You are here

Projects Updates for place: Garage/ Car Pool

  1. Insider article on 9/21/22: Ahead of the Curve and All Electric

  2. EV charging stations and a personalized update about EVs - Robert O'Daniell

    Following is an email from Robert O'Daniell regarding EV charging stations and his experience during his recent road trip.

    From: Robert O'Daniell
    Sent: Wednesday, September 14, 2022 2:58 PM
    To: White, Morgan; Prasad, Sarthak; Kontou, Eleftheria
    Subject: A personalized update about EVs

     

    Hi - I did another roadtrip this weekend.  At a DCFC I chatted with a guy on a longer road trip that was intent on charging to 100%.   He was there a very long time as the charger slows remarkably as they go beyond 90%. For him to charge from 90% to 100% would take 15 minutes to get 25 miles. I spent 12 minutes at Target and got 75 miles of charge. 

     

    As this year has rolled on, attempts to improve my EV charging survey has waned. There has been decreasing willingness of people participating and I was having doubts about the questions I was asking.   So I have stopped.  And then the EV sections of the Inflation Reduction Act turned everything on its head.  

    Even the piece by Kontou that the July 28th IDOT WebEx meeting mentioned  as cutting edge shows its age in only a little over two years.  ( first a disclaimer - inspite of being a math major at UI 50 years ago, the equations and graphs in her report are a little too esoteric for me.)  But some of the basic information  demonstrates remarkable changes,  It mentioned 50 kw charging as fast, now NEVI mandates a minimum of 150kw (350 kw is now fast).   Mentioned charging locations that numbered at 1300.  Now Tesla alone has 1200 supercharger locations,  The mentioned EVgo has dropped from prominence, now Electrify America from its infancy in 2019 now leads the way. Electrify America currently has 800 and most are up to NEVI standards.   EVs charging up on off-peak hours takes advantage of unused capacity at those times ( and gets a discount). And now with two way charging, EVs can put power back on the grid at some heavy peak use periods. (Known as V2G)  Predictions of some EV issues will be difficult.


    Recent V2G articles.  

    https://electrek.co/2022/08/25/electric-school-buses-supply-80-hrs-energy-massachussetts-grid/

     

    BMW, Ford, GM will help incentivize California EV drivers to charge off-peak

     

    Can a Garage Full of Revel Taxis Stop the Next Blackout?

     

    Brooklyn-based Vehicle-to-Grid Bidirectional Station Charging back into NYC Grid | EnergyTech

     

    Alf+T0JozD8AAAAASUVORK5CYII=

     

    So - EV charging will have two opposite effects on the grid.  Occasionally add to a peak load. But also help balance the load on the grid by taking some energy during off-peak hours and putting it back during peak load pressures. 

     

    EV charging also has another opposition.   DCFC continuing to get faster and  Levels 1 & 2 staying the same or getting slower. 


    The two factors are the "60% rule" and the increasing acceptance of convenience charging. 

     

     The 60% rule is to only charge between 20% and 80% (the 60% in the middle).   This protects battery life and has the advantage of saving time. Saved time is illustrated in the opening paragraph of this email.  3 times the charge in slightly less time.

     

    Accepting convenience charging is maximizing charging convenience.  Speed at DCFC.  And if its not convenient, I don’t charge (even if free). A different take on “Willingness To Pay” (if the charger is 100 yards away and I’ll only get 10 miles, why bother)

     

    Faster = = DCFC & the NEVI guidelines. DCFC is at least twice as fast when charging from 20% to 30% than it is when  charging from 70% to 80%.  Nobody (should) wants to charge to 100%, where the charging speed is similar to Level 2 charger.  Lots of current EVs charge faster than my car, and I can add 75 miles in the time it takes to use the rest room.  With the NEVI 50 mile interval, it guarantees roadtrips with minimal times as drivers plan better. 


    Slower = =  For my home, I spent $200 on the slowest level 2 charger available (16 amp).  Even if my VW is down to 20% when I go to bed, my "slow" charger will add enough range to get from CU to Woodridge ( 142 miles) when I get up.  In the 8 hour “off peak” window, 90 miles can be added. 

     

    Since few people in this area need 75 miles to get home from work, those that need to add charge before leaving work for home can get what they need from the slowest level 2 chargers.  This could save money for places like UI by reducing the cost of the EVSE and the necessary wiring for them.  It would be interesting to know if any workers at UI would  pay extra to rent a reserved parking space with a charger. (For those with longer commutes or no chargers at their apartment complex)

     

    We need to get our municipal leaders to get involved with IDOT and get one or more of the DCFC locations paid for with Federal money (NEVI program). Those DCFCs could fulfill all of UI needs for short term EV charging and the need for level 1 or 2 charging spaces.   But as a visible sign of support of sustainability issues, some should still be there. 

     

    Level 2 destination chargers scattered throughout the community will always be both used and appreciated,  As EV drivers learn the most efficient ways to charge, their WTP for level 2 charging will wane.   WTP for DCFC will always be there.


    Thank you for your time. 

     

    ps.  as a side note - a few details to go but I will be doing an EV interest group at OLLI soon.  (OLLI - UI affiliate of Osher Life Long Learning Institute)

     

    Robert K. O'Daniell

    Photographer Emeritus-News-Gazette

  3. Sarthak met with Gabe Lewis to talk about Electric Vehicles and EV charging

    On May 24, Sarthak Prasad met with Gabe Lewis to talk about EVs. Gabe is the Transportation Planner at the Champaign County Regional Planning Commission (CCRPC) and he currently leads the RPC Tech Committee which consists of 7 members – Champaign, Urbana, Savoy, Rantoul, St. Joseph, Mahomet, and Champaign County. Most recently, they had been talking about the feasibility of EVs in urban as well as the rural areas in the county.

