You are here
Projects Updates for Use Electric Vehicles (EV)
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- Associated Project(s):
Information on Electric Vehicles from Gabriel Lewis
Associated Project(s):The following is an email sent from Gabriel Lewis to Morgan White regarding EV research.
Hi Morgan,
I’m doing research for the local municipalities on Electric Vehicles (EVs), to start out with a literature review.
Katie Simpson in Savoy mentioned that you/UIUC were starting discussions last fall about researching EVs as well. I know it’s a broad topic, but are they any updates or information I should be aware of from the University side?
I found a couple of relevant search results online:- iCAP EV Task Force – an objective in FY22 is to form this task force – any update on this?
- iCAP Install Public Use EV Charging Stations webpage
- EV Charging info on the Parking Department website
I think we’re most interested right now in how to provide sufficient charging infrastructure in buildings (via retrofits and requirements for new buildings) and in public places (streets, parking lots, municipal facilities, recreational facilities, etc.).
Thanks,
GabeIntroductory meeting with Robert O'Daniell
Associated Project(s):I met with Robert O'Daniell on Wednesday, April 27, 2022. We covered several topics, including the electrification trend, Federal and State tax credits for EVs, but majority of the time was dedicated to learn about the EV charging stations in Champaign County as compared to other cities.
Robert also shared his own experience as an EV owner and the survey he is currently conducting to gauge interest in increasing the number of public-use EV charging and possibility of introducing DC Fast Charging to the campus and Champaign County.
I will create the survey on Google Forms, and then help deploy it on-campus. We also discussed where to promote this survey.
See attached the documents that we covered during this meeting.
Attached Files:Alternative Fuels Corridor map
Boost Charger 150 kW EV DC Fast Charging
EV charger using current light poles wiring
EV rebates - illinois clean energy job act rebate.pdf
Charging an ID4 at Electrify America
know the puzzle NYT.pdf
EV charging information for EV owners
Beam Solar EV Arc 2020
Robert's EV Survey
Volta Level-2 charging
Two 100% all electric 2022 Ford F-150 Lightning trucks purchased for F&S fleet
Associated Project(s):From: Varney, Peter W
Sent: Tuesday, April 19, 2022 12:38 PM
To: FandS Executive Management Team ; Gordon, Malikah Asrayyah ; Breitwieser, Steven
Cc: Patterson, Shawn L ; Franzen, Neil
Subject: Ford Lightnings for F&SAs mentioned this morning, I have been able to secure two of the brand new 2022 Ford F-150 Lightning for F&S. These are all-electric crew cab pickup trucks with a ~200 mile range. The vehicles are equipped with a 9.6kW power system including multiple 120V and a single 240V outlet. Cargo payload is only about 1,600# or 2/3 of a standard F-150.
These vehicles should allow for my team to gain familiarity with all-electric vehicles in our fleet as well as campus visibility regarding F&S’ commitment to sustainable fleet technology. I believe one of the vehicles would be a good fit in my Transportation Shop but I’m open to suggestions for the second truck. ETA will be in the June/July timeframe.
Malikah – I want your team to be aware for any story/messaging opportunities. I also think we can use some special signage or wrap on the vehicle exterior.
Pete W Varney
DIRECTOR
Transportation & Building Services
Facilities & Services
University of Illinois at Urbana-ChampaignEV Procurement Law in Illinois
Associated Project(s):EO 2108, ELECTRIC VEHICLE PROCUREMENT. The executive order provides that the state shall: (1) develop and implement a program for procurement of electric and other low emission or zero emission vehicles for state purposes; (2) establish a State Fleet Working Group convened by the Department of Central Management Services and composed of representatives from the Department of Transportation, the Illinois Environmental Protection Agency, and the Illinois Commerce Commission; (3) set forth the responsibilities of the working group; (4) direct the Department of Central Management Services, in conjunction with other state agencies, to develop a plan to install electric vehicle chargers on state property; and (5) direct the Illinois State Board of Education to collaborate with the Department of Transportation and the Illinois Environmental Protection Agency to develop tools and provide information to assist school districts in assessing the benefits and costs of zero emission bus options when replacing school buses. The executive order became effective 22 APR 21.
https://www2.illinois.gov/Pages/Executive-Orders/ExecutiveOrder2021-08.a...
note about UIC sister campus
Associated Project(s):UIC has a Level 3 charging station in a parking garage on the east campus.
