You are here

Projects Updates for place: National Soybean Research Center

  1. Open Geothermal at ISTC Project Funding Agreement

    The goal of this project is to conduct a feasibility study regarding installing an open geothermal loop underneath the Illinois Sustainable Technology Center.  The open geothermal loop would take water from one of the many nearby aquifers and only introduce heat into the system.   The project will increase awareness of geothermal systems, determine the physical and chemical attributes of the aquifer, and study integrating the geothermal system with the current HVAC system.  The ISTC hopes to decrease their energy use and greenhouse gas emissions by 25%-50%. The ISTC would test the procedure on this building, but hopes to extend it to other campus buildings.  Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $27,000.

  2. Occupancy Sensors (Automatic Lighting Controls) Funding Agreement

    The goal of this project is to install lighting sensors in classrooms in several University instructional buildings (e.g. the Armory, the Foreign Language Building and Loomis). The sensors will switch off the lights in these areas, after 30 minutes of inactivity, which will reduce lighting consumption by ~30%. Additionally, having these retrofits take place at the same time as additional lighting upgrades will reduce overall installation costs. Given the reduction in lighting and electricity usage, the high visibility to students of the target areas and student interest in this technology, the Student Sustainability Committee is in favor of funding the full requested amount of $50,000.

  3. MechSE Sustainability Senior Design Funding Agreement

    Students in the Department of Mechanical Science and Engineering have been working on projects to improve the sustainability of our campus. The Department has requested support to carry out to projects (designing a sump pump water collection and use system, and assisting with the retro-commissioning of Siebel Center), which will are high-impact projects and will involve students. Thus, the Student Sustainability Committee is in favor of funding them to the amount of $6,000 ($4,000 for the water project, and $2,000 for the retro-commissioning project – with the expectation that Computer Science will underwrite the remainder).

  4. Measuring Sustainability Metrics of the Green Roof @ BIF Funding Agreement

    The goal of this project is to support class projects to assess the impact on sustainability of the green roof atop the new Business Instructional Facility. Students will get the opportunity to make measurements of the filtration and thermal properties of the green roof. Additionally it is hoped that these projects will help establish the roof as a laboratory for future student and faculty research projects on this topic. Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $13,100.

  5. Mapping Sustainability Class Funding Agreement

    The goal of this project is to help inform the campus and community of sustainability related programs, facilities and organizations in the Champaign-Urbana area. This grant will pay for a student RA and GPS equipment to support a class project to map the above, thus adding an educational component to this proposal.  Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $3,200.

  6. Green Link at School of Art + Design & Krannert Art Museum Funding Agreement

    The goal of this project is to construct a green roof atop the Link Gallery between the School of Art + Design and the Krannert Art Museum. This project will be implemented primarily by students and faculty of the School of Art + Design and will be in a highly visible campus location. It will help reduce energy costs at the facility and provide rain water for the surrounding gardens. As Facilities & Services is expected to cover half the cost of resurfacing the roof, the Student Sustainability Committee is in favor of partially funding the  proposal in the amount of $63,900.

  7. Green Allerton Wood-fired Boiler Funding Agreement

    The goal of this project is to replace a natural gas heating system at Allerton Park with an Outdoor Wood-fired Boiler System. This replacement will eliminate considerable CO2 emissions from the current system and result in substantial cost savings. The use of a renewable resource (wood) in place of a non-renewable one (natural gas), combined with the greenhouse gas emissions reduction will help increase campus sustainability, thus the Student Sustainability Committee is in favor of funding the full requested amount of $25,500.

  8. Campus Recreation Water Conservation Funding Agreement

    Water conservation initiatives have generally taken a back seat to energy conservation at the University of Illinois. Campus Recreation has proposed a comprehensive upgrade of restroom facilities in all three of their buildings, with the potential of reducing water consumption by almost 6.5 million gallons annually. This work would be highly visible to students and in a fellow student-fee supported unit. Thus, the Student Sustainability Committee is in favor of proving upto $30,000 in incentives at the rate of $0.30 per $1.00 spent.

  9. Bike Parking Funding Agreement

    The goal of this project is to fund installation of bicycle parking facilities at the Undergraduate Library, the Ag. Sciences Engineering Building and Freer Hall. Cycling is a sustainable form of transportation, highly used by the student body, and inadequately supported on campus. Thus the students sustainability committee is in favor of funding the full requested amount of $10,600.  

  10. Everitt Electrical Building

    Associated Project(s): 

    A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.

  11. Agriculture Engineering Sciences Building

    Associated Project(s): 

    A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.

  12. Henry Administration Building

    Associated Project(s): 

    A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.

  13. Armory

    Associated Project(s): 

    A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.

  14. Mumford Hall

    Associated Project(s): 

    A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.

  15. Plant Sciences Laboratory

    Associated Project(s): 

    A total of 1,009 lighting fixtures in the Plant Science Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 159,182 hours. The Simple Payback for changing the fixtures in the Plant Sciences Laboratory is 3.25 years.

  16. Madigan Laboratory

    Associated Project(s): 

    A total of 2,587 lighting fixtures in Madigan Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 401,383 hours. The Simple Payback for changing the fixtures in Madigan Laboratory is 2.35 years.

  17. Loomis Laboratory

    Associated Project(s): 

    A total of 2,001 lighting fixtures in Loomis Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 316,267 hours. The Simple Payback for changing the fixtures in Loomis Laboratory is 2.61 years.

  18. Materials Research Laboratory

    Associated Project(s): 

    A total of 2,253 lighting fixtures in the Materials Research Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 360,623 hours. The Simple Payback for changing the fixtures in the Materials Research Laboratory is 1.63 years.

  19. Materials Science Engineering Building

    Associated Project(s): 

    A total of 893 lighting fixtures in the Materials Science Engineering Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 154,715 hours. The Simple Payback for changing the fixtures in MSEB is 3.99 years.