  1. Weekly Update: Sales numbers, new hires

    Associated Project(s): 

    All, Last week we had some ominous weather that didn’t turn out to be much. Our visits were down but only barely—I expected a bit of a nosedive that didn’t materialize. Champaign Cycle donated some kids bikes and box store bikes, which is always appreciated. We had another person start a B-a-B.

    This week I’ve got another interview, some new hires starting, and a staff meeting on Thursday night. I’ll also draft a B-a-B/Membership flyer to better explain those programs as there’s been some consistent misunderstanding/miscommunication on that front.

    The numbers:

    Visitors: 34
    Sales: $933.50
    Bike (refurb): 2 for $375
    Memberships: 6 for $180
    Tires/tubes: 5 for $50

    Thanks!

    Jacob Benjamin
    Campus Bike Center Coordinator

  2. Jen Fraterrigo's comments to the DESMAN EV proposal

    Associated Project(s): 

    Following are Jen's comments:

    1. Currently, there is limited public level 2 charging on campus and in the vicinity of campus. Yet we have many visitors to campus who are coming from out of town and may therefore need to charge their vehicle while here. If chargers are (only) added to parking permit facilities, visitors will not have access to them.
    2. Related to the point above, it is unclear if faculty, students, and staff who do not hold a permit for those facilities (but may hold a permit for other parking areas or may not hold a permit at all) will be able to use the chargers.
    3. I wonder if the analysis could take into account commuter driving distance when estimating demand. Many of us with EVs charge at home and rarely need to charge while on campus because the trip is within the range one can travel on a full charge. Consequently, the demand could be lower than expected.
    4. Finally, I think it is important to evaluate the spatial distribution of potential charging locations. We should aim to distribute these in an way the serves all of campus. It is possible that parking facilities are evenly distributed and thus chargers will be as well, but this is not clear from the parking study.
  3. Alec & Sarthak Meet to Discuss 2023 Bicycle Friendly University Application (BFU)

    Sarthak Prasad and Alec McKay met to discuss Alec helping Sarthak with the 2023 BFU Application. Sarthak provided some guidelines on getting up to date with the current status of the Bike Plan goals and objectives.

    A document containing notes Alec took is attached below.

  4. Weekly update: Busy week, Build-a-Bike, bike donations

    Associated Project(s): 

    All, Surprisingly busy start to the semester! On Friday afternoon we even had a wait on stand time, which is unheard of for January. Unfortunately, that was partially due to allowing First Visit Free repairs, which left a couple due-paying members waiting. They didn’t mind but still. For how busy we’ve been I’m already wondering if we should be open 5 days a week. However, it has been a mild winter thus far; the real test will be how many folks show up after the projected snow on Wednesday. We also had one person select and start a B-a-B.

    This week I’ll schedule our staff meeting, some interviews, as well as receive a “vanload” of bikes from Champaign Cycle. They generally give us good quality stuff that we can put to use quickly, so fingers crossed. Additionally, we still have 100+ bikes to move out of the warehouse.

    The numbers:

    Visitors: 37
    Sales: $961
    Bikes (refurb): 3 for $565
    Memberships: 7 or $210
    Tires/tubes: 7 for $39

    Thanks!

    Jacob Benjamin
    Campus Bike Center Coordinator

  5. Campus Bike Plan update: information for the undergraduate student

    Hi Bumsoo, I had a call with Marc yesterday, and he mentioned that the MUP program can work on this project in the fall and spring semesters as a group project. I am still trying to figure out all that needs to be done for this project, and I think getting the help from your student might be beneficial.

    How many hours can your student set aside for this project? In this semester, your student could help identify the stakeholders to reach out for the Campus Bike Plan update. He can help with determining a timeline and the planning process for next academic year. (If time permits) I will also ask the student to present some preliminary suggestions for the 2024 Bike Plan update at the end of this semester.

    The first thing for your student would be to read the current 2014 Campus Bicycle Master Plan (https://icap.sustainability.illinois.edu/files/project/37/2014%20Campus%20Bicycle%20Plan.pdf). I have published two progress reports in the past few years. I am currently working on our progress report from the past year, which should be published in the next few weeks. Here is the 2022 report: Campus Bike Plan progress report FY22. Here is the 2019 report: 2019 Report for 2014 Campus Bicycle Plan

    I would like to have weekly meetings with student. In the next 2-3 weeks, I would schedule a meeting with Morgan and Stacey to present what we think we should accomplish at the end of this semester. At the end of the semester, he will present the findings to F&S, SPO, Transportation iCAP Team, and possibly to the Campus Transportation Advisory Committee (CTAC).

    Please let me know if this sounds good to you. I would be very happy to meet your student and get started on this project. Thank you,
    Sarthak

  6. Commuter Program page published and the form is live!

    The Commuter Program page is live on the TDM website: https://fs.illinois.edu/services/more-services/tdm/commuter-program-bus-bike-and-hike. We will start with an e-update to recruit people from F&S, and then reach out to e-week and other newsletter for this pilot (cut-off at 15 participants). The recruitment will end on Feb 10, and the program will launch Feb 15.

    Register here: go.fs.illinois.edu/CommuterProgram

  7. 2024 Campus Bike Plan update: collaboration with Department of Urban Planning

    Sarthak Prasad met with Marc Doussard, the Master of Urban Planning (MUP) Director, to talk about MUP capstone and how their students can assist with this project. Marc said they can bring this project to the class int he fall 2023 and spring 2024 semesters and assist in the update.

    Bumsoo Lee also mentioned that he has an undergraduate student who is very interested in helping out with this project in the spring 2023 semester.