EV production planned in Joliet, Illinois
Associated Project(s):Lion Electric, a Canadian electric vehicle (EV) company, recently announced that they will be building a new production plant in the State of Illinois. It's estimated that it will also create 750 jobs. More...
(per https://secondnature.cmail19.com/t/ViewEmail/i/27E89D64BDC442102540EF23F...)
12/2 Transportation SWATeam Meeting
Associated Project(s):Attached are the meeting minutes for the 12/2 Transportation SWATeam Meetings, as well as the Zoom chat file.
Discussed were the following:
- Telecommuting/Teleconferencing Policy and Commputer Program Intern
- EV Parking Department Dashboard Data
- EV Task Force
Attached Files:11/18 Transportation SWATeam Meeting
Associated Project(s):Attached are the meeting minutes and chat from the Zero Waste SWATeam meeting on 11/18.
Discussed were the following topics:
- Establishing a telecommuting/teleconferencing policy.
- Discussing working with an interdisciplinary health intern in IHR to tackle research/application of teleconferencing/telecommuting policy and commuter program.
- Establishing an EV Task Force through the Parking Department to re-assess campus EV needs.
Attached Files:10/16 Transportation SWATeam Meeting
Associated Project(s):Attached are the meeting minutes from the 10/16 meeting.
Discussed were the following:
AmpUp Demo
Attached Files:Transportation SWATeam Minutes - 11/30/17
Associated Project(s):The Transportation SWATeam discussed the opportunities, challenges, and feasibility of campus fleet car-sharing to reduce emissions from the campus fleet. They also discussed air travel offsets
Attached Files:Transportation iCAP efforts in progress
Associated Project(s):Hello Transportation SWATeam members,
Thank you again for your willingness to help our campus achieve the Climate Leadership Commitments. There is great value provided by the bi-weekly meetings of student, faculty, and staff representatives evaluating our progress and recommending additional actions campus units could take.
The following is a list of current activities I am aware of, and suggestions I have about useful next steps. I am happy to follow up with you on any of these, as needed.
Thank you very much,
~Morgan
Transportation
- EV analysis for department’s assigned vehicles – Hursh Hazari worked with Pete Varney’s data to evaluate the possibility of replacing some fleet vehicles with EVs. https://icap.sustainability.illinois.edu/project/use-electric-vehicles-ev-campus
- Pete Varney has established the F&S fleet as a certified green fleet. Pete, do you create an annual report for the status of that which you can share? If not, can you provide an update to the SWATeam and to me?
- Last year the SWATeam discussed encouraging additional campus units to get certified as green fleets. Your team could submit a recommendation for another unit (or more than one) to pursue that certification.
- New EV Chargers – Scott Willenbrock is working on one at the Illini Union + Phil Krein is interested in getting more Type 1 chargers for the North Campus Parking Deck.
- Potential EV Study – At the Oct. 11 Workshop for the Living Lab research connections to iCAP, there will be seed funding offered and the study for transitioning to EVs could collect and use data on campus vehicle use. Pete has example data, which could be used to support the request for seed funding, which could then possibly fund data collection for the study.
- We do not yet have new air travel emission data. iSEE is working on creating a virtual storeroom to offer carbon offsets to campus units to voluntarily buy air travel offsets. The storeroom has funding for the first 10,000 offsets, but I understand there was a hurdle on selecting appropriate offsets with additionality. I recommend asking Ben McCall and Scott Willenbrock about it.
- A new Mode split survey is needed as soon as possible. Lily Wilcock intends to bring this as an item for discussion. We would appreciate it if you would help define the survey questions, and then iSEE can help distribute the survey to get updated figures.
- Bike Plan – I suggest you ask Stacey DeLorenzo to join one of your meetings to give an overview of the status of the Bike Plan infrastructure upgrades.
