  1. LED Exit Sign projects completed

    Associated Project(s): 

    In support of the Chancellor's commitment to making the University of Illinois an LED Campus, 531 LED way-finding signs have been installed in eight campus buildings: Grainger Library, Animal Science, Roger Adams Lab, Engineering Science Building, Turner Hall, Main Library, Education Building, and the Chem. Life Sciences Lab.

  2. Spurlock ECIP project

    Mike,

    As we discussed on the phone, our Electricians have visited with the folks at Spurlock and secured a preliminary scope of work (see attached). Because of the complex existing lighting system in the building our Electricians will require some assistance from our In-House Engineering staff. I understand that Spurlock has been allotted $22K for this work. I am going to ask Robert to give us an estimate of the Engineering charges and if they exceed 10% of the budget we will discuss scaling back some of the scope with the folks at Spurlock. The AiM project is 2693 and the Engineering estimate work order is 10282137.

    Thanks,

    Thomas Doud

    Construction Superintendent

    Construction Services Division

    University of Illinois, Facilities and Services

    217-244-3686

    Attached Files: 
  3. updated list of LED exit sign buildings

    Associated Project(s): 

    FY07 - 13 buildings

    • 112 - MEB
    • 26 - Altgeld
    • 12 - Noyes
    • 99 - Undergrad
    • 210 - DCL
    • 15 - Engineering Hall
    • 152 - Hydrosystems
    • 67 - Loomis
    • 29 - MEL
    • 34 - MSEB
    • 24 - Newmark
    • 13 - Talbot
    • 42 - Transportation Bldg

    FY08 - 12 buildings

    • HARDING BAND BUILDING #4
    • ILLINI HALL #65
    • OPTICAL PHYSICS BUILDING #165
    • ILLINOIS PROGRAM FOR RESEARCH & HUMANITIES #221
    • ARCHITECTURE BUILDING #50
    • NOBLE HALL #90
    • ART & DESIGN #219
    • MUSIC BUILDING #39
    • FLAGG HALL #89
    • UNIVERSITY HIGH SCHOOL #61
    • ARMORY #6
    • FOELLINGER AUDITORIUM #7

    FY14 – CURRENT PROJECT

    • #324 Grainger Library
    • #174 Engineering Sciences
    • #116 Roger Adams Lab
    • #336 Animal Sciences
    • #197 Turner Hall
    • #370 South Studio #5
    • #371 South Studio #7

    OTHER PROJECTS

    • #339 Temple Buell Hall
  4. update on project progress

    Associated Project(s): 

    Ken Buenting, Sharon Ball, Eva Sweeney, Morgan Johnston, and Ryan Wild met to review progress on the LED Exit Sign work.  Ken reported great progress with four buildings complete and one in progress: Grainger, RAL, Animal Sciences Lab, and the Engineering Sciences Building.  They are in Turner Hall now.  Just over $24K has been spent so far through the contractor.  They will move on to the Main Library and the Education Building next.

    The current implementation process is as follows:

    1. Ryan Wild and Morgan Johnston work with others to identify the priority list of buildings.
    2. Eva Sweeney will review records to ascertain whether the fixtures are connected to an emergency generator or will need battery backup.
    3. Sharon Ball and team will do the initial count of fixtures.
    4. Ken Buenting will direct the hired contractor to replace the existing fixtures and provide data sheets for our records.
    5. Eva Sweeney and Ryan Wild will identify additional signage installation needs.
    6. Ken will direct the F&S electricians to install the additional signs.

    Eva had Ken remove Temple Buell Hall from the list because it is being handled through another project.  Also, through other funding, South studio five and seven were completed.

  5. News about Christopher Hall winning

    Saving energy pays off for Christopher Hall

    Clayton Glazik 3/5/2014

    Since we were little our parents have told us to turn off the lights after we leave a room. That is just what the Christopher Hall residents at the University of Illinois did in 2013. By shutting the lights off in rooms not in use, switching their lights to compact fluorescent light (CFL) bulbs, as well as other sustainable practices, the building was able to cut back its energy usage by 30.6% from the previous year.

