dollars.  We are getting about $100/month of income from them.  Clearly this does not make economic sense.  The Level 1 chargers are free, but the cost of the electricity we are providing is so small as to be negligible.  This may change if we expand access to Level 1 charging.

     

    The last question is the most important.

     

    Thank you,

    Ann

     

    Ann Erhardt, MM, ISSP-SA

    Director of Sustainability

    Strategic Initiatives

    Infrastructure Planning and Facilities

    Michigan State University

  11. Transportation iCAP efforts in progress

    Hello Transportation SWATeam members,

    Thank you again for your willingness to help our campus achieve the Climate Leadership Commitments.  There is great value provided by the bi-weekly meetings of student, faculty, and staff representatives evaluating our progress and recommending additional actions campus units could take.

    The following is a list of current activities I am aware of, and suggestions I have about useful next steps.  I am happy to follow up with you on any of these, as needed.

    Thank you very much,

    ~Morgan

    Transportation

    1. EV analysis for department’s assigned vehicles – Hursh Hazari worked with Pete Varney’s data to evaluate the possibility of replacing some fleet vehicles with EVs.  https://icap.sustainability.illinois.edu/project/use-electric-vehicles-ev-campus
    2. Pete Varney has established the F&S fleet as a certified green fleet.  Pete, do you create an annual report for the status of that which you can share?  If not, can you provide an update to the SWATeam and to me? 
    3. Last year the SWATeam discussed encouraging additional campus units to get certified as green fleets.  Your team could submit a recommendation for another unit (or more than one) to pursue that certification. 
    4. New EV Chargers – Scott Willenbrock is working on one at the Illini Union + Phil Krein is interested in getting more Type 1 chargers for the North Campus Parking Deck.
    5. Potential EV Study – At the Oct. 11 Workshop for the Living Lab research connections to iCAP, there will be seed funding offered and the study for transitioning to EVs could collect and use data on campus vehicle use.  Pete has example data, which could be used to support the request for seed funding, which could then possibly fund data collection for the study.
    6. We do not yet have new air travel emission data.  iSEE is working on creating a virtual storeroom to offer carbon offsets to campus units to voluntarily buy air travel offsets.  The storeroom has funding for the first 10,000 offsets, but I understand there was a hurdle on selecting appropriate offsets with additionality.  I recommend asking Ben McCall and Scott Willenbrock about it.
    7. A new Mode split survey is needed as soon as possible.  Lily Wilcock intends to bring this as an item for discussion.  We would appreciate it if you would help define the survey questions, and then iSEE can help distribute the survey to get updated figures. 
    8. Bike Plan – I suggest you ask Stacey DeLorenzo to join one of your meetings to give an overview of the status of the Bike Plan infrastructure upgrades.
    9. Lily has funding for a Bike at Illinois website, which Creative Services will develop in the winter and spring months this fiscal year. 
    10. Lily has worked with MTD to offer bus tours to show campus staff how to use the MTD.  We teach all our new student how to ride, but none of the new employees get the personal introduction.  These tours are very successful, when they are organized with a specific department or location. 
    11. Bike Parking – there is a significant capacity issue, which is noticeable just by looking around campus, especially during class hours in the core area.  Lily has a new website that she can show you, and there is an upcoming Bike Census, which your team members should help with.
    12. Bike Sharing – a handful of dockless bike sharing companies are wanting to come to town/campus.  To manage their impacts (imagine bikes in the boneyard) they will be required to obtain city permits.  Lily is asking the SSC to use the funds they allocated to bike sharing for additional bike parking areas in the heart of campus.
    13. MCORE – this project has several impacts on multi-modal transportation.  You can learn more at http://www.mcoreproject.com/project-construction-updates.
  12. EV Car Charging Pilot Study Agreement

    Campus currently has a scarcity of EV Charging Stations on campus, with only eight public and nine permit-required charging stations on campus utilizing level 1 chargers, and only two level 2 chargers on the far east side of campus. Level 1 chargers take significantly longer to charge than Level 2, and there is distinct room for campus to grow in this regard. This project will expand the number of level 2 chargers on campus to promote the utilization of more electric vehicles. Initially, 1-2 stations will be installed, with metering equipment included in order to track utilization and demand. This proposal directly funds: 1) Up to two Electric Vehicle chargers 2) Installation costs from Facilities and Services.

  13. ENVS 301 students' presentations

  14. New York Times article on EVs