LED Exit Signs funding request submitted
F&S Building Maintenance submitted the attached funding request to the F&S Director of Shared and Administrative Services for the next round of the LED Exit Sign projects.
F&S Building Maintenance submitted the attached funding request to the F&S Director of Shared and Administrative Services for the next round of the LED Exit Sign projects.
Krannert Center has identified several projects to tackle with the ECIP award funding:
The dollar amounts listed are approximations. Any additional funds not used for these items would be allocated to expanding the stock of replacement LED bulbs.
Sarthak Prasad completed his independent study with Dr. Rizwan Uddin in fall 2016. Please see attached the final report from this study.
The 2016 ECIP award winners were announced last Wednesday, and they will be given plaques at the annual Campus Sustainability Celebration this week, 10/16 from 4-6 at the Alice Campbell Alumni Center. Here is the letter.
Congratulations!
We would like to recognize your unit as a 2016 Energy Conservation Incentive Program (ECIP) award winner during the Campus Sustainability Celebration on Wednesday, October 26 from 4-6 p.m. at the Alice Campbell Alumni Center. For planning purposes, please let us know who will be accepting the award(s) on behalf of your unit by Friday, October 21.
Sustainability initiatives are at the core of Illinois’ commitment to its land-grant university mission. The Climate Leadership Commitment pledges the Urbana campus to be carbon neutral by 2050, which requires all students, staff, and employees working together to implement a dynamic, multi-disciplinary approach to campus sustainability.
The ECIP awards began in 2013 as a way to recognize outstanding individual and team efforts that move us closer to reaching our Illinois Climate Action Plan (iCAP) goals. The ECIP honors occupants of campus buildings that have reduced energy at the greatest level from one year to the next. This year more than $177,000 for improvement projects in winning facilities will be provided through the program.
Everyone researching, learning, and working in these nine buildings is an ECIP winner, and we encourage as many participants to join the celebration as possible. Hosted by Facilities & Services and the Institute for Sustainability, Energy, and Environment, the Campus Sustainability Celebration will cover the iCAP objectives, celebrate the diverse sustainability community, and recognize 2016 winners.
We look forward to you and your employees joining us to celebrate the ECIP winners and their contributions toward campus energy conservation.
2016 ECIP WINNERS |
||
Occupant Action Category |
% Improvement |
Incentive Award |
1. Atmospheric Sciences Building |
7.5% |
$50,324 |
2. Krannert Center for the Performing Arts |
4.8% |
$34,111 |
3. Institute of Government & Public Affairs Building |
4.4% |
$15,083 |
4. 1207 West Oregon Street (tie) |
2.9% |
$10,048 |
4. Temple Hoyne Buell Hall (tie) |
2.4% |
$11,486 |
Energy Advancement Category |
% Improvement |
Incentive Award |
1. Davenport Hall |
25.8% |
$26,335 |
2. Ceramics Kiln House |
21.2% |
$10,000 |
3. Transportation Building |
14.0% |
$10,000 |
4. Rehabilitation Education Center |
9.6% |
$10,000 |
Helen J. Coleman, LEED AP
Interim Executive Director
University of Illinois Urbana-Champaign
Facilities & Services
1501 South Oak St.
Champaign, IL 61820
Phone: (217) 265-8477
E-mail: hjcolema@illinois.edu
Met with the university Facilities and Services officials and LED staff on Wednesday, September 21, 2016, to discuss the progress of LED Campus projects so far. The main focus of the meeting was Exit signs in the buildings. Meeting was hosted by Mogan Johnston, and attended by Ken Buenting, Brian Finet, Steven Bainbridge, and Patty Douglas.
The ECBS Objective 4 Subcommittee met Tuesday, February 16 to continue fleshing out the ECBS SWATeam's fourth iCAP objective, which has to do with increasing campus engagement in sustainability. Discussion continued on ECIP and potential changes for the upcoming year- a major issue is raising awareness of this program and others like it. By the conclusion of the meeting, the focus of the subcommittee shifted to creating and sending recommendations to the iCAP Working Group, such as a Green Labs Initiative proposal as well as continuing Eco-Olympics or initiating a similar program that would serve as dorm resident engagement. The next meeting is scheduled for Tuesday, February 23.
The ECBS Objective 4 Subcommittee held its first meeting on Tuesday, February 9. Discussion revolved around the issue of tying all existing campus engagement programs (e.g., ECIP, Certified Green Office Program, revolving loan fund, etc.) together into one campus-wide brand.