    The campus Facilities & Services (F&S) hosted a reception at Christopher Hall on February 14 to celebrate the building’s accomplishment in the F&S Energy Conservation Incentive Program (ECIP). A campus-wide sustainability effort, ECIP provides building upgrades to facilities that produce top energy conservation results in energy advancement and occupant action categories. ECIP calculates how much money the buildings are saving in energy reduction and gives it back to the building to pay for upgrades.

    Christopher Hall, which houses the Family Resiliency Center (FRC), the Autism Program (TAP), several classrooms, faculty and staff offices, and a family research home, saved nearly $22,000. According to FRC Director Barbara Fiese, a building committee recommended investing the funds in a bike rack since so many people cycle to work, as well as other items that can further reduce energy usage.

    In 2010, the University of Illinois published a climate action plan that set aggressive timeliness for reducing energy consumption on campus. Currently, there are more than 300 such active projects, which can be tracked at http://icap.sustainability.illinois.edu/projects.

    “At the end of the day, if we really want to meet ICAP goals, we have to do more,” says Al Stratman, F&S executive director. “That is why we came up with ECIP, which mirrors the campus goals.”

    At the award ceremony, faculty and students pledged to continue reducing energy in their lifestyles by taking public transportation, using natural light in their offices rather than electricity, and shopping more at local food markets instead of commercial grocery stores. With their current sustainable practices and these recent pledges, Christopher Hall will continue slashing their energy consumption, making the Illinois campus a greener place.

    (from Family Resiliency Center news http://illinois.edu/lb/article/3493/82438)

  6. News about Library winning

    Libraries Win Energy Awards

    Jan 23, 2014

    The Energy Conservation Incentive Program (ECIP) at Illinois awards building upgrades on campus in facilities which have produced top energy conservation results. Each year eight campus buildings receive ECIP awards in two separate categories. Those selected have demonstrated the greatest percentage of energy conservation over a one-year period.

    In 2013, three of eight awards went to Urbana campus libraries. The Undergraduate Library won 1st Place in the Occupant Action category; in the Energy Advancement category, the Main Library took 3rd Place while the Grainger Engineering Library took 4th Place. These libraries will work with the Utilities & Energy Services Division within Facilities & Services at the University to implement upgrades to their appearance or functionality.

    The Energy Advancement category is for campus buildings whose energy reduction is the result of central funding from a significant energy conservation project. The Occupant Action category is for those buildings which have not benefited from such projects in the last fiscal year.

    To learn more about the ECIP, please visit go.illinois.edu/ecip.

    (from Library News at http://www.library.illinois.edu/news/ECIP2013.html)

  7. Exit Signs to be upgraded to LEDs in 7 buildings

    Associated Project(s): 

    Building

    Bld #

    Cost (labor/material)

         

    Animal Science Lab

    165

    $10,900

    Temple Buell Hall

    339

    $7,300

    Turner Hall

    197

    $10,500

    Grainger Library

    324

    $8,200

    Roger Adams Lab

    116

    $12,300

    Engineering Science Bld

    174

    $13,400

         
       

    Cost (Material only)

    Abbott Power Plant

    120

    $36,900

         
     

    Total

    $99,500

     

  8. Campus funding allocated for LED exit signs

    Associated Project(s): 

    The LED Campus commitment includes having all the interior wayfinding signs converted to LED by 2025.  This is primarily LED Exit Signs.   We had hoped to use the Revolving Loan Fund to implement another phase of the LED Exit Sign project.  However, that funding is only applicable if there is a reasonable payback through utility savings.  LED Exit Signs have a good payback, but not through Utilities.  The savings come from reduced maintenance, which also provides a reasonable payback.   Given the shortfall in maintenance funding and the Chancellor’s commitment to becoming an LED campus, Mike Andrechak agreed to provide $100,000 per year for two years toward LED Exit Signs.  This funding could be continued in future years, subject to funding approval.

