  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Installing fiber optics

    Hi everyone, We had a successful day of collecting geophysical logs in the borehole. I have seen print outs of this excellent data, and is an important part of the geologic characterization. Thanks goes out to Tim Young for coming out of retirement to help us complete the work.

    Tomorrow we will install the U-bend and fiber-optic cable in the borehole. Our task is to sink a 400-foot log tube filled with water (weighing ~600 lbs) down the hole. For those nearby you may want to drop by for a visit. Once this is done, we will proceed to grout the borehole closed.

    Cheers,

    Andy

  2. Last drilling update

    Hi everyone,

    We finished drilling today and advanced the borehole to a depth of 385 feet.

    Tomorrow we will collect geophysical logs of the borehole. If you want to drop by we should be in full swing by 11 am. It will take some time to clean out any material that has collapsed in the borehole overnight and make sure the hole is full of mud before logging the open hole.

    Best,

    Andy

  3. Weekly update

    Associated Project(s): 

    All, Last week was slow, per usual this time of year. I had a training session for two new staffers. They’ll start in the new year as they have finals this week.

    Bike count is hovering around 15-20 with a few safety checks still in the queue. A couple staffers expressed interest in morning shifts this week so if that happens, hopefully it’ll result in a few more builds being ready before winter break.

    This week I will continue work on the Student Staff Manual and will line up some new volunteer tasks since the regular items are getting ticked off the list.

    The numbers:

    Visitors: 51
    Sales: $117.50
    tire/tubes: 6 for $23


    Thanks!

     

    -        Jake Benjamin
    Campus Bike Center Manager

  4. Daily update

    Hi everyone, As expected our rate of drilling today slowed when drilling the shale bedrock. The crew was able to drill an additional 25 feet to a depth of 355 feet.

    Next week, since Monday will be the last day we have to drill the hole deeper, we have decided to stop coring and just drill straight through so that we can reach the target depth of 450 feet. Tuesday is needed to clean out the borehole so that geophysical logging can be done on Wednesday. On Thursday and Friday, we will install the geothermal loop and fiber optic cable and grout the hole closed.

    Have a great weekend.

    Andy

  5. Daily update

    Hi Everyone, We are starting out Wednesday morning at 294 feet, about 5 feet into the bedrock. The crew will be widening the hole this morning from 5 inches to 5.9 inches before going deeper into bedrock. Looks like a nice day for drilling!!

    Andy

  6. Daily update

    Hi everyone,

    After a morning of thawing out the drilling system from well below freezing temperatures on the weekend, we were able to reach 240 feet. With the top bedrock being <60 feet, it is likely they will reach it on Tuesday.

    My colleague Jason Thomason will be at the site on Tuesday while I am out of town.

    Best,

    Andy

  7. Weekly update

    All, Visitor numbers are down, sales are down, builds are ever-creeping up: It must be winter!

    We’re only averaging a few actual work-on-my-bike visitors per day now, and I imagine it’ll get even slower the closer we get to winter break. The student staff has responded positively to the shift in shop build protocol away from piecemeal jobs and towards being wholly responsible for the bike, start to finish. I don’t think it has actually positively affected the quality of their work—yet—but they seemed more engaged and invested in the task at hand. 

    Not sure the numbers on it but I feel like I’ve had a pretty steady flow of volunteers in for either community service or volunteer memberships. Not too many volunteer duds, as most seem pretty jazzed and impressed with the space/DIY idea.

    This week I’ve got a meeting with the GM of VeoRide and separately, a TBP-UIUC meeting, as well as student staff training towards the end of the week.

    The numbers:

    Visitors: 43

    Sales: $144.50

    Memberships: 2 for $60

     

    Thanks!

     

    -        Jake Benjamin
    Campus Bike Center Manager

  8. Daily update

    Hi everyone,

    We had a successful day 2 after deicing the system. We are now down to 165 feet and heading into the oldest glacial strata. If you are following along with the log I sent, we are about 170 feet on it.

    We will start up again Monday morning.

    Best,

    Andy

  9. daily update

    Hi everyone,

     

    After day 1 we have drilled to a depth of 90 feet. This is excellent progress with snow much of the day, and not getting in the ground until late morning.

    So far, the geology is similar to previous drilling in the area (see log attached).

     

    Cheers,

    Andy

  10. Weekly Update

    All, Winter is upon us! Visitor numbers are still relatively high, considering the cold weather, which is a great sign. We have one student in every week who’s still plugging away at his B-a-B. Most others have abandoned them and I have had the staff reclaim them as shop builds.

     

    Last week I finished and delivered the bike that’ll be raffled off at the Staff Appreciation Week. I worked up a checklist for the future days when I’ll need the student staff to run open hours for me. Safety checked a few more bikes and worked on inventory.

     

    This week I’ll need to begin looking at reallocating space for how many shop builds we have. Most of the front area of the shop is all for-sale bikes so now we’ll need to start a row in the back.

     

    I’ll also be getting in touch with VeoRide about a possible partnership for getting more people on bikes.

     

    The numbers:

    Visitors: 58
    Sales: $61
    Memberships:  1 for $30

     

    Thanks!

    • Jake Benjamin
      Campus Bike Center Manager

     

  11. Funding Approval for Geothermal Characterization/Monitoring Station

    Evan De Lucia and Mohamed Attalla approved $65,610 of funding from the Carbon Credit Sales Fund for a Geothermal Characterization/Monitoring Station at John Bardeen Quad.

     

    An email of approval is attached below.

    The project proposal is attached below.

  12. NEW THINGS

    Associated Project(s): 
    Recruited organization team, dinner with Hillel, working on getting sponsors for the spring comptetition
    Be part of the Freezer Challenge, send emails, help promote
  13. WHATS HAPPENING?

    Producing 25000 lbs. of tomatoes,

    now have classes there looking to work with university to teach about plants! 

    economically sustaining our own building,

    looking to expand to a new location! 

    Strong producer for the campus, and excited to grow more!