    We talked about the US DOT's Charging Forward, an EV toolkit, that is primarily focused on EV Charging in the rural areas: https://www.transportation.gov/rural/ev/toolkit

    We also talked about Clean City Coalition. State of Illinois does not have a coalition, but Chicago has one and we could potentially reach out to them: https://cleancities.energy.gov/coalitions/

    https://cleancities.energy.gov/coalitions/chicago

    Also discussed the federal funding available through National EV Infrastructure (NEVI), Carbon Reduction Program (CRP), State and Local Planning for Energy (https://maps.nrel.gov/slope/), and EV Pro Lite (https://afdc.energy.gov/evi-pro-lite)

  4. Meeting between Sarthak Prasad, Morgan White, and Robert O'Daniell

    Robert O'Daniell met with Morgan and me on Friday, May 13, 2022. We talked about the following topics:

    • The University's upcoming task force for EVs. There will be two task forces -
      • On-campus
      • Community
    • Reserve List for new EVs - backlog of about 18 months. Ford is not putting more people on this list now.
    • How much EVs/Hybrids save over time
      • With the Tax credits and saving on fuel, the cost is very comparable and sometimes cheaper than gasoline car
      • Maintenance cost of EVs are very low
    • EV Town initiative at Bloomington/Normal area
    • QwikTrip chargers
      • None currently in Champaign
    • We talked about possibly adding Solar Arc at Lincoln & Florida parking lot
      • I will look at the product and possibly ask SSC for funding in the future
    • We also talked about the people Robert has reached out to so far
    • EV-Go
    • Electrify America
    • Where to place a Fast Charger in Champaign-Urbana?
    • I will connect Robert with Gabe Lewis at CCRPC.

    Robert also provided some documents that were updated from last meeting with me (Introductory meeting with Robert O'Daniell)

  5. Information on Electric Vehicles from Gabriel Lewis

    The following is an email sent from Gabriel Lewis to Morgan White regarding EV research.

    Hi Morgan,

     

    I’m doing research for the local municipalities on Electric Vehicles (EVs), to start out with a literature review.

     

    Katie Simpson in Savoy mentioned that you/UIUC were starting discussions last fall about researching EVs as well.  I know it’s a broad topic, but are they any updates or information I should be aware of from the University side?


    I found a couple of relevant search results online:

     

    I think we’re most interested right now in how to provide sufficient charging infrastructure in buildings (via retrofits and requirements for new buildings) and in public places (streets, parking lots, municipal facilities, recreational facilities, etc.).

     

    Thanks,


    Gabe

  6. Introductory meeting with Robert O'Daniell

    I met with Robert O'Daniell on Wednesday, April 27, 2022. We covered several topics, including the electrification trend, Federal and State tax credits for EVs, but majority of the time was dedicated to learn about the EV charging stations in Champaign County as compared to other cities.

    Robert also shared his own experience as an EV owner and the survey he is currently conducting to gauge interest in increasing the number of public-use EV charging and possibility of introducing DC Fast Charging to the campus and Champaign County.

    I will create the survey on Google Forms, and then help deploy it on-campus. We also discussed where to promote this survey.

    See attached the documents that we covered during this meeting.

  7. Two 100% all electric 2022 Ford F-150 Lightning trucks purchased for F&S fleet

    From: Varney, Peter W
    Sent: Tuesday, April 19, 2022 12:38 PM
    To: FandS Executive Management Team ; Gordon, Malikah Asrayyah ; Breitwieser, Steven
    Cc: Patterson, Shawn L ; Franzen, Neil
    Subject: Ford Lightnings for F&S

    As mentioned this morning, I have been able to secure two of the brand new 2022 Ford F-150 Lightning for F&S. These are all-electric crew cab pickup trucks with a ~200 mile range. The vehicles are equipped with a 9.6kW power system including multiple 120V and a single 240V outlet. Cargo payload is only about 1,600# or 2/3 of a standard F-150.

    These vehicles should allow for my team to gain familiarity with all-electric vehicles in our fleet as well as campus visibility regarding F&S’ commitment to sustainable fleet technology. I believe one of the vehicles would be a good fit in my Transportation Shop but I’m open to suggestions for the second truck. ETA will be in the June/July timeframe.

    Malikah – I want your team to be aware for any story/messaging opportunities. I also think we can use some special signage or wrap on the vehicle exterior.

    Pete W Varney
    DIRECTOR
    Transportation & Building Services
    Facilities & Services
    University of Illinois at Urbana-Champaign

  8. update on indoor bin count

    Associated Project(s): 

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal. ~Sydney Trimble

  9. Master List of All Buildings With the 3-Bin Containers Updated

    Associated Project(s): 

    The master list for indoor 3-bin containers has been updated. This list includes all 3-bin station deployments, with information regarding the building, floor, and P-Tag associated with each individual bin. If applicable, additional information regarding their location is provided as well.

    See the attached file to review the updated master list for the 3-bin containers.

  10. iCAP Indoor Bins Metric Update

    Associated Project(s): 

    Hi Morgan!

     

    Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal.

     

    In the future, I think the iCAP team should consider changing the metric from number of buildings to number of deployed bins because not all campus buildings would be applicable for these bins. Especially if the buildings are offices, residential, or extension related. Orchard Downs and

     

    I also went ahead and updated the bin location master list that came with the project so your team can upload it. It was outdated and I have upgraded the layout of the list so it is easier to find information.

     

    Best regards,

     

    Syd Trimble

    F&S Waste Management Intern

    fandssydneyt2@mx.uillinois.edu | Skype: (217) 333-1128

    Garage & Carpool, Office D-3

    In Office primarily Monday, Tuesday, Thursday afternoons

    University of Illinois Urbana-Champaign

    Environmental Sciences - 2022

     

     

Pages