  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Purchasing analysis of paper and recycled-content underway

    Morgan Johnston and Hursh Hazari met to review the FY15 paper purchases by academic college.  Hursh is going to add some analysis about the costs associated with switching to a minimum of 30% recycled content paper.  He is also going to take the draft purchasing policy proposed to UA (attached here) and modify it to meet UIUC CAM standards.

  2. discussion to add solar PVs at Idea Garden Shed

    Associated Project(s): 

    The Idea Garden committee, with the UI Extension, continues discussions about adding rooftop solar to the Arboretum Garden Shed hear the Idea Garden.  Last year, Idea Garden representatives worked with Masters of Energy Systems students to consider potential design plans.  The final scope of the desired solar PV project is still to be determined. One likely option is to use solar to power the light in the shed, and use the existing campus electrical grid to provide other power needs, such as winter heating.

  3. Meetings with Building Experts

    Associated Project(s): 

    With the finalized format of the energy report card and the compiled major events documented in Facilities and Services’ records, Ms. Morgan Johnston, Ms. Barnes, and I scheduled meetings with facilities staff who have the most knowledge about how each building works. This week, we talked to Ms. Mylinda Granger, Ms. Pat Malik from Disabilities Resources and Educational Services; Mr. Greg Anderson from Temple Hoyne Buell Hall; and Ms. Carol Young, Ms. Kari Cooperider, and Mr. Steve Hess from the Business Instructional Facility. They shared important information and wanted to help share the report with building occupants.

     

    Next step is to revise the draft report cards based on these meetings. In the next few weeks, more meetings will be scheduled.

     

  4. Weekly Update

    Associated Project(s): 

    All, most notable thing last week: Everyone was very good about leaving in a timely manner. Two or three times the stands were empty and staff were cleaning up with a solid 10 minutes left for open hours. That was a pleasant surprise.

    The bulk of the LTN lights arrived last week. I will have a volunteer this week get a tally on total units received. Todd, TBP volunteer, came and picked up scrap on short notice, which was very helpful.

    Sales were good. Overall: $1,163.50; 2 refurbished bikes for $310; 3 B-a-Bs for $174; 6 memberships for $180; and 12 tires/tubes (used and new) for $131.

    This week I will build bikes, work on organization, and did I mention building bikes? There has been a strong demand for them. And while I love selling bikes,...Expand »

  5. Weekly update for Zero Waste

    Associated Project(s): 

    Hello all,

    Here are my updates from last week:

    • Battery recycling information in the iCAP portal has been updated to reflect the change from the dual rechargeable/single-use recycling program to the unified program offered through Call2Recycle. I have a note out to Morgan and Joy to double-check accuracy.
    • I’m continuing work on the glove recycling program materials. I got answers to questions I sent to Fisher and now await answers from Kimberly Clark.
    • As you know, CRI’s new owner (Midwest Fiber) does not offer glass-only recycling pickup service. I have to call and/or email them to see if they will continue to accept drop-offs. I have also started calling local waste haulers and recyclers to see if any of them offer glass recycling pickup
    • ...Expand »
  6. Report Card Layout Finalized

    Associated Project(s): 

    During this week’s meeting, Ms. Johnston, Ms. Barnes, and I finalized the layout of the energy report card. The front of the card consists of 3 graphs -- annual energy consumption from 2008 to 2017, monthly energy consumption of the most recent fiscal year 2017, and annual potable water consumption from 2008 and 2017. Notable events (such as retrocommissioning) associated with changes in trends are also included. The back of the card consists of 3 sections -- building systems, iCAP goals & current progress, and future actions.

     

    Meanwhile, I went through documents obtained from Facilities & Services regarding major projects in each of the 10 buildings. Next week, we will meet with building managers to discuss some questions...Expand »

  7. Most of the planting complete

    Associated Project(s): 

    This project is ongoing, but all milestones in the SSC grant request have been met. Purchases of additional plants were made in multiple batches, and they have been added to beds on the south, east, and north sides of LAR in addition to the shared courtyard between LAR and Allen Hall. There are a few plants that still need to be planted, but most are in the ground at this time.

