  1. Summary: F&S Space Management Plan 2021-2030

    Associated Project(s): 

    The F&S Space Management Plan 2021 – 2030 documents how space is used on campus. F&S works with the Office of the Provost and other campus units and committees to manage and improve the use of space on campus, which occupies over 23 million gross square feet of facilities in more than 750 owned and leased buildings.

    Properly managing the space is essential, as more than 57,000 people enrolled or employed by the university live and learn on campus. Additionally, the plan notes that “people enrolled or employed on campus has been steadily increasing since 2000, growing by over 4% from 2017 to 2018 alone.”

    Over the past decade, balancing campus growth and sustainability goals of the Net Zero Space Growth policy, part of the Illinois Climate Action Plan (iCAP), has required an innovative approach to analyzing campus density and opportunities for greater square footage efficiency. In-depth planning and procedures have included renovating existing space, improving utilization of existing space, and increasing the ability to share space and resources between units and across campus. The modest change to the campus footprint in recent years, despite additional enrollment, demonstrates the value of these actions.

    “With enormous capital investments required to build, operate, and maintain our campus infrastructure, space is a critical asset that must be managed effectively to ensure the continued success of our university,” the plan reads. Net Zero Space Growth is essential to the university achieving strategic goals and is a crucial challenge of the ongoing project planning efforts in F&S Capital Programs.

  2. New Veo Dashboard

    Associated Project(s): 

    The Midwest Regional manager of Veo, Ben Thomas, informed Sarthak that there is a new updated Veo dashboard for UIUC. This new dashboard can be found in Veo's Tablaeu environment.

  3. Archived description

    Associated Project(s): 

    The MCORE project requires the CUUATS partners to monitor the pedestrian and bicycle counts following the completion of the project. This requirement is to understand the increased waking and bicycling activities at the twelve predetermined corridors. CCRPC collected pedestian and cycling counts at these locations before the MCORE project. These twelve corridors are listed in this project update.

    The University has identified other locations on campus to add pedestrian/bicycle counters as well, other than these twelve MCORE corridors. In March 2020, the first Eco-Counter pedestrian/bicycle counter was installed at the Illini Union location on Green Street. The University is also working with Obama Energy to get IntelliStreet light poles for pedestrian/bicycle count collection.

  4. Archived Title + Description

    Old project name: ADA Transition Plan

    New Project name: ADA Transition Plan and 2017 Supplement

    The American with Disabilities Act (ADA) identifies facility requirements to meet the needs of persons with disabilities.  This University has a very strong history of support for persons with disabilities, and that is reflected in many of the campus facilities.  One example is the new Tim Nugent residence hall with the Beckwith program in Ikenberry Commons.  Sidewalks, traffic signals, construction zones, and buildings are designed to meet ADA code requirements.  In 2012, the City of Urbana published an ADA Transition Plan to survey and upgrade all curb ramps in that city's jurisdiction.  A similar survey and plan needs to be developed for campus walkways.  The vast majority of sidewalks on campus are already ADA code compliant, so this will identify the locations lacking proper facilities and prioritize those locations for correction.

  5. Archived description: MCORE porject

    The Champaign-Urbana Mass Transit District (MTD), City of Champaign, City of Urbana, and the University of Illinois at Urbana-Champaign are partnering to improve mobility in our communities core through a federal Transportation Investment Generating Economic Recovery (TIGER) grant. The $35M MCORE Project is unprecedented in our community’s history and will have a transformative impact.

    MCORE Project construction is anticipated to start in September of 2016 and continue into 2019, covering five separate project areas to improve key urban transportation corridors.

    Enhances Mobility Choices


    The goal of MCORE is to provide a balance between all modes of transportation. Transportation choices address pedestrian access routes, bicycle lanes, transit efficiency and vehicle flow; and reduce potential conflict areas.

    Improves Infrastructure


    MCORE will improve the condition of the existing pavement and bring the streets of these core transit corridors into a state of good repair while redesigning them into complete streets to accommodate all users.

