Projects Updates for place: Business Instructional Facility (BIF)

  1. 18F Semesterly Report - BIF Rooftop Solar

     

    The BIF project was initially scheduled to begin in January 2018, but was on hold until F&S and the College received word from the state regarding the general contractor award.  The kickoff meeting took place in March 2018 and a planning meeting followed in April. 

     

    On Monday, May 21st, construction kicked off and is expected to be complete summer 2019.  Thus far, the following work has been completed (64% complete):  removal of rooftop garden; insallation of steel, metal, and concrete decking; roof membrane installed; installation of roof drain lines; installation of exterior and interior walls;  window and ductwork installation; HVAC updates/upgrades; above ceiling mechanicals and sprinkler lines installed; GWB taping and sanding with painting underway. 

     

     

  2. Happy Sustainability Week!!

    Join iSEE, the Student Sustainability Committee and Facilities & Services for a "plogging" fun run/walk, a tour of Abbott Power Plant, a celebration event with organizations and RSOs that includes the Energy Conservation Incentive Program awards and updates on Illinois Climate Action Plan goals, a socially responsible investing program, and the popular Illini Lights Out energy savings event.

     

    Tony Mancuso . Institute for Sustainability, Energy, and Environment (iSEE)

     

    Sustainability Week Events Oct. 21-27

  3. Info Night 9/12

    Associated Project(s): 

    Illinois Enactus Information Night
    Illinois Enactus uses the power of entrepreneurial action to transform lives and shape a better, more sustainable world. In 2017, we ranked top 8 in the nation amongst hundreds of Enactus teams! Our 10 projects seek to tackle social inequities, economic disparities, environmental sustainability, and more. We welcome and encourage all majors to apply - and would really appreciate urban planning students' unique perspective as well as expertise. 

    September 12th, 7-8 PM 
    Wohlers 141, Business Casual

    Learn more at illinoisenactus.com, feel free to reach out to Jasmine Tew at jtew2@illinois.edu with any questions.

  4. Filify 3D Receives SSC Funding

    Filify 3D is a new project this semester, working to make 3D printing more sustainable and eco-friendly. This semester, the project is looking to sell fused filament ends (which are otherwise thrown away) back to campus 3D Printing labs. They will also be constructing and refining the design to a shredder and extruder to recycle failed prints. Ultimately, they hope to expand their capacity to be able to recycle plastic water bottles for use in 3D prints. This project is a cross functional one.

    The Student Sustainability Committee is providing funding for some materials and supplies.

    Attached Files: 
  5. Stay Glassy Receives SSC Funding

    Stay Glassy looks to target glass bottles, an abundant and unused resource in the Champaign-Urbana community, to create a product that will benefit the community. By working with underserved members of our community to create a viable marketplace product, Stay Glassy achieves two goals: reduce glass waste and create meaningful employment in Champaign-Urbana. This semester, the project is changing scope from educating the community through "at home'' glass up-cycling workshops to focusing on a glass repurposing business. Project associates should expect to work on aspects of business development and product innovation.

    The Student Sustainability Committee funded project supplies and workspace.

    Attached Files: 
  6. FY17 ECIP award winners announced

    Occupant Action Category

    % Improvement

    Incentive Award

    1. Foellinger Auditorium 41.0% $61,994
    2. Natural Resources Building 21.0% $38,543
    3. 1207 W. Oregon 19.4% $15,677
    4. Agricultural Engineering Sciences
        Building
    13.6% $12,986

    Energy Advancement Category

    % Improvement

    Incentive Award

    1. Early Child Development
        Laboratory
    25.2% $10,000*
    2. Administrative Information Technology
        Services Building
    24.1% $10,000*
    3. Astronomy Building 23.4% $10,000*
    4. ACES Library, Information &
        Alumni Center
    23.2% $10,000*

     

  7. iWG meeting minutes October 27, 2017

  8. ECBS SWATeam Meeting Minutes

    The Division of Intercollegiate Athletics (DIA) is looking to become more involved with the SWATeams and sustainability on campus. ECBS proposed ideas such as decreasing refrigerator usage, making a climate action plan specifically for DIA, and promoting recycling at tailgates. Illini Lights Out had their first event on September 29, and it was a success. 284 light switches were turned off in 13 different buildings. The Green Labs Coordinator position is slowly making progress, but there is a concern with funding. Updates on the ECIP were made, and there is a push being made for mid-year checkpoints in the future. ECBS also discussed if AFMFA projects could be redefined in order to do more maintenance-based projects. 

    Attached Files: 
  9. BIF Greywater Meter Recommendation - approved

    The Water and Stormwater SWATeam recommendation to install a real-time water meter on the greywater pipes in the Business Instructional Facility has been approved by F&S leadership.  This project will proceed with funding from the Student Sustainability Committee and F&S Utilities & Energy Services.

  10. archived info - previous project description

    Associated Project(s): 

    The Business Instructional Facility (BIF) was designed for future use of greywater, which is raw (untreated) water. Although the building is fed from the potable water supply, there is separate piping for the urinals and water closets in the building. Utilities does not yet have a greywater system in place. When such a system becomes available, the connection in BIF that serves its fixtures can then be transferred to the greywater supply.

  11. High School students go on tour of Green Infrastructure at UIUC

    Eliana Brown with the Water Resources Center and Morgan Johnston with F&S Sustainability provided a two hour tour on July 13, 2017 to six Illinois high school students through the NRES Research Apprenticeship program. Sites visited include the BIF green roof, the Ikenberry Commons permeable pavement, the First Street underground stormwater detention basin, the "square pond" (six-story deep hole near Locust and Springfield), the Boneyard Creek, and the stormwater murals in the College of Engineering.

  12. BIF Solar Installation Agreement

    A strategic goal of both the UIUC and the College of Business is to attract and attain the best faculty. In order to do that, it is essential to provide faculty with office space that allows them maximum productivity. The fourth floor of BIF has proven to be excellent space where faculty can work on research. The fourth floor faculty offices are highly sought after by research faculty due to quality of space, location, convenience, and security. As the College expands the fourth floor to include sixteen new offices, there is an opportunity to include a PV solar panel system. The Student Sustainability Committee has agreed to fund $60,000 toward the total initial cost of $157,340 to fully fund all $48,000 of direct construction and equipment cost for a 12.5 kW array as well as $12,000 in general conditions and contingency. Any other costs will be funded through the College of Business. This proposal directly funds: 1) Solar panels and inverters 2) Limited installation costs 3) Some contingency and general conditions.

  13. Funding Letter - Raw Water Metering

    The Business Instructional Facility (BIF) was constructed with a separate raw water system that conveys non-potable water for the purpose of flushing toilets. While the system is in place, it was never connected to an outside source of non potable water largely due to current non-progressive plumbing codes. Metering the raw water system at BIF would provide data about the temporal total and non-potable water demand in a typical class/office building. F&S installed a temporary meter to measure flow to the raw water system and operated this meter for approximately one month between April and May 2016, which yielded promising results. In particular, for the month that the meter was in place, results indicated about 2/3 of the water used in BIF was for the non-potable lines. Because building usage can vary dramatically during the year, it is recommended to install a meter permanently. Once the meter is installed, the data is intended to be used to support changes to plumbing codes, allowing raw water to be used more easily, as well as changes to the campus construction codes, requiring that separate raw water systems be installed in new buildings and during major renovations of existing ones. This proposal directly funds: 1) An additional meter for the BIF Raw Water line 2) Installation costs.