  9. FY13 ECIP Award Winners Announced

    Energy Advancement Category

    1. Atmospheric Sciences Building            53.3%
    2. Spurlock Museum                                      44.5%
    3. Main Library                                                 43.1%
    4. Grainger Engineering Libra                    41.3%

    Occupant Action Category

    1. Undergraduate Library                            35.2%
    2. Law Building                                                  35.1%
    3. Christopher Hall                                          30.6%
    4. Henry Administration Building             28.4%
  10. Explanation of calculations

    We take total energy usage by building (electricity, Steam, Nat Gas and Chilled Water) convert all of those to one common unit, MMBTU (million British Thermal Units) and after adjusting for the weather differences between years, compare each building's annual usage with the year before.  We then convert the change into a percentage and then rank all eligible buildings by percentage saved.  The top four in each category win first through fourth.     Having won in FY13 does not disqualify you from winning in the future.  The goal is to encourage individual contributions to saving energy.   Mike Marquissee

  11. Report by Anna Hochlater

    Associated Project(s): 

    "The Burrill/ Morrill Hall corridor offers a unique opportunity to explore methods of sustainable design through conventional practices of rain garden design as well as hardscaping improvements, lighting installations and additional non-plant strategies.  A moderate strategy is advised. In this conversation moderate is understood to mean more than a creating only rain garden while leaving the existing vegetation, but less than a full redesign which would completely reshape the hardscaping.  A moderate strategy addresses the creation of the rain garden, all the landscape beds while leaving the mature canopy trees in place, and makes some alterations to the existing hardscape.  Perhaps the most difficult challenges of the corridor will be to unify the character of the corridor landscape beds and to design a solu-tion suitable for the harsh conditions of very little sun, significant wind, and heavy pedestrian use."

  12. Anna hired to complete this work

    Associated Project(s): 

    Eliana Brown provided the following update.

    • Anna Hochhalter was hired by F&S for the summer to complete a revised design of the Burrill/Morrill walkway rain garden / native plants improvements.  She reviewed the entire walkway from Mathews to Goodwin.  Her report is expected August 15th.
    • The space should be multifunctional, use native plants, accommodate the stormwater run off with green infrastructure.  It could include new lighting and artworks.
    • This project will use the existing SSC funding, as well as other funding sources.  The other funding sources may include Champaign County Soil and Water Conservation District, and/or F&S.
    • Eliana will take the project scope change request to SSC this fall, for approval.
    • Matt Edmonson has been involved with this project and will inform Eliana about any additional campus approvals that may be needed.
  13. Code Complance and Fire Safety Funding Meeting

    Associated Project(s): 

    Ryan Wild, in Code Compliance and Fire Safety, met with Morgan Johnston to review the funding parameters for this project, and identify next steps.  Morgan asked Teresa Tousignant and Nishant Makhijani, from the Student Sustainability Committee, about potential student volunteers to help locate the existing incandescent exit signs.  Ryan will work on the building surveys for the smaller buildings, and we will hold KCPA, Main Library, Beckman, Roger Adams Lab, and Chem Life Sciences Lab for potential student assistance.

  14. LED Exit Signage FY12

    Associated Project(s): 

    Twenty University buildings have been allocated RLF funding for LED exit signage in FY12. The buildings, in order of priority, are Krannert Center for the Performing Arts, Foellinger Auditorium, the Beckman Institute, the Main Library, Davenport Hall, Temple Hoyne Buell Hall, the Education Building, the Law Building, the Animal Sciences Laboratory, Freer Hall, the Henry Administration Building, Grainger Engineering Library, the Agricultural Engineering Sciences Building, Turner Hall, the Illini Union Bookstore, the Stock Pavilion, the Engineering Sciences Building, Kenney Gymnasium, the Roger Adams Laboratory, and the Chemical and Life Science Laboratory.