    Promotes Sustainability


    MCORE will encourage sustainable development that is located and designed to be compact and contiguous to existing development and have limited environmental impact; provide streetscape improvements for an enriched built environment, sense of place, and quality of life; emphasize all modes of transportation while decreasing the use of single occupancy vehicles, thereby reducing congestion, traffic hazards, and carbon emissions.

    Improves Critical Linkages


    The completion of the MCORE Project will provide better connections between the downtown centers of Champaign and Urbana, the university, the area’s major employers, health, and social service organizations.

  6. Archived background

    Associated Project(s): 

    Between August 4, 2011 and March 9, 2016, there were 373 bicycle thefts reported to the University of Illinois Police Department (UIPD).  This number is beleived to be a low estimate, due to under-reporting, and because some bike thefts on campus may have been reported to the local Champaign or Urbana city Police Departments. 

    That is an average of 82 reported bicycle thefts a year!

    A map of these theft locations can be found here:

     

     

     

    Top areas of bike theft from August 2011-September 2013 (two years):
    Area Number of Bikes Stolen
    1010-12 W Illinois (ISR) 15
    201 N Goodwin Av (Seibel Center) 15
    College Court Area (PAR/FAR) 10
    405 N Mathews (Beckman) 8
    1005 W Gregory Dr (Allen) 7
    1005 S Lincoln Av (LAR) 6
    205 N Mathews (Newmark) 6
    1110 W Green Street (Daniels Hall) 5
    1401 W Green St (Illini Union) 5

    Source: UIPD 9/17/13

  7. Addition to the original description: Keys to reducing bicycle theft

    Associated Project(s): 

    Keys to reducing bicycle theft:

    1. Never leave your bicycle unlocked!
    2. Always lock your bicycle to a bicycle rack! Learn how to properly lock your bicycle Lock Your Bike Right (LYBR) video from 2019.
    3. Register your bicycle and install the registration sticker (529 Shield) to your bicycle. Learn more at Bike at Illinois' Register Your Bike page or go.illinois.edu/mybike
    4. Report a bike theft to UIPD immediately at (217) 333-1216.
  8. Conclusion; Lessons learned; Issues encountered

    Associated Project(s): 

    The Bike Shelter was installed North of the Flagg Hall in June 2021. The structure dimensions are 14' x 63' with 6.5' height on one side and 8' on the other side. The bike shelter utilizes Side Stage (vertical) bike racks and can accommodate up to 73 bicycles. Due to manufacturing error, the structure is 2' short and because of this, one side (south side wall) of this bike shelter cannot accommodate bicycles on the top tier. The top tier on this side of the bike shelter will be blocked off using signs. The original capacity of this bike shelter was 96.

    There were several issues with this project:

    1. miscommunications between the vendor and the University staff
    2. lack of communication between the university staff and the Architecture Review Committee (ARC), which resulted in the purchase of a very large structure and, subsequently, change in the desired location for this structure
    3. staff change during the project
    4. lack of proper records and details about the project by the university staff in the beginning
    5. covid-19 pandemic resulted in some delay in this project as well
    6. miscommunications between the vendor and their manufacturers and engineering staff - which resulted in the delivery of wrong components and items of the structure. The structural design as reviewed and approved by the University was not what we received and the vendor did not rectify the error.
    7. missing components from the structure - there were several missing parts that the University had to cover (see the invoice for missing hardware). The University had to cover the cost of new Plexiglass as well as the missing roofing.
    8. descrepencies between the structural design, installation instructions, and the final delivery caused many more issues
      1. the structure was overall 2' shorter, i.e. the south wall of the bike shelter was supposed to be 8.5' high and the north was supposed to be 10' high, however, the after the construction, south wall and north wall came to be 6' and 8.5' high respectively. This descrepency caused the top tier of the south wall to be unusable.
      2. the original design called for Double-Docker style of bike racks, however, they had to be replaced with the Side Stage (vertical) bike racks
    9. vendor was sent the invoice for missing hardware, however, the vendor has not responded
    10. Awful customer support from the vendor

    There were issues at every stage of this project, which was not helped with the non-cooperative customer support at Ground Control Systems. Learn more about the installation cost using the AiM account for this project: 6043.

