  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Sustainability Facts Sheet

    Attached are files for the Sustainability Facts Sheets in both a digital and printed form.

    This facts sheet is intended for the following audiences:

    • Demographics unfamiliar with campus sustainability.
    • New Faculty & Staff
    • New & transfer students
    • Outreach and Education programs
  2. Funding Approval for Outdoor Recycling Bins

    Evan DeLucia and Mohamed Attalla approved $310,000 of funding from the Carbon Credit Sales Fund for replacing outdoor trash receptacles with trash and recycling dual bins.

     

    An email of the approval is attached below.

    A project memo is attached below.

  3. Archived info - previous project description

    Associated Project(s): 

    Construction of a new 54-acre, 12.1 megawatt (MWdc) Solar Farm has been approved by the University of Illinois Board of Trustees as the sole member of Prairieland Energy, Inc. Referred to as "Solar Farm 2.0," the new utility-scale array will be located north of Curtis Road, between First Street and Dunlap Avenue in Savoy. Solar Farm 2.0 will produce approximately 20,000 megawatt-hours per year (MWh/year), nearly tripling the university’s existing on-site renewable energy generation. Completion of this project will then grant the University of Illinois with the title of being the third-largest user of renewable power generated on-site for all higher education facilities in the entire country.

    Project Inception

    In April 2017, the Energy Sustainability Working Advisory Team (SWATeam) recommended that to increase our campus’ generation of solar power, either an extension should be built onto the original Solar Farm or additional solar panels be installed across campus rooftops. From there, the idea of Solar Farm 2.0 was born. In November of that same year, the Sustainability Council approved the concept of this new solar farm, and a site selection was completed during spring 2018. 

    In the summer of 2018, after discussions with our neighbors in Savoy, the Chancellor’s Capital Review Committee approved the location, and a request for proposals was initiated. Different vendors from across the nation submitted proposals and various designs for this new solar farm, with nineteen submissions in total. By May of 2019, Sol Systems of Washington, D.C. was chosen to complete the project. A twenty-year contract was negotiated, and the overall project is on track to be completed by the end of 2020.

    Project Overview

    Sol Systems will be responsible for the design, construction, and maintenance for Solar Farm 2.0, and like Solar Farm 1.0, the Urbana campus will use all the generated power.  The $20.1M contract is anticipated to save the university $300,000 in the farm’s first year compared to electricity purchased from the wholesale MISO market. Prairieland Energy will buy the solar energy at a fixed rate of $45.99 per MWh, while the University of Illinois will receive the associated renewable energy certificates (RECs) and the right to claim the use of clean energy.

    Pollinator Habitat

    Other innovative features of Solar Farm 2.0 include the incorporation of a pollinator habitat located beneath the panels. Indigenous plants will be planted throughout the farm to welcome local and migratory birds and insects. Specifically targeted towards butterflies and bees, Solar Farm 2.0 will be a welcoming environment for wildlife, as well as being a demonstration site for meeting the requirements of the Pollinator Friendly Solar Site Act. A landscaped buffer will also be included in the final design of Solar Farm 2.0, creating visual screening of the solar panels along the south edge of the farm bordering Savoy.

  4. Study Abroad Carbon Offset Manual

    Leah Courtney and Parima Michareune, two GFX Scholars in the Women in Engineering program, worked with Meredith Moore in spring 2020 to develop a carbon offset manual for University of Illinois study abroad programs (manual attached). In fall 2020, we will work to pilot this carbon offset program for engineering students who study abroad. 

  5. Preliminary carbon offset research

    iSEE intern, Julija Sakutyte, and Meredith Moore have conducted preliminary research into successful local carbon offset programs, including what other institutions have implemented (summary attached). Next steps include: select a value per pound of CO2, develop scope of carbon emissions, identify local projects to fund, and track emissions reduced. 

  6. The Day After Tomorrow: Following Advancements of the New U of I Solar

    CUYSS Team|8/5/2020

    The Youth Climate Justice Forum presents this podcast series in which we will be trying to find ways for all of us to continue to work for climate justice during and after the coronavirus crisis. This week, Caroline and Grace interview Morgan White, Director of Sustainability at University of Illinois Facilities and Services. They are currently working to construct the University’s newest solar farm, building upon what they learned from their last solar project.

    https://youthclimateforum.wixsite.com/summit/podcast/episode/f942d20f/the-day-after-tomorrow-following-advancements-of-the-new-u-of-i-solar-farm

  7. Reduce Nitrates from Agricultural Stormwater

    Hello Illinois NLRS Partners, 

     

    The Illinois Nutrient Loss Reduction Strategy was released on this date five years ago.

     

    Thank you to all of the nutrient stakeholder partners who continue to give their time and resources to implement the strategy. While we still have a lot of work to do to reach our goals, we invite you to celebrate the anniversary by enjoying this “NLRS By the Numbers” video. 

     

    You can view the video on the Illinois NLRS Facebook page here. Feel free to share it on social media as well. 

     

    Thank you,
    Illinois NLRS Steering Committee

  8. Collaborating with ISU to develop Virtual Tours

    Matt Hagamann from Illinois State University (ISU) is leading a team to develop a Virtual Tour of the University of Illinois Solar Farms. In a July 2020 email, he explained:

    "Our project is funded through the Illinois Science & Energy Innovation Foundation, whose goal is to "address the human and community sides of energy and the electric grid," in our case through energy literacy programs.  Our current programs reach up to 25,000 students each year, but we're working on some digital resources which we hope will expand our impact.

