Theme Status Project
Energy Completed FY18 RCx
Energy Completed SDRP Lighting
Energy Completed State Farm Center: LEED Gold
Energy Ongoing Biomass use on Campus
Energy Ongoing LED Street Projects
Energy Ongoing Retrocommissioning (RCx)
Energy Completed Krannert Art Museum LEDs
Energy Completed FY16 RCx
Energy Proposed Geothermal at the Energy Farm
Energy In Progress Use Clean Thermal Energy
Energy In Progress Energy Farm LED
Energy Ongoing LED Exit Signs
Energy Completed Kill a Watt Monitors at Libraries
Energy Completed Rooftop Solar Potential
Energy Completed Business Instructional Facility: LEED Platinum
Energy Completed Illini Union 104 & 222 Lighting
Energy Completed Main Library Steam Reduction Project
Energy In Progress FY25 RCx
Energy Ongoing Pipe Insulation
Energy Completed NCSA Petascale: LEED Gold
Energy Ongoing Wind Power Purchase Agreement (PPA)
Energy Completed Geothermal at the Campus Instructional Facility (CIF)
Energy Cancelled ISTC Geothermal Loop
Energy Ongoing Building Demolitions
Energy Ongoing Occupancy and Daylight Sensors
Energy Completed Surveying Building: LEED Gold
Energy Completed Oak Street Chiller Plant ESCO
Energy Proposed ECIP Championship Challenge
Energy Cancelled Rooftop Wind Vertical Turbines on PPSB
Energy Proposed Geothermal at President's House
Energy Completed Wassaja Hall Rooftop Solar PVs
Energy Ongoing LEED Certification
Energy Ongoing Facility Standards
Energy Ongoing Energy Conservation Efforts
Energy Completed Illinois Natural History Survey: LEED Silver
Energy Completed E37 Parking Lot Solar Lighting
Energy Ongoing LED Campus
Energy Proposed Reduce Energy Consumption from Computer Rooms
Energy Proposed Stop Burning Coal at Abbott Power Plant
Energy Ongoing Explore Options for 100 Percent Clean Campus Energy
Energy Completed Ikenberry Dining Hall: LEED Silver
Energy Completed Solar PVs on I Hotel and Conference Center
Energy Completed Green Allerton Wood-fired Boiler
Energy Completed Biomass Boiler at the Energy Farm
Energy Completed KCPA Lobby Lighting
Energy Completed FY09 RCx
Energy Proposed Wind Power on Campus
Energy Ongoing Convert Fume Hoods from CAV to VAV
Energy Ongoing Steam System Maintenance
Energy Completed Solar PVs on President's Garden Shed