  9. Archived description: Bike Shelter at Flagg Hall

    Associated Project(s): 

    This Bike Shelter is 14' x 63', and it can accommodate up to 84 bicycles in two tiers. It was purchased from Ground Control Systems in 2018, and was initially planned to be installed to the West of Main Library. However, due to contruction conflicts, the location had to be changed. In 2019, several locations were identified and examined, for example, the Psychology Building and North of Henry Aministration Building (HAB). The HAB location was more suitable since it was a high demand area, however, the Bike Shelter was too big for the location, and the Architecture Review Committee (ARC) denied the location, citing the conflict of this structure with beautification of the main Quad.

    In November 2019, North of Flagg Hall was identified as the new location for the bike shelter and it was approved by ARC. The bike shelter is expected to be installed and ready to use by the end of November 2020.

  10. Student Code update approval: §2-605 Operation of Bicycles

    The Conference of Conduct Governance (CCG) at the University of Illinois Urbana-Champaign has approved the changes proposed to the §2-605 Operation of Bicycles section of the Student Code during their June 2021 meeting. The Student Code will be updated with the following information over the summer 2021 in digital and printed format.

    Please see attached the previous version of this section versus the updated information.

  11. Update on "Draft Bicycle Crash Reporting Form Created"

    From: Prasad, Sarthak

    To: DeLorenzo, Stacey; White, Morgan

    Recipients: sdeloren at illinois.edu; mbwhite at illinois.edu

     

    Hi Stacey and Morgan,

     

    I was just looking at the Improve Reporting and Metrics for Bicycles project, and I saw a project update from 2013 by Amelia Neptune “Draft Bicycle Crash Reporting Form Created”. Does either of you remember if this form was actually made public or if there was any progress made on it?

     

    I think this is a very neat way to report a bicycle crash and could be very important. Please let me know if there is a final form. If not, I would like to revisit this effort.

     

    Thank you,
    Sarthak  

     

    Sarthak Prasad

    Sustainable Transportation Assistant

    Facilities & Services

    University of Illinois Urbana-Champaign

    Phone: 217-300-9575

    Email: sprasad9 at illinois.edu

  12. Weekly Update: Bike donations; Kid's bike giveaway on July 17

    All, Last week we got inundated with donations. I counted 8 bikes donated on Friday alone. That doesn’t include wheels, tires, and parts that we received as well. We’ve got nearly half a dozen bikes in the queue that once on the sales floor will free up some space for more donations.

    Our friends at TBP are hosting another Kids’ Bike Giveaway event for July 17th. We have a dozen or so bikes we’ll be able to contribute to that event. That’ll clear up some more space, too.  

    This week I hope to be able to start a new student worker.

    The numbers:

    Visitors:
    Sales: $103.75
    Tire/tubes: 4 for $31

    Thanks!

    Jacob Benjamin
    Manager, Campus Bike Center

  13. Archived Info - Previous Project Background

    Associated Project(s): 

    The University of Illinois was the first academic institution that joined the U.S. Environmental Protection Agency’s SmartWay Transport Partnership.  "As the first-ever academic institution to register in SmartWay, University of Illinois at Urbana-Champaign leads the way for universities and other institutions to work as shippers in SmartWay and engage with their carriers and suppliers to improve freight efficiency, reduce greenhouse gases and other emissions from goods movement while also helping enhance our nation's energy security,” said Christopher Grundler, director of EPA’s Office of Transportation and Air Quality.