Occupant Action Category | % Improvement | Incentive Award |
1. Admissions and Records Building |
39.2% | $61,778 |
2. Agricultural Bioprocess Laboratory |
25.2% | $34,110 |
3. Christopher Hall | 24.9% | $18,297 |
4. Turner Hall | 11.4% | $16,075 |
Energy Advancement Category | % Improvement | Incentive Award |
1. David Kinley Hall | 39.9% | $33,701 |
2. Lincoln Hall | 32.0% | $15,961 |
3. Early Childhood Development Building |
24.2% | $10,000 |
4. Davenport Hall | 19.6% | $10,000 |
Currently, the Illini Union has a variety of water fountains in the facility, totaling 16 units. Select fountains were retrofitted in 2009 with “goose-neck” style bottle filler fixtures, however these are susceptible to damage and not filtered. Ten units in public areas are funded for replacement in this project with Elkay fountains that have built in bottle refill stations. These water fountains will make it much easier to fill water bottles than the current water fountains and provide filtered, cool water to students and guests. These fill stations will also track the number of bottles saved from the land fill and will provide this information on an LED screen at the top of the refill station. The LED screens on each water fountain can be used as an educational resource for all users. These new Elkay water fountains will encourage everyone to refill their water bottles because each unit provides a real time digital display of the number of bottles saved from the landfill.
The Daily Illini notes the ECIP in this article about the iCAP Forum.
http://www.dailyillini.com/news/article_e5e80564-5a55-11e4-b9f4-001a4bcf...
CHAMPAIGN, IL (October 22, 2014) – Eight facilities on the Urbana campus will win funding for facility improvements as recipients of the 2014 Energy Conservation Incentive Program (ECIP) awards on Wednesday, October 22 at 3:00 p.m. in Illini Union 314B as a part of the Illinois Climate Action Plan (iCAP) Forum.
Last year, the ECIP awarded more than $250K in pre-approved energy conservation projects.
The list of FY14 winning facilities is attached.
After the successful completion of the recent LED Exit Sign upgrades, the F&S Building Maintenance division has received approval for another round of LED Exit Sign upgrades. Ken Buenting, Sharon Ball, Ryan Wild, and Morgan Johnston met to discuss the prioritization process for identifying the next buildings to address. Buildings will be ranked according to student/transient visitor contact hours (if this information can be obtained), results of campus code fire safety reports, and coordination with other projects or funding.
Most of the toilets at ISR are original to the building and consume 3 gallons per flush. A limited number have been replaced with the 1.6 gallon per flush. - Bryan Johnson
In support of the Chancellor's commitment to making the University of Illinois an LED Campus, 531 LED way-finding signs have been installed in eight campus buildings: Grainger Library, Animal Science, Roger Adams Lab, Engineering Science Building, Turner Hall, Main Library, Education Building, and the Chem. Life Sciences Lab.
The attached file is the final report for the Water Bottle filler retrofit program.
The Energy Liaison Program Ambitious goals reflect the University’s commitment to sustainability - environmental, social and fiscal. Although energy conservation is a universal problem, its solution begins with individuals. Departments and colleges across campus have designated Energy Liaisons to promote energy conservation and share ideas and suggestions. Energy liaisons:
Creating Obtainable Goals
Examples: Short-Term Goals
|
|
|||||
|
The Energy Management Division of Facilities and Services initiated anEnergy Liaisons program in 2008. Departments, colleges, and other units across campus have designated Energy Liaisons to promote energy conservation and share ideas and suggestions. Facilities and Services regularly hosts workshops with the Energy Liaisons to discuss energy conservation opportunities. These Energy Liaisons serve as grassroots contacts for conservation initiatives.
Mike,
As we discussed on the phone, our Electricians have visited with the folks at Spurlock and secured a preliminary scope of work (see attached). Because of the complex existing lighting system in the building our Electricians will require some assistance from our In-House Engineering staff. I understand that Spurlock has been allotted $22K for this work. I am going to ask Robert to give us an estimate of the Engineering charges and if they exceed 10% of the budget we will discuss scaling back some of the scope with the folks at Spurlock. The AiM project is 2693 and the Engineering estimate work order is 10282137.
Thanks,
Thomas Doud
Construction Superintendent
Construction Services Division
University of Illinois, Facilities and Services
217-244-3686
FY07 - 13 buildings
FY08 - 12 buildings
FY14 – CURRENT PROJECT
OTHER PROJECTS
Ken Buenting, Sharon Ball, Eva Sweeney, Morgan Johnston, and Ryan Wild met to review progress on the LED Exit Sign work. Ken reported great progress with four buildings complete and one in progress: Grainger, RAL, Animal Sciences Lab, and the Engineering Sciences Building. They are in Turner Hall now. Just over $24K has been spent so far through the contractor. They will move on to the Main Library and the Education Building next.
The current implementation process is as follows:
Eva had Ken remove Temple Buell Hall from the list because it is being handled through another project. Also, through other funding, South studio five and seven were completed.