  8. Weekly Update: Shop re-open, Law school orientation

    Associated Project(s): 

    All, Last two weeks we’ve been closed so no sales/visit numbers. TBP members and I moved bikes from the warehouse, and I’ve been checking over the 30 or so new bikes for damage. Sarthak and I tabled at the Law School’s orientation last Thursday.

    This week we reopen. We’ll be open M/W/F 2 – 6p for the winter months and bump back to 5 days a week after spring break when the weather warms up.

    Thanks!

    Jacob Benjamin
    Campus Bike Center Coordinator

  9. Nathaniel Nevins to help with the Campus Bike Plan update

    Sarthak Prasad met with Nathaniel Nevins, high school senior, on Tuesday January 17, 2023. Nathaniel is going to help with the Campus Bike Plan update. He is going to read the 2014 Campus Bike Plan by February 15, 2023, and read both the progress reports for Campus Bike Plan by February 28, 2023. He is also going to suggest ideas for the update. Nathaniel will be volunteering over the spring semester. Following information was shared with him:

    Here is the link to the iCAP Portal: https://icap.sustainability.illinois.edu/

    Here is the 2014 Campus Bike Plan: https://icap.sustainability.illinois.edu/files/project/37/2014%20Campus%20Bicycle%20Plan.pdf

    Here is the 2022 report: Campus Bike Plan progress report FY22

    Here is the 2019 report: 2019 Report for 2014 Campus Bicycle Plan

  10. planning for the next bike plan

    Morgan and Sarthak discussed the timeline for the next Campus Bike Plan.  The 2014 plan was completed in 2014 and formally approved in March 2015 by Chancellor Wise, with an end date of 2024.  We should have the new plan approved before the end of December 2024.  It would be great to have it available to present during Sustainability Month October 2024, and get formal approval through the Sustainability Council and/or CCRC in November/December 2024.  Thus, the goal is to have a plan ready for routing for approval in summer 2024.

  11. EV steering committee - Confirmed

    Associated Project(s): 

    On January 10, 2023, University of Illinois Parking department finalized the Electric Vehicle (EV) steering committee. This committee includes

    • Marty Paulins
    • Maria McMullen
    • Paul Slezak
    • Stacey DeLorenzo
    • Jim Brennan
    • Sarthak Prasad
    • Morgan White
    • Meredith Moore
    • Jen Fraterrigo
    • Ria Kontou
    • Brian Finet
    • Shawn Patterson
    • Dave Lancaster
    • Mary McElvain
    • Tyler Swanson
    • Steve Bainbridge
    • Yanfeng Ouyang
    • Kelly Jo Hoffman
  12. Electric vehicle steering committee

    Associated Project(s): 

    Below is an email exchange between Maria McMullen and Marty Paulins:

    Dear Colleagues,

     

    Parking is in the process of forming a steering committee to develop university standards and policies regarding electric vehicle charging stations on the UIUC campus.  We will be partnering with Desman Consulting to develop the document and recommendations.  You are receiving this email because we would like you to serve on the steering committee.  We have worked with various divisions within F&S to identify individuals who have expressed interest, and who have in-depth knowledge of university infrastructure and systems.  Please let us know if you want to serve on this committee by next Friday, October 14, and we will set-up a time to meet in the next couple of weeks.

     

    Thank you,

     

    Marty

    --------------------------------

     

    Good morning,

     

    Thank you for agreeing to serve on the EV steering committee. You should have received an invitation to a folder in Box containing the parking study done by Desman. I have also attached it to this email. Please review this document and provide your feedback.

     

    Warmly,

     

    Maria S. McMullen

  13. Weekly Update: final week of semester, WCIA

    Associated Project(s): 

    All, The final week of last semester was, as expected, quiet. Very little traffic but Alex finally finished his Build-a-Bike. He’d been steadily and meticulously working on it all semester. We were able to fix up approximately 30 kids bikes here at CBC and totaled 50 for the event which happened on Saturday 12/17/22. We had 4 people bow out last minute to help for the event (thanks covid), so we had a skeleton crew but still gave away 50 bikes in about 20 minutes. The IMC staff were extremely helpful and stepped up to corral and organize folks when we were getting overwhelmed. Some folks left unhappy, I’m sure, but we still helped out a good number of kids. WCIA showed up just in time to get some footage of families departing with the last of the bikes and our story made the 10p news that night. I’ll reach out to WCIA and see if they can send me a digital copy of the broadcast so we can share that.

    This week I’ll be moving bikes from the warehouse and taking stock of our inventory, sorting bikes for our various programs, and working up some classes for next semester. Next week I’ll be tabling at College of Law orientation/resource fair. Always exciting to meet new/different groups on campus!

     

    The numbers:

    Visitors: 13
    Sales: $190

    Build-a-Bike: $40

     

    Thanks!

     

    Jacob Benjamin
    Campus Bike Center Coordinator

  14. Ford Lightning allotted to Abbott Power Plant and EV charging station installed

    Abbott Power Plant are the recipients of one the new Ford F150 Lightning Electric Trucks.

    There is a charging station in the alley between the plant addition and scrubber where the vehicle can be parked and charged (see photo below). The plug on the truck is on the side in front of the driver side door.

    The key for the new truck is in the control room at Abbott. The key is a FOB that must be in the vehicle to start it. Similar to other new vehicles, the truck is started when the FOB is in the vehicle with you, you press the brake, and then hit the start button. Since it is electric you of course will not hear the motor engage and start, but the car will “come to life” with the dashboard coming on and displaying. The vehicle can now be put into gear and driven.

    NOTE, the vehicle comes equipped with “engine braking” engaged. So, when you take your foot off the accelerator, the electric motor will “reserve” (turn into a generator) and start slowing down the vehicle (and at the same time charge up the batteries).

    Please be careful when driving the truck for the first time and take some time to get accustomed to how it works.

    Attached Files: 

Pages