- Lily has funding for a Bike at Illinois website, which Creative Services will develop in the winter and spring months this fiscal year.
- Lily has worked with MTD to offer bus tours to show campus staff how to use the MTD. We teach all our new student how to ride, but none of the new employees get the personal introduction. These tours are very successful, when they are organized with a specific department or location.
- Bike Parking – there is a significant capacity issue, which is noticeable just by looking around campus, especially during class hours in the core area. Lily has a new website that she can show you, and there is an upcoming Bike Census, which your team members should help with.
- Bike Sharing – a handful of dockless bike sharing companies are wanting to come to town/campus. To manage their impacts (imagine bikes in the boneyard) they will be required to obtain city permits. Lily is asking the SSC to use the funds they allocated to bike sharing for additional bike parking areas in the heart of campus.
- MCORE – this project has several impacts on multi-modal transportation. You can learn more at http://www.mcoreproject.com/project-construction-updates.
New York Times article on EVs
Associated Project(s):New York Times article on electric vehicles (EVs):
Idea for LEED transportation credit
Associated Project(s):The LEED transportation credit for encouraging low emission vehicles can be obtained if there are dedicated spaces for low-emission vehicles near the building in question. In general, the University is not adding new parking spaces for new buildings, so it is difficult to achieve this LEED point. One method is to add a Zipcar space for the building, and another is to add an Electric Vehicle charging station. Grant Colella, a Project Manager at F&S, suggested a long-term plan to change all of the campus fleet to low emission vehicles, so the dedicated service vehicle spaces would also be low emission vehicle spaces.
Solar Car Small and Full project Funding Agreement
Associated Project(s):Illini Solar Car was established last year with aims to design, build, and race a commercially-viable, solar-electric vehicle to compete in the 2019 World Solar Challenge. To meet this long term goal, the organization has the interim goals of building a lighter, single-seat vehicle to allow for competition in the 2016 American Solar Challenge, 2017 World Solar Challenge, and 2018 American Solar Challenge.
Illinois Solar Car has already received two small grants of under $5,000 each to work on prototyping aspects of their system. Though they have received significant donations of equipment such as solar panels and motors from outside companies, basic supplies to manufacture the car itself still must be purchased.
The full project funds the remaining costs associated with completing Solar Car’s first full-sized vehicle, with the expectation that having one completed vehicle opens the door for expanded funding opportunities from other sponsors.
Nissan talking with iSEE
Associated Project(s):Eric Heineman (former Sustainability Director for Governor Pat Quinn) is now working at Nissan. He said, "We are interested in setting up some Ride and Drive (test drives), some sort of university employee/alumni discount for all employees, and just raise greater awareness of Electric Vehicles in Urbana-Champaign."
Award Letter - Solar Car
Associated Project(s):This project is to build and test a scaled-down prototype of the electrical system of a solar car. The major parts of this prototype are the solar array, maximum power point trackers (MPPT), rechargeable batteries, and a load. The solar array will be made of flexible silicon crystalline solar cells encapsulated (to protect from debris and enhance performance) and mounted on a contoured composite panel that mimics the surface of our car body. The applicant will design and build our own MPPT which is a variable DC/DC boost converter that raises the voltage of their array. The MPPT has a feedback loop control to ensure maximum output from the array under different insolation and temperatures. The rechargeable batteries will be Li-ion batteries that will act as a buffer energy source when sunlight is not available or is insufficient to power the system. Although Li-ion batteries have a high energy density, they require a battery management system to ensure safe and optimal operation. Thus, they will purchase a battery management system that is suitable for our car. Lastly, the energy generated by the solar array will power a load, which will be a motor planned to be borrowed from another team.
Attached Files:Award Letter - Solar Car.pdf
EN - Solar Car Prototype Full Project CS Letter.pdf
EN - Solar Car Prototype Full Project EDC Letter.pdf
EN - Solar Car Prototype Full Project Step 2.xlsx
EN - Solar Car Prototype Photos.docx
EN - Solar Car Prototype Small Project Support.docx
EN - Solar Car Prototype Small Project.xlsx
Volts at the Car Pool for check-out from the Fleet
Associated Project(s):See files
Attached Files: