Hydrologic
The SSC approved $10,000 in funding for Hydrologic at Illinois in Spring 2020. This project expires 5/14/2022.
The SSC approved $10,000 in funding for Hydrologic at Illinois in Spring 2020. This project expires 5/14/2022.
The SSC approved $4,840 in funding for Biodesign at Illinois in Fall 2020. This project expires 12/16/2022.
In May 2021, Allison Biernacki analyzed documents regarding the BIF solar project located at Building #1206. These files were provided by the Project Manager, Kevin Price. According to Biernacki, there are 19 panels at 345W with 97% efficiency.
See the attached file to view the original source of data, including Module & Inverter Cut Sheets, as well System Specifications for the project.
The attached file shows the production of the new rooftop solar panels on BIF from June 2019 to March 2021. It also includes the approximate reduction in carbon emissions and the equivalent number of "trees saved."
The new 12.5 kW array will be the second rooftop installation at the facility. The current array, on top of Deloitte Auditorium, produces about 41,000 kilowatt-hours (kWh) annually, – or about 3.4% of the electricity needed to power BIF for an entire year. The new array will be smaller but will supply enough power to offset the anticipated energy usage of the fourth floor addition by contributing 15,500 kWh per year.
https://giesbusiness.illinois.edu/news/2019/04/22/solar-panels-added-to-...
Monthly totals for water consumption in the greywater pipes at the Business Instructional Facility have now been added to the corresponding iCAP portal page. In the future, totals will be updated upon request. Send requests through the Suggestions form on the iCAP Portal.
See the attached spreadsheet to find the daily totals from Mid-October 2019 to November 2020. Vales are listed in gallons, measured per year as the overall usage.
F&S has renewed our campus' recognition as a Green Power Partner for FY20 through the Environmental Protection Agency. This voluntary program promotes the use of green power, and the combined supply for the Champaign-Urbana campus during FY20 was 7.2% of the total electricity usage.
Please see the attached file to see a more in-depth look at the green power supplied and generated on campus
iSEE and F&S are excited to invite you to the Campus Sustainability Celebration 2020! This is an annual event that is especially exciting this year with the signing ceremony of the Illinois Climate Action Plan (iCAP) 2020, (once every five years) and the presentation of energy conservation and Freezer Challenge awards. Everyone is invited and encouraged to stay afterward for a social-hour!
Campus Sustainability Celebration
October 20, 3 pm • Map
Meredith Moore • Institute for Sustainability, Energy, and Environment
This opportunity is available online.
Additional rooftop solar was installed on the Business Instructional Facility (BIF) in summer 2019. The construction drawings called for 19 solar PV panels rated 200-360W, with microinverters, with a fixed tilt for each panel ranging from 21 to 40 degrees off the roofing surface.
"Why doesn't the company installing the solar panels at U of I put them over the parking lot? I would provide shade for the cars underneath and would eliminate having to kill whatever would be underneath them in the fields."
The best option for building solar panels is ground-mounted, said Morgan White, the associate director for sustainability at the University of Illinois.
"As part of our Climate Leadership Commitments the University of Illinois at Urbana-Champaign has a goal of producing at least 25,000 megawatt-hours (MWh) per year from on-campus solar," she said. "When we evaluated options for meeting this goal, rooftop solar, solar over parking areas, and ground-mounted solar were all considered. The most cost-effective option is ground-mounted solar, and it also allows for larger-scale installations.
"For a sense of the scale, the two solar farms will be a total of 75 acres, while the largest parking lot on campus is less than 15 acres.
"When installing solar panels over parking areas, there are additional infrastructure and labor costs to raise the solar panels above the ground level. Although we do not currently have any solar over parking areas, Facilities & Services is working with the Parking Department to evaluate potential locations for a pilot installation. We are also continuing to install rooftop solar on individual buildings."
Solar panels are on the following five Urbana campus buildings:
— Business Instructional Facility
— the Activities & Recreation Center
— Wassaja Residence Hall
— University High School Gymnasium
— Electrical and Computer Engineering (ECE) Building.
"I'd also like to emphasize that the ground-mounted solar panels do not harm the plants under them. After building the first Solar Farm, we learned that there was an excellent opportunity for growing useful plants under and around the panels," said White. "This is a great opportunity for creating a multi-functional ecosystem, with pollinator supportive plants and protected areas for small animals and insects."
F&S completed the renewal of our recognition as a Green Power Partner through the US Environmental Protection Agency. Green Power Partners of our scale now have to use renewable power for seven percent of their annual consumption, an increase from the previous requirement of three percent. Fortunately, the FY19 green power supply for FY19 was 7.28%. See attached file.
Overview submitted: The University of Illinois at Urbana-Champaign is proud of its sustainability initiatives, as documented in the Illinois Climate Action Plan. The first project was a 32.76 kilowatt (kW) solar photovoltaic (PV) array on the Business Instructional Facility in 2009. The 14.7 kW PV array, ground mounted at the Building Research Council, is a research platform for the Information Trust Institute. The most significant on-campus renewable energy generation project to date went into operation in December 2015, with the completion of the 5.87 megawatt (MW) Solar Farm, producing approximately 7,200 MWh/year. In December 2015 another solar array was installed on the new Wassaja Residence Hall roof with a capacity of 33 kW. In September 2016, campus signed a ten-year Wind Power Purchase Agreement for 25 million kWh/year. Most recently, the Electrical and Computer Engineering (ECE) Building had 970 rooftop panels installed. Since production began in April 2019, 11% of all power supplied to the ECE Building has been from the rooftop panels, not including the panels that are used for student-oriented research. The University will soon be home to Solar Farm 2.0, which is projected to produce 20,000 MWh/year, nearly tripling on-site production.
Hello ECIP winners,
When the Energy Conservation Incentive Program (ECIP) was launched in 2013, it included financial awards that distributed some of the centrally managed campus utility funds back to the winning buildings. The calculation system was based on placement (first place to fourth place) in the awards program and the award category (occupant action or energy advancement). You can see the calculation in the attached fact sheet from 2016, if you are interested. With the Integrated and Value-Centered Budget (IVCB) reform, we transitioned this year, and we are closing out the initial phase one of the ECIP.
Some of the original award funding has not yet been allocated to an associated facility improvement project. If you have remaining funds and have not yet committed to a specific project, please do so as soon as possible. All ECIP award funds must be committed by the end of this fiscal year, so please let us know your plans.
Now in phase two, the ECIP awards include a plaque and the associated prestige, and no additional monetary awards (see attached revised fact sheet). Instead, your colleges will benefit directly from the energy savings. Additionally, to increase the visibility of the great progress all of you have made, we are collaborating with the Illinois Solar Decathlon’s Concept Team (incoming freshmen, learning about building systems and sustainability). They will be completing a simple Building-Level Energy Report card for the 50+ ECIP winners this fall. In the spring, I will send those reports to you with an opportunity to connect with the Concept Team members.
Later this week, I will send a follow up email to the FY19 winners with images to help you spread awareness of this award. Congratulations again to all of you, and thank you very much for your past and ongoing contributions to the campus sustainability and energy efficiency efforts.
Sincerely,
Morgan
|
||||||||||||||||
|
||||||||||||||||
|
||||||||||||||||
|
Facilities & Services |
|
||||||||||||||
|
Here are the winners for the 2018 ECIP Awards!
Occupant Action | % Improvement | Incentive Award |
1. Turner Hall | 21.8% | $103,130 |
2. Art and Design Building | 19.9% | $37,816 |
3. Burrill Hall | 19.8% | $57,518 |
Energy Advancement | % Improvement | Incentive Award |
1. Coordinated Science Laboratory | 47.2% | $84,308 |
2. Seitz Materials Research Laboratory | 44.4% | $91,537 |
3. Loomis Laboratory of Physics | 40.7% | $25,717 |
4. Harker Hall | 38.0% | $10,000 |
The new version of LEED (v.4) requires shower facilities for bicyclists as a pre-requisite. The LEED point is described online at https://www.usgbc.org/credits/neighborhood-development-plan-neighborhood-development/v4-draft/sllc4.
The greywater piping system at BIF uses potable water, but in FY19 F&S started tracking the water consumption that goes through the greywater pipes. The meter for that water consumption is not in the Energy Billing System because it does not get billed separately. It is on the DDC system as 1206-W3. The meter base ID is 1206-W3. Usage can be requested from accounting or email Robbie Bauer.
The BIF project was initially scheduled to begin in January 2018, but was on hold until F&S and the College received word from the state regarding the general contractor award. The kickoff meeting took place in March 2018 and a planning meeting followed in April.
On Monday, May 21st, construction kicked off and is expected to be complete summer 2019. Thus far, the following work has been completed (64% complete): removal of rooftop garden; insallation of steel, metal, and concrete decking; roof membrane installed; installation of roof drain lines; installation of exterior and interior walls; window and ductwork installation; HVAC updates/upgrades; above ceiling mechanicals and sprinkler lines installed; GWB taping and sanding with painting underway.
Join iSEE, the Student Sustainability Committee and Facilities & Services for a "plogging" fun run/walk, a tour of Abbott Power Plant, a celebration event with organizations and RSOs that includes the Energy Conservation Incentive Program awards and updates on Illinois Climate Action Plan goals, a socially responsible investing program, and the popular Illini Lights Out energy savings event.
Tony Mancuso . Institute for Sustainability, Energy, and Environment (iSEE)
Illinois Enactus Information Night
Illinois Enactus uses the power of entrepreneurial action to transform lives and shape a better, more sustainable world. In 2017, we ranked top 8 in the nation amongst hundreds of Enactus teams! Our 10 projects seek to tackle social inequities, economic disparities, environmental sustainability, and more. We welcome and encourage all majors to apply - and would really appreciate urban planning students' unique perspective as well as expertise.
September 12th, 7-8 PM
Wohlers 141, Business Casual
Learn more at illinoisenactus.com, feel free to reach out to Jasmine Tew at jtew2@illinois.edu with any questions.
Spring 2018 Semesterly Report Submitted to the Student Sustainability Committee (SSC) for the rooftop solar project.