     

  8. Total campus GHG Emissions FY08-FY16

    Greenhouse gas emissions are generally categorized into three “scopes.” Scope 1 consists of emissions resulting from on-campus activities that we have direct control over and includes combustion at Abbott Power Plant, fleet emissions, and agricultural emissions. Scope 2 consists of emissions resulting from purchased electricity, which we have a moderate degree of control over. For example, we could reduce Scope 2 emissions by entering into power purchase agreements with low-carbon energy sources such as wind farms, biomass power plants, or nuclear power plants. Scope 3 consists of other emissions that occur off campus as a result of campus activities; these include commuting, air travel, solid waste, and the effects of purchasing goods and...Expand »

    Attached Files: 
  9. Archived info - SSC marketing subcommittee info

    Here are the tasks we need to focus on starting with the highest priority.     1st Web Development. http://ssc.union.illinois.edu. The website looks pretty nice but its content is lacking particularly in the projects page. There are pictures missing for many completed and under construction projects (I am currently working on that).      2nd Encourage more people to work on working groups. The more people involved in the process the more of an impact the committee will have on campus.      3rd Have more people, particularly students, submit proposals      4th Have the committee be known throughout campus. I would be willing to do some research to see what percentage of the school knows...Expand »

  10. MTD Newsletter for August 2017

    Welcome to MTD's Fall 2017 Service Year

    MTD’s 2017-18 service year began yesterday and new Maps & Schedules books are now available on our buses and at Illinois Terminal. Pick up yours today & let us know if you have any questions-just call 217.384.8188 or email us.

    In addition to a few timetable and routing adjustments, our passengers and the public should be aware of several larger changes this year: MTD has moved to a Designated Stops system, Round Barn Road in Champaign is now the main transfer point for routes in west Champaign, and MCORE project work will continue to cause reroutes in and around Campustown.
     
    School trips for Unit 4 and District 116 middle and high schoolers will begin this Wednesday, August 16, and just...Expand »

  11. Weekly Update

    Associated Project(s): 

    All, last week was fairly busy. We had a few days wherein there was extended waiting times for free stands. We had been averaging about 100 people in the space per week but this week we were at 117, and I’m sure there were half a dozen who we missed. As it nears the Great Student Migration we’ll see more and more visitors.

    Sales: Overall: $1,661.20; refurbished bikes: 6 for $860; Build-a-Bikes: 2 for $220; memberships: 4 for $120; tire/tubes (new and used): 20 for $117.

    On Friday a Bike Project volunteer and I went to the warehouse and picked up about 20 bikes for refurbishment, 3 of which were Neutral Cycle rental bikes that were mistakenly confiscated. I coordinated with their manager to return them. As I was leaving the warehouse two...Expand »

  12. Weekly update for Zero Waste

    Associated Project(s): 

    Hello all,

    This past week, I

    • Attended a CURC webinar on how to engage more participation in campus recycling programs.
    • Drafted material to promote the glove recycling program, which is with Morgan and Anna. There is a lot of missing information, so this coming week, I will contact Kimberly-Clark and Fisher representatives to start filling it in.

    Sincerely,

    Marya Ryan
    Zero Waste Coordinator

     

  13. Discussion with Mr. Damon McFall regarding specifics during RCx 2008 in NCEL

    Associated Project(s): 

    A meeting was held with Mr. Damon McFall, director of Facilities and Operations, for the Department of Mechanical Engineering. He was involved in all operations during retrocommissioning (RCx) in Newmark Civil Engineering Laboratory (NCEL) in 2008. As I was going through the records, some questions regarding specific systems in the building and improvements during RCx 2008 came up. Mr. Damon McFall shared useful information at the meeting. Below are the major events that play important roles in energy consumption in the building.

     

    • Repaired faulty/non-functioning controls for 28 air handling units

    • Reduced number of exhaust fans and/or air quantities

    • Occupancy schedules were used to reduce fan systems at night &