  14. Archived Info - Previous Title & Project Description

    Associated Project(s): 

    Title: SmartWay Transport Partnership

    Description:

    The University of Illinois is an Affiliate of the U.S. Environmental Protection Agency's SmartWay Transportation Partnership. The SmartWay program aims to reduce global freight emissions by providing strategies for shippers and carriers to adopt more sustainable practices. While Dining Services joined the program in 2013, the University will now be able to make these changes on a campus-wide scale as an Affiliate.

    SmartWay Transport®” is a registered service mark of the U.S. Environmental Protection Agency

  15. Weekly Update: BTWD and LTN dates finalized

    All, Steadily picking up around here. Had to pull out the folding stands on a couple occasions. Got a new hire in the works. Dates are set for Light The Night and Bike To Work Day for the fall. On Friday we had a volunteer working towards a membership, which was a welcome occurrence.

    This week is business as usual.

    The numbers:

    Visitors: 20
    Sales: $1022.10
    Bikes (refurb): 3 for $500
    Memberships: 5 for $150
    Misc: $58.50

    Thanks!

    Jacob Benjamin
    Manager, Campus Bike Center

  16. Bike Registration Signs: 6/26 meeting between Sarthak and Shayna

    Associated Project(s): 

    In today’s meeting, we discussed the email we received from ARC about location and size of our signs. We are sticking with the size we discussed earlier, 12x18, and the idea is to mount them on posts. However, that will have an additional cost so the range of signs and posts we can produce will be around 10-15. That will be enough to target our priority locations. Before the next meeting with the ARC on Tuesday, we have to finalize a map with the specific locations pinpointed with images. This map will be created by Sarthak Prasad because he will be using the Bike Census information.

  17. list of projects needed

    This is a list of projects that need students to work on.  It will be updated periodically by sustainability staff members, the last update was 6/24/21:

    • Develop informational messaging about SmartWay, get more UIUC departments aware of the program, and coordinate a related student event.  Contact Morgan White at mbwhite at illinois.edu.
    • Conduct a campus poll (fall semester 2021) regarding the Top 10 most iconic/significant/impressive trees on campus (including the arboretum). Develop an online survey tool (i.e., an online poll) whereby students and campus employees can nominate their favorite campus trees. Upon conclusion of the survey, work with Jay Hayek to tabulate and rank the results and create a publicly viewable ArcGIS Online StoryMap showcasing campuses Top Ten Trees. Prepare a presentation of results for the annual Arbor Day Celebration. Contact Jay Hayek at jhayek at illinois.edu.
    • Follow through with Facility Liasons for implementation of recommendations from NRES 285: iCAP Sustainability Ambassadors class: Illini Union.
    • Follow through with Facility Liasons for implementation of recommendations from NRES 285: iCAP Sustainability Ambassadors class: Huff Hall.
    • Follow through with Facility Liasons for implementation of recommendations from NRES 285: iCAP Sustainability Ambassadors class: ECE Building.
    • Follow through with Facility Liasons for implementation of recommendations from NRES 285: iCAP Sustainability Ambassadors class: Armory.
    • Follow through with Facility Liasons for implementation of recommendations from NRES 285: iCAP Sustainability Ambassadors class: Bevier Hall.
    • CCNet Website: Work with the Champaign County Sustainability Network (CCNet) leadership team to redesign and publish the CCNet website (old version is online at http://www.champaigncountynet.org/). There is a monthly brown bag sustainability networking event on the Third Thursday of each month, but the website hasn't been updated since 2016. Contact Morgan White at mbwhite at illinois.edu.
    • We are seeking a student volunteer who can do tree identification for a series of trees in the Arboretum, and work with the University Landscape Architect, Brent Lewis, and the Superintendent of Grounds, Ryan Welch, to compare the tree identification to the draft tree inventory. Contact Morgan White at mbwhite at illinois.edu.
    • If you have a project idea, please contact us at sustainability@illinois.edu, or submit it through the iCAP Portal Suggestions page.