     

    The digital project I would like to collaborate with your office on is a virtual reality project, where we expose students to technology, sustainability, and careers through an immersive experience.  We're targeting both a full VR experience as well as a more limited experience designed for smartphones.

     

    Our goal is to help students explore someplace they wouldn't normally have access to, in this case a solar farm.  After recording some footage using a 360-degree camera, we can let students explore that environment, read some virtual signage, then "tap" some workers on the shoulder in order to learn more about their job."

     

     

  9. Mailbag solar article: Suggestion for UI solar panels

    "Why doesn't the company installing the solar panels at U of I put them over the parking lot? I would provide shade for the cars underneath and would eliminate having to kill whatever would be underneath them in the fields."

    The best option for building solar panels is ground-mounted, said Morgan White, the associate director for sustainability at the University of Illinois.

    "As part of our Climate Leadership Commitments the University of Illinois at Urbana-Champaign has a goal of producing at least 25,000 megawatt-hours (MWh) per year from on-campus solar," she said. "When we evaluated options for meeting this goal, rooftop solar, solar over parking areas, and ground-mounted solar were all considered. The most cost-effective option is ground-mounted solar, and it also allows for larger-scale installations.

    "For a sense of the scale, the two solar farms will be a total of 75 acres, while the largest parking lot on campus is less than 15 acres.

    "When installing solar panels over parking areas, there are additional infrastructure and labor costs to raise the solar panels above the ground level. Although we do not currently have any solar over parking areas, Facilities & Services is working with the Parking Department to evaluate potential locations for a pilot installation. We are also continuing to install rooftop solar on individual buildings."

    Solar panels are on the following five Urbana campus buildings:

    — Business Instructional Facility

    — the Activities & Recreation Center

    — Wassaja Residence Hall

    — University High School Gymnasium

    — Electrical and Computer Engineering (ECE) Building.

    "I'd also like to emphasize that the ground-mounted solar panels do not harm the plants under them. After building the first Solar Farm, we learned that there was an excellent opportunity for growing useful plants under and around the panels," said White. "This is a great opportunity for creating a multi-functional ecosystem, with pollinator supportive plants and protected areas for small animals and insects."

    https://www.news-gazette.com/toms-mailbag/toms-mailbag-june-26-2020/article_65ef2976-09b9-526a-848d-1419c905b0ec.html

     

  10. Curtis Road landscaping

    Tom's Mailbag in the News-Gazette included information about the Solar Farm 2.0 landscape buffer: https://www.news-gazette.com/toms-mailbag/toms-mailbag-june-19-2020/article_ddf7f640-1c32-5024-98b0-74d8f4ecaa7e.html

    Curtis Road landscaping

    "Curtis Road from Neil Street and First Street in Savoy,  why are they planting several rows of tree and bushes?

    The work underway in that location is for a landscaped buffer between the University of Illinois' Solar Farm 2.0 site and the village of Savoy, said Morgan White, associate director for sustainability at the University of Illinois.

    "Since the start of the project, the university has incorporated the feedback of nearby residents and businesses in planning aspects to ensure that area is aesthetically pleasing and limits the future visibility of the array directly from Curtis Road," she said. "The buffer was designed by the University Landscape Architect at Facilities & Services, Brent Lewis, and it consists of native trees, shrubs and perennials specifically selected for their aesthetics and pollinator benefits.

    "The trees were funded by the Student Sustainability Committee, and the remaining costs were provided by Facilities & Services and the Institute for Sustainability, Energy, and Environment.

    "This extensive buffer planting, along with the 54 acres of native perennials and grasses under the solar panels, will help to establish a diverse pollinator habitat and strengthen ecosystems for local and migratory birds and insects, including butterflies and bees. This effort supports the university's commitment as a 'Bee Campus USA,' proving progress in awareness, native plant landscapes, and safe pest management.

    "When completed, the site will also serve as a demonstration for pollinator-friendly solar arrays, following the requirements of the Pollinator Friendly Solar Site Act, of which the university has taken the lead in creating."

  11. Spring 2020 Project Deliverables

    Final Project Deliverables for Spring 2020

    There were 7 projects completed by the WIE-GFX Abroad Scholars in the Spring 2020 semester of ENG 177

    1. Armory Bike Path Restoration
    2. Study Abroad Carbon Offset
    3. Electric Vehicle Charging Stations
    4. AASHE STARS Report 2020
    5. Food Waste
    6. Sustainability Best Practices Guide
    7. EPA SmartWay Program
  12. Design drawings being reviewed

    Associated Project(s): 

    The construction drawings for civil and electrical design for the solar farm 2.0 project are being reviewed by F&S, both design review and utilities and energy services, and should be completed in the next two weeks.

  13. Funding Approval for iCAP Portal Maintenance and Improvements

    Evan De Lucia and Mohamed Attalla approved $50,000 of funding from the Carbon Credit Sales Fund for iCAP Portal maintenance and improvements for FY20 to FY23. 

    "This will allow us to continue improvements to the iCAP Portal and continue to enhance the usability
    and impact of this well-used resource." -Morgan White (06/01/2020)

    The email of funding approval is attached below.

    The Memorandum of Understanding between iSEE, F&S, and MSTE is attached below.