    Implementation of LED exit signage has already started for four of these buildings; 75 percent of Krannert Center for the Performing Arts, 80 percent of Foellinger Auditorium, 10 percent of Freer Hall, and 30 of the Henry Administration Building has been completed. Implementation in the remainder of the buildings is now set to begin.

  15. Revolving Loan Fund approved for $250K for LED Exit Signs

    Associated Project(s): 

    The Revolving Loan Fund is approved to fund $250K in LED Exit Sign improvements.  Here is the description of the project, as reviewed by the RLF committee:

    ======================================

    This project will replace existing exit signs with efficient LED fixtures in approximately (14) campus buildings.  As a result, energy use will be decreased, life safety systems will operate more reliably, and maintenance needs will decrease dramatically.  This is a continuation of projects funded in FY07 and FY08. We are requesting funding in the amount of $250,000, although the work is very scalable and any funding amount can be successfully applied. 

    _________________________________________________________________

    CRITERIA:

    ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯

    08. VISIBILITY - Very visible.  Building users notice when exit signs are burned out and it may make them feel uncomfortable or unsafe.  It also creates a negative impression of the pride we take in our facilities.

    09. PAYBACK PERIOD - When replacing incandescent, the payback from energy savings alone is about 6-7 years.  Replacement of fluorescent exit signs yields a payback of 8-10 years.  However, the old signs also require maintenance up to 3 times per year.  If one includes this expense, the overall payback improves to 1-2 years.

    10. REDUCTION OF COAL - By reducing overall campus energy use, this will contribute to Abbott Power Plant s ability to reduce the number of generation units in use.  An additional benefit is the reduction in GHG emissions from maintenance vehicles traveling to replace burned out lamps.

    11. FUND SIZE IMPACT - F&S is working with the Illinois DCEO and this project would qualify for about $7,000 in grant rebates.

    12. PROJECT COORDINATION - F&S has a record of success with these projects.  We have developed a project execution method that keeps overhead to a bare minimum, avoids expensive consultant fees, purchases material at bulk prices, and achieves maximum labor efficiency.  F&S Construction Services will execute the work, and F&S Engineering will document results for the DCEO grant.

    _________________________________________________________________

    ISSUES:

    ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯

    01. REPLACEMENT OF FACILITY SYSTEMS - Existing exit signs are typically long past their expected life, and have many maintenance problems.  The new LED exit signs will have an expected useful life of at least 15-20 years.

    03. IMPACT ON PLANNED PROJECTS - Very little impact on capital projects.  We coordinate to ensure no overlap between buildings selected for exit sign replacement and planned major renovations.

    04. WHAT IF PROJECT IS NOT FUNDED? - If this project is not funded, our campus will continue to expend many maintenance hours keeping these lights operational, and waste electricity on inefficient technology that is over 20 years outdated.

    If this project is partially funded, we will install as many LED exit signs as possible with the funds allocated.

    06. WHAT OTHER DEPARTMENTS ARE AFFECTED BY THE PROJECT? - The buildings we propose are all across campus and used by virtually every college and department.  These units will benefit from improved safety and fewer maintenance disruptions.

    07. RISK FACTORS - No known risk factors.  In fact this work will reduce the risks associated with having nonfunctioning exit signs, and improve life safety for the campus community.  We have executed this type of work in 25 buildings so far without major problems.

  16. Burrill and Morrill Rain Garden Spring 2012 Funding Award and Acceptance

  17. LED Exit Signs Phase 2

    Associated Project(s): 

    Phase 2 of the LED Exit Sign project to replace incandescent exit signage with LED fixtures started on June 30, 2008. This phase of the project will replace fixtures in the Armory, Foellinger Auditorium, Harding Band Building, Illini Hall, the Optical Physics Building, the Illinois Program for Research & Humanities, the Architecture Building, Noble Hall, the Art & Design Building, the Music Building, Flagg Hall, and University High School.