Skip to main content
iCAP Portal
Illinois Climate Action Plan (iCAP)
University of Illinois Urbana-Champaign
Expand
Main
menu
Expand
themes
Search
Main menu
Home
Objectives
Projects
Archived Projects
Project Status Listings
Theme: Education
Theme: Energy
Theme: Funding
Theme: Resilience
Theme: Zero Waste
Theme: Reporting Progress
Theme: Research
Research Opportunities and Projects
Theme: Transportation
Theme: Land and Water
Map
Suggestions
About Us
iCAP Themes
Energy
Transportation
Land and Water
Zero Waste
Resilience
Reporting Progress
Engagement
Education
Research
Funding
Search form
Search
Configure
Configure block
Search form
Search
You are here
Home
Projects
Project Listing
Project Listing
Perhaps you would be interested in the
Hierarchical Project Display
?
Theme
- Any -
Energy
Transportation
Land and Water
Zero Waste
Resilience
Reporting Progress
Engagement
Education
Research
Funding
Sort by
Theme
Title
Status
Order
Asc
Desc
Per page
10
20
50
100
- All -
Theme
Status
Project
Energy
Ongoing
Pipe Insulation
Energy
Proposed
Space Marketplace
Energy
Completed
Kill a Watt Monitors at Libraries
Energy
Cancelled
ISTC Geothermal Loop
Energy
Completed
Rooftop Solar Potential
Energy
Completed
Biomass Boiler at the Energy Farm
Energy
Ongoing
Energy Conservation Incentive Program (ECIP)
Energy
Completed
FY09 RCx
Energy
Completed
Krannert Art Museum LEDs
Energy
Completed
Wassaja Hall Rooftop Solar PVs
Energy
Completed
Illinois Conference Center Expansion: LEED Silver
Energy
Ongoing
Energy Dashboard Project
Energy
Ongoing
Explore Options for 100 Percent Clean Campus Energy
Energy
Ongoing
Geothermal on Campus
Energy
Ongoing
Solar Power on Campus
Energy
Completed
FY10 RCx
Energy
Completed
BIF Rooftop Solar PVs
Energy
Completed
Solar Thermal at ARC
Energy
In Progress
Geothermal Battery at Energy Farm
Energy
Completed
Fume Hood Shut the Sash Campaign
Energy
Ongoing
Facility Standards
Energy
Completed
Geothermal at the Fruit Farm Admin Building
Energy
Completed
Green Allerton Wood-fired Boiler
Energy
Ongoing
Variable Speed Drives
Energy
Ongoing
Update Building Maintenance Procedures to Support Long-Term Energy Savings
Energy
Completed
Geothermal Test Well at Energy Farm
Energy
Proposed
Biogasification
Energy
Completed
Wassaja Hall: LEED Gold
Energy
In Progress
Building-Level Energy Usage Report
Energy
Completed
Ikenberry Dining Hall: LEED Silver
Energy
Completed
Illinois Natural History Survey: LEED Silver
Energy
Completed
Geothermal at the Campus Instructional Facility (CIF)
Energy
Completed
FY16 RCx
Energy
Ongoing
Wind Power Purchase Agreement (PPA)
Energy
Completed
Campus Instructional Facility: LEED Platinum
Energy
Completed
Huff Hall, Khan Annex: LEED Silver
Energy
Proposed
Geothermal at the Energy Farm
Energy
Completed
Yeh Student Center: LEED Silver
Energy
Completed
Illinois Street Residence Dining Renovation Addition: LEED Silver
Energy
Completed
Illinois Street Residence Wardall Hall Renovation: LEED Silver
Energy
Completed
State Farm Center: LEED Gold
Energy
In Progress
Geothermal at WPP
Energy
Ongoing
Building Demolitions
Energy
Completed
2012 Exterior Doorway LED Lighting
Energy
Completed
Illini Union 104 & 222 Lighting
Energy
Completed
NCSA Petascale: LEED Gold
Energy
Proposed
Solar at Willard Airport
Energy
Ongoing
Reduce Emissions from Energy Consumption
Energy
Completed
InSPIRE Solar Powered Outdoors Table (SPOT)
Energy
Completed
ECE Net-Zero Energy Building
Pages
« first
‹ previous
1
2
3
4
5
6
7
8
9
…
next ›
last »